ARMY MIL-P-60090 B-1980 PROJECTILE 105MM WP-T M416 FILLING ASSEMBLY《M416式105 mm白磷曳光弹(WP-T)用装填组件》.pdf
《ARMY MIL-P-60090 B-1980 PROJECTILE 105MM WP-T M416 FILLING ASSEMBLY《M416式105 mm白磷曳光弹(WP-T)用装填组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60090 B-1980 PROJECTILE 105MM WP-T M416 FILLING ASSEMBLY《M416式105 mm白磷曳光弹(WP-T)用装填组件》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-60090B(EA) 3 December 1980 SUPERSEDING MIL-P-60090A(MU) 5 July 1968 MILITARY SPECIFICATION PROJECTILE, 10 5MM , WP-T , M416 ; FILLING ASSP1BLY This specification is,approved for use by US Army Armament Research and Development Command , Department of the Army and is available for use by all De
2、part- ments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers the white phosphorus (HP) filling as- sembly of the M416 projectile, without fuzing components. 2. APPLICABLE DOCUMENTS ( 2.1 Issues of documents. The follawing docwients of the issue in ef- fect on date of
3、 invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-C-215 - Chemical Agent, White Phosphorus (WP). MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specifications For, - I FSC 1315 : Benef
4、icial comments (recommendat ions, addit ions, delet ions 1 and any . : pertinent data which may be of use in improving-this document should be : : addressed to: : Command, ATTN: DRDAR-TSC-S, Aberdeen Proving Ground, MD 21010 by us- : : ing the self -addressed Standardization Document Improvement Pro
5、posal : : (DD Form 1426) appearing at the end of this document OP by letter. Commander, US Army Armament Research and Development */ . r / THIS DOCUMENT CONTAINS 13 PAGES. 6 - c Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-bO070B I3 7799906
6、0335445 B MIL-P-60090B( EA) STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by MIL-STD-129 - Marking for Shipment and Storage. MIL-STD-453 - Radiographic Inspect ion. Attributes. DRAWINGS US ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND CHEMICAL SYSTEMS LABORATORY 888
7、6485 - hjectile, 105MM, WP-T, M416; Filling Assembly. (Copies of specifications, st.andards, drawings, and publications re- quired by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 3. REQUIREMEN
8、TS 3.1 Materials. Materials shall be in accordance with the applicable 3.2 Components and assemblies. The components and assemblies shall comply with all requirements specified on Dwg 8886485 and associated drawings, and with all requirements specified in the applicable.speci- fications and standard
9、s. drawings and specifications, 3.3 Radiographic quality Radiographs for determination of the fill- ing height shall be taken in accordance with MIL-STD-453 and shall be of a quality which will permitproper evaluation of the filling assembly. The minimum optical density of each radiograph in the are
10、a being inspec- ted shall not be less than 1.25 and shall be within a density range that will permit proper identification of filling height rejects. 3.4 Filling of projectile. 3.4.1 Projectile and case impeller. The projectile cavity and case impeller shall be clean and free of volatile corrosion i
11、nhibitor paper, dirt, burs, rough edges, and foreign matter. I 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-60090B(EA) . 3.4.2 Filling. The projectile shall be filled with molten WP con- forming to MIL-C-215 at a temDerature cr 140 t lCF (
12、60 t 5.5OC). When water is in contact with the WP during th: filling operation, the water shall be buffered by a suitable alkaline salt to maintain a PH value between 6.5 and 8,0, After the test for leakage, the WP shall be solidified while maintaining the projectile in a vertical nose-up posi- tion
13、, 3.4.3 Filling height of WP. When radiographed in a vertical, nose-up position, the depth of the water remaining in the filled and closed pro- jectile shall not exceed one-quarter inch (0.250 inch); and, there shall be a 3 to 5 percent void, by total volume, existing above the surface of the water
14、over the WP in the projectile (see 6.3). 3.4.4 Cleaning after projectile closing, The exterior face of the filling assembly and the interior surfacof the case impeller cavity shall be cleaned thoroughly to remove all WP contamination (see 6.4). 3.5 Leakage. When tested as specified in 4.5.2, the fil
15、ling assembly shall not leak when maintained at a temperature of 160 t 5OF (71O t 3.oC) for a period of 8.0 hours, minimum; or, when maintained at a temperature of 207O to 212OF (97OC to iOOC) for a period of 15 minutes, minimum. 3.6 Data requirements. The contractor shall generate data in accord- a
16、nce with the requirements of the data item descriptions cited in 4.4.2.1. 3.7 First article inspection. This specification contains technical provisions for first article inspection. of first article samples by the contractor shall be as specified in the contract. Requirements for the submission 3.8
17、 Workmanship. 3.8.1 Projectile filling assembly. The projectile filling assembly shall be free from internal and external contamination (oil, grease, etc.), chips, dents, burrs, and foreign matter that may impah further assembly and proper functioning. The cleaning method used shall not be injurious
18、 to any of the filling assemblies; nor shall the assemblies be contaminated by the cleaning agent. 3.8.2 Painting and marking. The painting and marking shall be re- stored by the filling-contx-actop on any components furnished to him painted and marked, when such paintings and markings have been mar
19、red OP obliterated, 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-M IL-P-6 O 090B( EA ) 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance pro- visions. Unless otherwise specified herein or in the con
20、tract, the pro- visions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. I 4.2 Class if icat ion of inspect ions. The following types of inspect ion shall be perfonned on this item: a. First Article Inspection b. Quality Conformance Inspection 4.3 First article ins
21、pection. 4.3.1 Submission. The contractor shall suhit a first article sample The first article sample shall consist of as designated by the Contracting Officer for evaluation in accordance with the provisions of 4.3.2. the following items in sample quantities as indicated. PART DESCRIPTION DRAWING Q
22、UANTITY 25 Projectile Filling Assembly 8 88648 5 4.3.2 Inspections to be performed. See MIL-A-48078 and table I speci- fied herein, see 4.3.2.1. 4 I 0 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-1 MIL-P-bOOOB 13 M 9999906 0335948 3 i? ri (r O ri
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP60090B1980PROJECTILE105MMWPTM416FILLINGASSEMBLYM416 105 MM 白磷 曳光弹 WPT 装填 组件 PDF

链接地址:http://www.mydoc123.com/p-446612.html