ARMY MIL-P-50357 (3)-1994 PROJECTILE 60MM H E M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf
《ARMY MIL-P-50357 (3)-1994 PROJECTILE 60MM H E M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-50357 (3)-1994 PROJECTILE 60MM H E M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL)《M49A3式60 mm口径高爆弹(HE)用金属零部件(合金钢)的组装》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-50357 (3) = 9999906 L9BB78b 139 = I INCH-POUND I MIL-P-50357 (AR) AMENDMENT 3 15 August 1994 SUPERSEDING AMENDMENT 2 30 September 1974 MILITARY SPECIFICATION PROJECTILE, 60MM H.E., M49A3 METAL PARTS ASSEMBLY (ALLOY STEEL) This Amendment forms a part of MIL-P-50357 (AR), dated 30 September 1969
2、, and is approved for use by the U.S. Army Armament, Munitions and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 * 2.1, Delete “MIL-A-2550 . . .I in its entirety. Delete “MIL-1-6868 . . .I in its entirety. Add “MIL-A-48078 - Ammunitio
3、n, Standard Quality Assurance Provisions, General Specifications For“ Under heading “DRAWINGS“ delete “Munitions Command“ and substitute “U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) Beneath the heading described above add: “7548319 - Box, Fiberboard Ammunition for Interpl
4、ant Shipment of Projectiles, Empty“ Delete “MIL-STD-109.“ in its entirety. Delete “MIL-STD-1235.“ in its entirety. After “MIL-STD-1169 . . .I add, “MIL-STD-1949 - Inspection, Magnetic Particle“ Delete “Publications PA-PD-792 Equipment, Testing or Measuring for Ammunition Items“ 1 of 7 AMSC N/A FSC 1
5、310 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50357 (3) m 999990b L988787 O75 m MIL-P-50357 (AR) AMENDMENT 3 * 2.2, Delete “ASA-B.46.1“ and substitute “ANSI
6、B46.1“. Delete “(Application for copies.)“ in its entirety and substitute, “(Application for copies should be addressed to: American National Standards Institute (ANSI), 1430 Broadway, New York, N.Y. 10018.)11 PAGE 3 ik Add new paragraph 3.3.2 as follows: “3.3.2 Hvdrostatic test. Each.projectile bod
7、y shall be able to withstand a hydrostatic test load of 7500 +500 psi without cracking, leakage, rupture or permanent deformation when tested in accordance with 4.3.3.1.4.“ PAGE 4 k 3.7.2, Delete “and shall be in accordance with the provisions of MIL-A-2550. 4.1, Add to the end of the paragraph: “Un
8、less otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification.“ * 4.1.1, Delete in its entirety and substitute: “4.1.1 Responsibility for compliance. All items shall meet all requirements of sections 3 and 5. for
9、th in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of ensuring that all products or supplies submitted to the Government f
10、or acceptance comply with all requirements of the contract. Sampling inspection, as a part of manufacturing operations, is an acceptable practice to ascertain conformance to requirements, however, this does not authorize submission of known defective material, either indicated or actual, nor does it
11、 commit the Government to accept defective material.“ The inspection set 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50357 (AR) AMENDMENT 3 PAGE 5 * 4.1.2, Delete in its entirety. t 4.2, Delete section in its entirety and substitute: “4.2
12、 Classification of inspections. The following types of inspections shall be conducted on this item: a. First Article Inspection b. Quality Conformance Inspection 4.2.1 First article inspection. The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation
13、 in accordance with the provisions of MIL-A-48078, 4.3.2.2, 4.3.2.3, 4.3.3.1.2.1 and 4.3.4 herein. The first article sample shall consist of: Four tensile specimens (total) from two bodies (see 4.3.3.1.2.11, ten unpainted bodies (see 4.3.2.2) and thirty painted body assemblies. Five of the painted a
14、ssemblies shall be subjected to the salt spray test and the remainder shall be inspected in accordance with 4.3.2.3 and forwarded for the proving ground tests. 4.2.2 Rejection. See MIL-A-48078.“ * 4.3, Delete section in its entirety and substitute: “4.3. gualitv conformance inspection. 4.3.1 Lots 4.
15、3.1.1 Inspection lot formation. Inspection lots shall comply with the lot formation provisions of MIL-A-48078 and the following, as applicable: 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-50357 (3) = 9999906 I1988789 948 MIL-P-50357 (AR)
16、 AMENDMENT 3 PAGE 6 * 4.3.2.1, Delete in entirety and substitute: “4.3.2.1 Tool control dimension. Dimension marked tool control shall be gaged during First Article testing and after each 250 items produced on each machine in operation and after any tooling change. Where destruction of components is
17、 necessary to inspect these dimensions, measurements of the tool may be substituted provided the contractor has established correlation between the tool dimensions and the component dimensions prior to the start of production. The contractor shall be responsible for maintaining adequate surveillance
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP5035731994PROJECTILE60MMHEM49A3METALPARTSASSEMBLYALLOYSTEELM49A3 60 MM 口径 高爆弹 HE 金属 零部件 合金钢 组装

链接地址:http://www.mydoc123.com/p-446463.html