ARMY MIL-P-60052-1964 PRIMER PERCUSSION M1A2 METAL PARTS FOR《M1A2撞击引物用金属部件》.pdf
《ARMY MIL-P-60052-1964 PRIMER PERCUSSION M1A2 METAL PARTS FOR《M1A2撞击引物用金属部件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60052-1964 PRIMER PERCUSSION M1A2 METAL PARTS FOR《M1A2撞击引物用金属部件》.pdf(13页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-60052 13 I 7977706 0335332 b m MILITARY SPECIFICATION PRIMER, PERCUSSION, M1A2 , METAL PARTS FOR 1, SCOPE MIL-P-60052 (NIU) 28 August 1964 1.1 This specification covers the metals parts for one type of. percussion primer designated as Primer, Percussion, MlA2. 2. APPLICABLE DOCUMENTS I 2.1 The
2、 following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-255 O MIL-P-10025 MIL-1-45208 MIL-1-45607 STANDARDS MILITARY MIL-STD- 105 MIL-STD-109 MIL- STD- 3235 Amm
3、unition and Special Weapons, General Specification for Packing and Marking for Domestic Ship- ment of Inert Ammunition Components; General Specification for Inspection Requirements, General Specification for Inspection Equipment, Supply and Maintenance of Sampling Procedures and Tables for Inspectio
4、n by Attributes (ABC-STD-105) Quality Assurance Terins and Definitions Single and Multilevel Continuous Samp- ling Procedures and Tables for Inspection by Attributes Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MILP-60052 (W)- DRAWINGS ORDNANCE CO
5、RPS 8838079 8838089 8838012 8838015 I - Head - Cup, Battery - Plug, Firing - Body PUBLICATIONS ORDNANCE CORPS IE G 7298952 - Index of Inspection Equipment Lists (Copies of specifications, standards, drawings and publications required by contractors in connection with specific procurement functions s
6、hould be obtained from the procuring activity or as directed by the contracting officer). 3. REQUIREMENTS 3.1 Material. -Materials shall be in accordance with applicable drawings and specifications. I 3.2 Metal parts. -The metal parts shall comply with all requirements specified on Drawings (dwgs) 8
7、838079, 8838089, 8838012 and 8838015 as applicable, and with all requirements specified in applicable specifications. - 3.3 Hydrostatic test. -The primer tubing shall withstand the application of a minimum (min. ) hydrostatic pressure without rupture or indication of flaws as, evidenced by leaks, an
8、d without permanent deformation beyond drawing requirements, when tested as specified in 4.4.1 (see 6.4). 3.4 Workmanship. -All parts shall be dry and free of chips, cracks, dust, grease, rust, burrs and other foreign material. The cleaning method shall not be injurious to any of the parts nor shall
9、 the parts be contaminated by the cleaning agents. 4. QUALITY ASSURANCE PROVISIONS .4.1 General quality assurance provisions. -The suppliers responsibi- lities will be as specified in the contract or purchase order. Reference shall 2 Provided by IHSNot for ResaleNo reproduction or networking permitt
10、ed without license from IHS-,-,-MIL-P-60052 (Mu) be made to Standard MIL-STD-109 in order to define terms used herein. The provisions of Specification MIL-A-2550 shall apply. 4.1.1 Contractor quality assurance system. -The contractor shall provide and maintain an effective quality assurance system i
11、n compliance with the requirements of Specification MIL-1-452 08. The contractors quality assurance system shall contain a procedure for the reporting of critical defectives found during the course of his inspection and during inspection by the Government. Any critical defect encountered, unless ann
12、otated by an asterisk (*) to the right of the characteristic code number (see 6.2), will be reported within 48 hours. A monthly summary report covering those critical defects annotated by an asterisk will be furnished. The agencies to whom the reports will be furnished are identified in paragraph 6.
13、6. The reports shall contain, as a minimum, the following information a. Contractor and contract number. b. Number and revision date of specification. C. Characteristic code number. d. Lot or serial number. e. Number of defectives found. f . Assignable cause or analysis of occurrence. g. Corrective
14、action taken or recommended. When the corrective action is beyond the control of the contractor or the scope of the contract, the report shall contain the contractors recommendation to the Government. 4.1.2 Submission of product. -At the time the completed lot of product is submitted to the Governme
15、nt for acceptance the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: a. A statement that the lot complies with all quality assurance b. Number of units of product ins
16、pected. c. Results obtained for all inspection performed. d. Drawing, specification number and date, together with an e. Certificates of compliance on all material purchased by the provisions of the approved current written description of the system. identification and date of changes. Provided by I
17、HSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-b0052 13 I 9999906 0335335 I - - - -_ - -. -._ I MIL-P-60052 (MU) contractor when such material is controlled by Government specifications referenced in any of the contractual documents. f . Number of items i
18、n the lot. g. Date submitted. The certificate shall be signed by a responsible agent of the certifying organi- zation. The initial certificate submitted shall be substantited by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with s
19、ubsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certify- ing organization. I 4.1.3 Government verification. -Using the contractors written quality assurance procedure, this detail specification, the applicable drawings and I other co
20、ntractual documents as a guide, the Government inspector shall verify at unscheduled intervals all quality assurance operations performed by the contractor. Verification will be in accordance with Specification MIL-1-45208 and will be performed to the extent necessary to assure compliance with the c
21、ontractual requirements. Severity of Government inspection of individual characteristics will be directly related to the seriousness of the classification assigned, In no instance will a characteristic classified “critical“ be accepted solely on the basis of the contractors records. 4.2 initial prod
22、uction inspection 4.2.1 Submission. -Prior to the start of regular production, the con- tractor shall submit an initial production sample to a Government approved facility as designated by the Contracting Officer (see 6.5) for evaiuation in accordance with the provisions of 4.2.2. The initial produc
23、tion sample shall consist of twenty-five assemblies and 25 each of every individual component and every sub-assembly which has been produced by the contractor or furnished by a supplier and which has been manufactured using the same production processes, procedures and equipment which will be used i
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP600521964PRIMERPERCUSSIONM1A2METALPARTSFORM1A2 撞击 引物 金属 部件 PDF

链接地址:http://www.mydoc123.com/p-446606.html