ARMY MIL-P-50363-1969 PLOTTING BOARD FLASH RANGING FIRE CONTROL M18《射击控制光测标图板 M18》.pdf
《ARMY MIL-P-50363-1969 PLOTTING BOARD FLASH RANGING FIRE CONTROL M18《射击控制光测标图板 M18》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-50363-1969 PLOTTING BOARD FLASH RANGING FIRE CONTROL M18《射击控制光测标图板 M18》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、4, 1 L c MIL-P-503b3 12 7777906 0326707 O -, i c MIL- P- 503Mu) 9 October 1969 MILITARY SPECIFICATION PLOTTING BOARD, FLASH RANGING, FIE CONTROL: M18 - _. -1. SCOPE 1.1 This specification covers Flash Ranging Plotting Board M18 which is used to plot the location of enemy batteries (see 6.1). 2. APPL
2、ICABLE DCUMENTS *. 2.1 The following documents, of the issue in effect on date of invitation for bids or request for proposal, form a part of this specifica- tion to the extent specified herein. SPECIFICATIONS Mil it ary MIL-F-13926 Fire Control Materiel; General Specifica- tion Governing the Manufa
3、cture and Inspec- tion of Parts, Equipment and Tools for Army Materiel, Packaging and Packing of Inspection Equipment, Supply and Maintenance of MIL-P-14232 MIL- 1-45607 STANDARDS Military MIL-STD- 105 Sampling Procedures and Tables for MIL- STD-109 Inspection by Attributes Quality Assurance Terms a
4、nd Definitions DRAWINGS U.S. Army, Frankford Arsenal F8567955 Plotting Board, Flash Ranging, Fire Control: M18 FSC 1220 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- - _ - .- - -_I_-_ .- -I-_ - i“- MIL-P-50363 LE 9999906 0326708 2 MIL-P- 50363 (NU
5、) PACKAGING DATA SKEET 11728 160 Packaging of Plotting Board; Flash Ranging, Fire Control: M18 W/Equipment. (Copies of specifications, standards, drawings, and packaging data sheets required by suppliers in connection with specific procurement functions should be obtained from the procuring activity
6、 or as directed by the contracting officer.) 3. REQUIREMENTS 3.1 Materials.- Materials shall be in accordance with drawings, . material specifications, and general specifications forming a part of this specification. 3.2 Fabrication.- The plotting board shall be manufactured in accordance with Drawi
7、ng F8567955 and the respective drawings pertaining thereto. 3.3 General specification.- The contractor shall be responsible to, and compliance with, the following requirements of for adherence MIL-F-13926. Order of precedence Dimensions and tolerances Inorganic protective surface finishes Part ident
8、ification and marking Workmans hip 3.4 Environmental. 3.4.1 Storage temperatures.- The plotting boards shall show no evidence of physical failure and shall meet all performance requirements of this specification at a standard ambient temperature of between 60“ and 90F. after having been exposed to a
9、nd thermally stabilized at ambient temperatures of -80“ and +160F. 3.4.2 Operating temperatures.- The plotting boards shall meet the applicable requirements of 3.8 while exposed to and thermally stabilized at- ambient temperatures of -40“ and S150F. 3.5 Plotting scale flatness.- With the plotting bo
10、ard arranged for two (2) man operation, the plotting scale of the drafting machine shall lie flat on any part of the disk from the “7“ graduation to the “15“ graduation within .Ci15 inch when the “Il“ graduation is at the center of the board. The ends of the scale shall lie flat within 0.025 inch. 2
11、 -y. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50363 Ir2 9799706 0326707 . - MIL-P-50363 (MU) 3.6 Parallelism.- When alined with the fiducial edge of the plotting scale, the Grid lines of the plotting disk shall be parallel to the fiducia
12、l edge of the scale within 0015 inch throughout their entire length with the azimuth scale and vernier reading O f 0.1 mil and 1600 f 0.1 mil. 3.7 A&uracy.- Lines drawn forming a centrally located square with sides measuring 15,000 f 15 meters shall have both diagonals 21,213 f 21 meters. 3.8 Operab
13、ility. 3.8.1 Torque.- The torque required to rotate the slow motion knob shall not exceed 9 pound inches at a standard ambient temperature of between 60“ and 90F. and 12 pound inches at the extreme operating temperatures specified in 3.4.2. 3.8.2 Plotting board table.- With the brake lever pressed a
14、nd held, it shall be possible to rotate the plotting board table through its entire travel without binding, With the brake lever released, the braking mechanism shall hold the table in a clamped position but allow fine adjustment with the slow motion knob. 3.8.3 Braking force.- With the brake lever
15、in its normal position (release) the table shall not move with respect to the vernier scale when a tangential force of 10 pounds is applied at the outer edge of the clamp- ing surface. 3.8.4 Drafting machine.- With the plotting board arranged in both the two man and one man operation mode, there sha
16、ll be no binding in any part of the drafting machine when the plotting scale of the machine is moved back and forth over the entire plotting disk. 3.8.5 Plotting disk surface.- The plotting disk shall have a sur- fade that will allow clear pencil markings and.clean erasures. face shall have no defec
17、ts such as pits, digs, scratches, and stains which may be mistaken for pencil marks. The sur- 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.- Unless otherwise specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requiremen
18、ts as specified herein. specified, the supplier may utilize his own facilities or any other facili- ties suitable for the performance of the inspection requirements specified . herein, unless disapproved by the Government. The Government reserves the . right to perform any of the inspections set for
19、th in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. . Except as otherwise 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- NIL-P-50363 12 997790b 0326730 O - NIL-P-
20、50363 (MU) 4.1.1 General provisions.- The component and Subassembly inspection requirements of MIL-F-13926 form a part of the quality assurance provisions of thisspecification. Definitions of inspection terms shall be as listed in MIL-STD- 109. 4.2 First article (initial production) approval.- The r
21、equirement for first article approval and the responsibility (Government or contractor) for first article testing shall be as specified in the contract. The sample for first article approval tests shall-consist of 3 boards plus 3 each of all items covered by SQAP. The sample shall be manufactured in
22、 the same manner, using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, includ- ing packaging and packing, shall be obtained from the same source of supply as used ,in regular production. 4.2.1 Government testing.- When the Government
23、is responsible for conducting first article approval tests, the contractor, prior to submitting the sample to the Government, shall inspect thesample to insure that it conforms to all the requirements of the contract and submit a record of this inspection with the sample, including certificates of c
24、onformance for materials. 4.2.2 Contractor testing.- When the contractor is responsible or The sample and conducting first article approval tests, the sample shall be inspected by the contractor for all the requirements of the contract. a record of this inspection, including certificates of conforma
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP503631969PLOTTINGBOARDFLASHRANGINGFIRECONTROLM18 射击 控制 标图 M18PDF

链接地址:http://www.mydoc123.com/p-446470.html