ARMY MIL-P-50357-1969 PROJECTILE 60MM H E M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf
《ARMY MIL-P-50357-1969 PROJECTILE 60MM H E M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-50357-1969 PROJECTILE 60MM H E M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-50357 13. W 7777906 032665q 5 - 5- 37- o? MIL-P-50357(m) 30 September 1969 MILITARY SpEcIFICAmoN PROJECTLLE, Gom, H.Es, M49A3 METAL PARTS ASSEMT3LY (AT-LOY STEEL) 1. SCOPE 1.1 This specification covers Projectile, OMM, H.E., M49A3 Metal Parts Assembly (Alloy Steel). 2. APPLICABLE DOCUMEWCS 2.1
2、 The-following documents of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein: SPECIFICATIONS Military MLL-A-25 50 MILI-6868 - Ammunition and Special Weapons, General - Inspection, Processes Magnetic Particle
3、Specification for STANDARDS Federal Federal Test Method Standard No. 141 - Paint, Varnish, Lacquer, and Federal Test Method Standard No. 151 - Metals, Test Methods Related Materials ; Methods of Inspection Sampling and Testing FSC 1310 THIS DOCUMENT CONTAINS 15 .- PAGES. - - Provided by IHSNot for R
4、esaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50357 13 7779706 0326655 7 MIL-p-50357 (MU) 2.1 (Contd) Military MIL-STD-105 MIL-STD-109 KtL-STD-410 MIL-sm- i235 DRAWINGS Munitions CoIrunand Di05 51926 IEL- 10551926 FULICATIONS PA-PD-792 Sampling Procedures and Tables
5、 for Inspection Quality Assurance Terms and Definitions Qualification of Inspection Personnel (Magnetic Ammunition Data Card Packaging, Packing and Marking for Shipment Single and Multileve1,Continuous Sampling by Attributes Particle and Penetrant) of Inert Ammunition Components Procedure and Tables
6、 for Inspection by Attributes Projectile, 60m, H.E., M49A3 Metal Parts Assembly (Alloy Steel) - Inspection Equibent List for Projectile , 60m, M49A3 Metal Parts Assembly (Alqy Steel) - Equipuent, Testing or Measuring for Ammunition Items (Copies of specifications, standards drawings and piblications
7、 required by supplier in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 2.2 Other publications.-The following documents form a part of this specification to the extent specified herein. Unless otherwise indica
8、ted, the issue in effect on date of invitation for bids or request for proposal shall apply. ASA-STD-lOg to define quality assurance terms used. 4 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50357(MJ) 4.1.2 Inspection.-Inspection shall be
9、 in accordance with MIL-A-2550, except as specified herein, 4.1.3 Inspection criteria, a. Successful passage of all inspections required by the drawings and specifications shall be considered as a condition precedent to performing the Proving Ground functional tests (see 3.6). b. Acceptance or rejec
10、tion of a lot by the Government shall be contingent on successful passage of the Proving Ground fhnctional tests. 4.2 First article sample. 4.2.1 Initial production sample.-At the beginning a sample shall be submitted in accordance with contract shall-consist of 60 metal parts assemblies as follows:
11、 of regular production, requirements and 55 projectile assemblies complete, painted 5 projectile assemblies complete, unpainted Fifiy of the above-painted projectile assemblies shall be forwarded to a designated proving ground for ballistic testing. factured using the same materials, equipment, proc
12、esses and procedures as used in regular production. All parts and materials, including packaging and packing, shall be the same as used for the regular production and shall be obtained from the same source of supply. thereof as directed by the procuring agency shall also be submitted whenever there
13、is a lapse in production for a period in excess of 90 days or whenever a change occurs in manufacture processes, material used, drawing, specifications or source of supply, such as to significally affect product uniformity as determined by the responsible technical agency. The sample shall be manu-
14、A first article sample or portion 4.2.1.1 Examination and test.-After inspection and provisional acceptwce at source, the sample shall be inspected for all requirements of the dradngs and specifications at a Government laboratory or such other facility specified in the contract. 4.2.1.2 Initial prod
15、uction sample failure.-Failure of the sample to . comply with requirements of the drawings and specifications shall result 4.3 inspection. 4.3.1.1 Submission of product.-The product shall be submitted in accordance with Mu;-STD-105 or MIL-STD-1235, as applicable. 5 Provided by IHSNot for ResaleNo re
16、production or networking permitted without license from IHS-,-,-MIL-P-50357 13 m 3999706 032bb59 4 - W MIEF- 50357 (MU) 4.3.1.2 Stress relieve lot .-Stress relieved lots shall contain cold worked bodies fran not more than one heat of steel that have been cold worked by the same process utilizing the
17、 Bame tooling mC ecgpuent and stress relieved in the 6ame furnace at the same temperature for the same length of time. cold shaping lot thus constituted shall be the basis for the selection of samples for the tension test hereinafter prescribed. The 4.3.1.3 Miscellaneous lots.-Small lots, such as bo
18、dies from abnormally SmaU heats of steel or bodies which have become separated from previously delivered lots, etc, may at the discretion of the manufacturer, be grouped into miscellaneous stress relieved lots, Such lots shaL1be identified by a xn3,scellaneouB lot code number. 4.3.1.4 Projectile lot
19、,-All stress relieved lots that have been determined to have complied -with the mechanical properties requirements of the applicable component drawing, may be grouped for assembly into projectile lots. A projectile ot shall consist of projectile assemblies produced by one manufacturer mder one contr
20、act, in one unchanged process in accordance with the same drawing, , measurements of the tool may be substituted provided the contractor has established correlation between the tool dimensions and tihe component dimensions prior to the start of production, The contractor shall be responsible for mai
21、ntaining adequate surveillance to assure that drawing requirements are being met throughout the life of the tool. All material produced prior to periodic inspection will be rejected and screened whenever a defective tool control dimension is found. 6 Provided by IHSNot for ResaleNo reproduction or n
22、etworking permitted without license from IHS-,-,-MIL-P-50357 13 777770b 03Zbbb0 O M 4.3.2.2 Metal parts, Drawing Di0551926 (before paint). - Defect Method of Inspection CRImCAL 1. Metal defective visual (Probe light 1 MAJOR 101. 102 . 103 104. 105 106. i08 . 109 110 . u. 112. u4. u5 u6 . u7 . 11.8 J
23、J-9 KCNOR 107 . u3 201, 202. 293 204. 205 o 206. 207 208. 209. Weight Concentricity of large threads with bourrelet, Concentricity of taper at nose with bourrelet Concentricity of taper at rear with bourrelet Concentricity of small threads with bourrelet, Diameter of bourrelet, min. Diameter of body
24、, min. Depth from front face to base of large cavity Depth from rear face to base of small cavity, mx. Depth of bourrelet grooves Length from front face to first outside basic diameter Length fran front face to second outside basic diameter Length from front face to third outside basic diameter Leng
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP503571969PROJECTILE60MMHEM49A3METALPARTSASSEMBLYALLOYSTEELM49A3 60 MM 口径 高爆弹 HE 金属 零部件 合金钢 组装

链接地址:http://www.mydoc123.com/p-446467.html