ARMY MIL-P-50398 (5)-1986 PROJECTILE 165MM TP M624 METAL PARTS《M624式165 mm训练弹(TP)金属件》.pdf
《ARMY MIL-P-50398 (5)-1986 PROJECTILE 165MM TP M624 METAL PARTS《M624式165 mm训练弹(TP)金属件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-50398 (5)-1986 PROJECTILE 165MM TP M624 METAL PARTS《M624式165 mm训练弹(TP)金属件》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、P F MIL-P-50398 (5) 13 777970b 042b741 4 W VIL-P-59398 (AR) AMENDMENT 5 17 November 1986 SUPERSEDING AMENDMENT 4 10 January 1986 MILITARY SPECIFICATION PROJECTILE, 165ElM, TP M624, METAL PARTS This amendment forms a part of Military Specification MIL-P-50398 (AR) dated 18 May 1979, and is acproved f
2、or use within the U.S. Army Armament Munitions and Chemical Command and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 2.1: Delete “MIL-1-6868 Inspection Process, Magnetic Particle.“ PAGE 3 Add: “3.1.1 Rotating band application. The rotating band shall be o
3、verlay welded using the qas metal arc welding process in accordance with the applicable drawings and specifications. Gas metal arc welding process in this case means the use of a consumable electrode with a non-electrode auxiliary wire. The width of the band shall be obtained by oscillating the weld
4、ing head and the auxiliary feed system. The process for applying the rotating band, once established must be maintained, controlled, and monitored by the contractor. Procedures for maintaininq, controlling and monitoring the process must be submitted to the technical agencv for approval prior to sta
5、rt of production. Documented records of the process control must be made available to the Government upon request. band seat should be free from any contaminants that would be detrimental to the adhesion of the band to the band seat.“ 3.1.2 Foreign matter on band seat. Prior to banding, the 1 of 6 A
6、MSC N/A DISTRIBUTION STATEMENT A. Approved for pub ic relea FSC1320 distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50378 (5) 13 777770b 04267q2 b U MIL-P-50398 (AR) AMENDMENT 5 3.5.1: Dalete and substitute the follow
7、ing: “3.5.1 Raw material. - The billets, bars, tube or plate material from which projectile components are formed shall be free from cracks, splits, cold shuts, inclusions, pipe, porosity, folds, bursts, seams, laminations and other metal efects“ . PAGE 4 3.6 d: Delete in its entirety. 3.8.2: Add to
8、 end of sentence: “(see 6.7)“. PAGE 6 Table I, Add: Examination or Test column “Projectile Body (prior to painting) Band Chemical Analysis“ Number of samples - Ilf1 Requirement paragraph - “3.1.1“ Paragraph Reference/Inspect ion Method - “4.5.6.1“ PAGE 8 4.4.2.1.3, delete and substitute the followin
9、g: “4.4.2.1.3 Inspection of raw material prior -. to -u- forming. Each slug, tube or disc obtained from bar, tube or plate stock shall be visually examined for surface indications of the types of metal defects described in 3.5.1 which are visible to the unaided eye on all exterior surfaces. Visual s
10、tandards may be selected to aid in the determination of the slugs, tubes, or discs acceptability“. - -.-.- -.- PAGE 9 4.4.2.2, Najor 101, Delete: “Runout“ and substitute: “True position a .II. PAGE 10 8 4.4.2.2: Delete Minor 206 in its entirety. 2 Provided by IHSNot for ResaleNo reproduction or netw
11、orking permitted without license from IHS-,-,-MIL-P-50398 (5) 13 m 9979906 0426793 m 1 MIL-P-50398 (AR) AMENDMENT 5 PAGE 11 4.4.2.3: Add the following to the note block: “A. See 4.4.3.1 for sample size.“ PAGE 3-4 4.4.2.5 after line 124, add: Major: “125; Band Chemical Analysis“ Under No. of Sample U
12、nits add “A“ Under requirement paragraph, add “3.1.1“ Under Notes, add “A“. One body after banding from each four hours production. (See 4.4.3.5) . I PAGE 17 4.4.2.7, Title: Delete “Carton, Packing, Prior to Sealing“ and substitute “Carton, Packed, Prior to Sealing (Base Plug) I. PAGE 18 4.4.2.8, Ti
13、tle: Delete “Cartons, Packed, After Sealinq“ and substitute “Carton, Packed, After Sealing (Base Plug) l. PAGE 19 4.4.2.9, Title: Delete I1Pallet1 and substitute “Pallet (Projectile Body) I. PAGE 20 4.4.3.1: Delete and substitute the following: “4.4.3,l Tensile strength of projectile body. Two proje
14、ctile bodies from the first batch of a stress-relieved -lot shall be subjected to this test. Following satisfactory . compliance of the initial sample with the requirements of dwg. 10551955, two projectile bodies from every five stress relieved batches, or fraction thereof, of a stress-relieved lot
15、shall be subjected to this test. Failure of any projectile body tensile snecimen to meet the applicable requirements shall reject the lot of stress-relieved bodies which the specimen represents and shall require the establishme-nt of a new stress-relieved lot .II 3 Provided by IHSNot for ResaleNo re
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP5039851986PROJECTILE165MMTPM624METALPARTSM624 165 MM 训练 TP 金属件 PDF

链接地址:http://www.mydoc123.com/p-446471.html