ARMY MIL-P-60026-1964 PRIMER STAB M97 LOADING ASSEMBLING AND PACKING《M97针刺引物的填装 组装和包装》.pdf
《ARMY MIL-P-60026-1964 PRIMER STAB M97 LOADING ASSEMBLING AND PACKING《M97针刺引物的填装 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-60026-1964 PRIMER STAB M97 LOADING ASSEMBLING AND PACKING《M97针刺引物的填装 组装和包装》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、3- - MILP-60026 (MU) I 10 APRIL 1964 MILITARY SPECIFICATION , PRIMER, STAB, M97 LOADING, ASSEMBLING ANI9 PACKING 1. SCOPE 1.1 This specification contains require- ments not normally required by the draw- ings and provides quality assurance provi- sions for the loading, assembling and pack- ing for o
2、ne type of initiating device desig- nated as Primer, Stab, M97. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitations for bids, form a part of this specification to the ex- tent specified herein. and Tables for In- spection by Attri- butes MIL-STD-109 - Qu
3、ality As su r a n c e Terms and Defini- tions MILSTD- 1235 - Single and Multilevel Continuous Samp- 1 i n g Procedures and Tables for In- spection by Attri- butes SPECIFICATIONS DRAWINGS MILITARY ORDNANCE CORPS MIL-A-2560 - Ammunition a n d 7649153 - Box, Packing, Ammunition Special Weapons ; t for
4、Primer, Stab M26, General Specifica- M55 or T92 Assembly, tion for Details and Packing 7549154 - Box, Set-up, Packing, Am- munition, Inner and Outer for Primers, Stab, M26, M55 or T92 As- MIL146208 - Inspection Require- ments; General Specification for MIL-1-46607 - Inspection E q u i p - ment; Supp
5、ly and sembly, Details, Packing and Marking MaintenaGe of 8857266 - Primer, Stab, M97 PUBLICATIONS STANDARDS MILITARY ORDNANCE CORPS MIL-STD- IEL 8857266 - Index of Inspection 106D - Sampling Procedures Equipment Lists 1 -FSC 1376 I Provided by IHSNot for ResaleNo reproduction or networking permitte
6、d without license from IHS-,-,-MIL-P-60026 (MU) . (Copies of specifications, standards, drawings an4 publications required by contractors in connection with specific procurement functions should be ob- tained from procuring activity 01 as directed by the I; contpacting officer.) 3. REQUIREMENTS 3.1
7、Material. Materials shall be in ac- cordance with applicable drawings and specifications. 3.2 Primer, The primer shall comply with all requirements specified on Drawing (dwg.) 8857266 and with all requirements specified in applicable specifications. 3.3 Moisture content of lead azide. The moisture c
8、ontent of the lead azide used in loading the primer, at the time of loading shall not exceed 0.60 percent. 3.4 Moisture content of primer mixture. The moisture content of the primer mixture used in loading the primer, at the time of loading shall not exceed 0.60 percent. 3.5 Waterproofness. The prim
9、er shall be waterproof as evidenced by normal func- tioning, as specified in 3.6, after being immersed in water maintained at 70“ Fahr- enheit (F.) plus or minus 10“ F., at a depth of 2 inches minimum for not less than 48 hours. The test shall be performed as specified in 4,3,3. 3.6 Sensitivity and.
10、 output. The primer shall function on the first attempt when tested as specified in 4.3.3.1 and shall cause perforation of the coined lead disc to a diameter of not less than 0,250 inch, mini- mum, 3.7 Workmanship, All parts shall be free of cracks, chips, dirt, grease, rust and other foreign materi
11、al. The cleaning method shall not; be injurious to any of the parts nor shall the parks be contaminated by the cleaning agenta. ? ;- , - .- f - 4, QUALITY. ASSURANCE PRovsIoJss 4.1 Gekial quality assurance provisions. The supplier is responsible for the perform- ance of all inspection requirements s
12、pecified herein. Except as otherwise specified, the supplier may utilize his own or any other inspection facilities and services acceptable to the Government. Inspection records of the examinations and tests shall be kept complete and available to the Government as specified in the contract or order
13、. The Government reserves the right to perform any of the inspections set forth in the speci- fication where such inspections are deemed necessary to assure that supplies and serv- ices conform to prescribed requirements, Reference shall be made to Standard MIL- STD-109 in order to define terms used
14、 herein. The provisions of Specification MIL-A-2550 shall apply. 4.1.1 Contractor quality wsurance sys- tem. The contractor shall provide and maintain an effective quality assurance sys- tem in compliance with the requirements of Specification MIL-1-45208. The contrac- tors quality assurance system
15、shall contain a procedure for the reporting of critical defectives found during the course of his inspection and during inspection by the Government. Any critical defect encoun- tered, unless annotated by an asterisk (*) to the right of the characteristic code num- ber (see 6.2), will be reported wi
16、thin 48 hours. A monthly summary report cover- ing those critical defects annotated by an asterisk will be furnished. The agencies to whom the reports will be furnished are identified in paragraph 6.6. The reports shall contain, as a minimum, the following information : (a) Contractor and contract n
17、umber. (b) Number and revision date of spec- (c) Characteristic code number. ification. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-% MIL-P-bO02b 13 777970b Oq23878 8 fd) Lot or serial number. (e) Number of defectives found. (f) Assignable caus
18、e or analysis of occurence. (g) Corrective action taken or recom- mended. When the corrective action is beyond the control of the contractor or the scope of tha contract, the report shall contain the con- tractors recommendation to the Govern- ment. 4.1.2 Szibmisson of prodmt. At the time the comple
19、ted lot of product is submitted to the Government for acceptance the con- tractor shall supply the following informa- tion accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted : (a) A statement that the lot complies with al
20、l quality assurance pro- visions of the approved current written description of the sys- tem. (b) Number of units of product in- spected. (c) Results obtained for all inspection performed. (d) Drawing, specification number and date, together with an identi- fication and date of changes. (e) Certific
21、ates of analyses on all ma- terial procured directly by the contractor when such material is controlled by Government speci- fication referenced in any of the contractual documents. (f) Number of items in the lot. (g) Date submitted. MIL-P-60026 (MU) The certificate shall be signed by a respon- sibl
22、e agent of the certifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his principal. Substan- tiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this autho
23、rity is vested in another agent of the certifying organization, 4.1.3 Gove.mtme.nt verification. Using the contractors written quality assurance pro- cedure, this detail specification, the appli- cable draiuings and other contractual doCu- ments as a guide, the Government inspector shall verify at u
24、nscheduled intervals all quality assurance operations performed by the contractor. Verification will be in ac- cordance with Specification MIL-1-45208 and will be performed to the extent neces- sary to assure compliance with the con- tractual requirements. Severity of Govern- ment inspection of indi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP600261964PRIMERSTABM97LOADINGASSEMBLINGANDPACKINGM97 针刺 引物 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446597.html