ARMY MIL-P-50536-1970 PROJECTILE 155MM HE M449A1 BASE PLUG FOR《M449A1型155 mm高爆榴弹用弹底塞》.pdf
《ARMY MIL-P-50536-1970 PROJECTILE 155MM HE M449A1 BASE PLUG FOR《M449A1型155 mm高爆榴弹用弹底塞》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-50536-1970 PROJECTILE 155MM HE M449A1 BASE PLUG FOR《M449A1型155 mm高爆榴弹用弹底塞》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50536 (MU) MIL-1-45607 - STANDARDS MILITARY MIL-STD-105 - MIL-STD-109 - MIL-STD-1168 - MIL-STD-1169 - MIL-STD-1235 - DRAWINGS 2 Provided by IHSNot for ResaleNo reproduction or networking permitted
2、 without license from IHS-,-,-MIL-P-50536 13 I 9999906 0328071 2 MIL-P-50536 (MIT) (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the Contracting
3、Officer). of this specification tc the extent specified herein. Unless otherw.ise indicated, the issue in effect on the date of invitation for bids or request for proposal shall apply. 2.2. Other publications.-The following documents form a part AMERICAN SOCIETY FOR TESTING AND MATERIALS ASTM E 8-68
4、 - Tension testing of Metallic Mater ia1 s (Application for copies should be addressed to: for Testing and Materials, 1916 Race Street, Philadelphis, Pa. 19103) American Society 3. REQUIREMENTS 3.1 Material.-Materials shall be in accordance with the 3.2 Base plugs.-Base plugs shall comply with all r
5、equirements applicable drawings and specifications. specified on Drawing (DwgJC-8875854, spec if ied in applicable spec if ications . and with all requirements 3.3 Heat treatment.-All heat treatment (including stress relief) procedures shall be controlled so as to produce in each lot of bBB plugs th
6、e mechanical properties specified on the applicable component drawing and in applicable specifications. 3.4 Metal defects.-All hse plugs shall be free from voids, cracks, seams, splits, laps, cold shuts, pipe, porosity, inclu- sions and other similar defects. 3.5 Workmanship.-All hse plugs shall be
7、fabricated a.ri.d finished in a thorough, workmanlike manner. They shall be free of burrs, chips, sharp edges, unblended radii, surface defects, dirt, grease, rust, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any parts, nor shall the parts be conta
8、minated by the cleaning agents. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-5053b 13 777770b 0328072 I.I 0 MIL-P-50536 (MU) and tests.-The contractor shall forward copies of th e results of any of his examinations or tests to the designat
9、ed address as required by the contract. for first article testing. Submission of first article quantity . by the contractor shall be as specified in the contract. 3.6 Submission of results of contractor-conducted examinations (see 6.4). 3.7 First article testing.-This specification makes provisions
10、4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein, Except as otherwise specified in the contract or order, the supplier ma
11、y use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to
12、assure supplies and services conform to prescribed requirements. Reference shall be made to MIL-STD-109 to define terms used herein. The provisions of MIL-A-2550 shall apply. Submission of product.-At the time the completed lot of items deliverable under the contract is submitted to the Government f
13、or acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: 4.1.1 a. assurance provisions specified in this specification. b. Drawing and specification number a
14、nd date, together with identification and date of changes thereto. . c. A statement that all material purchased by,the contractor meets requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of c
15、onformance are on file and available for review. A statement that the lot complies with all the quality d. Number of items in the lot. e. Date submitted. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-5 Provided by IHSNot for ResaleNo reproduction
16、 or networking permitted without license from IHS-,-,-ML-P-Z 13. m 7779706 O328074 U 4.2.3 Rejection.-If any base plug fails to comply with any of the applicable requirementg,the first article quantity shall be rejected, its inspection upon any failure of any base plug in the sample to comply with a
17、ny of the stated requirements, In the event of rejection, the Government reserves the right to require the contractor to take corrective action and submit a new first article quantity or portion thereof, contractor is in no way authorized by the Government to resume regular production unless otherwi
18、se directed by the Contracting Officer. The Government reserves the right to terminate Until a first article quantity is accepted, the 4.3 inspection provisions. 4.3.1 Lot formation.-The term “inspection lot“ as used in this specification is defined as an essentially homogeneous collection of units
19、of product from which a representative sample is drawn and inspected to determine conformance with applicable requirements. only that quantity of units from which the sample was ,drawn and shall not be construed to represent any prior or subsequent quantities presented sfor inspection. Homogeneity s
20、hall be con- sidered to exist provided the inspection lot has been produced by one manufacturer, in one unchanged process, in accordance with the same drawing, same drawing revision, same specification and same specification revision and complies with the provisions for submission of product as spec
21、ified in MIL-STD-105. to process, specification, or drawing not affecting safety, performance, interchangeability, or storage, as determined by the Government, shall not be deemed to alter the homogeneity of an inspection lot. accordance with this specification shall comply with the homo- geneity cr
22、iteria specified herein regardless of the type of. sampling procedure which is being applied to determine confor- mance with requirements. Lot numbering, as required, shall be in accordance with MIL-STD-1168. The sample selected shall represent Changes All material submitted for inspection in 4.3.2
23、Examination.-The examinations listed in the following subparagraphs shall be performed on inspection lots (See 4.3.1) of the components or assemblies designated in the applicable para- graph headings. when so specified) shall be 100 percent. Sampling plans for major and minor defects shall be in acc
24、ordance with MIL-STD-105 except that continuous sampling plans in accordance with MIL-STD-1235 may be used if approved by the Government. Instead of applying the AQLs designated herein to the groups of major and minor defects listed, the contractor may elect to apply AQLs to individual de- fects usi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP505361970PROJECTILE155MMHEM449A1BASEPLUGFORM449A1 155 MM 榴弹 用弹底塞 PDF

链接地址:http://www.mydoc123.com/p-446487.html