ARMY MIL-P-50202 A-1977 PROPELLANT CHARGE ROCKET FOR DEMOLITION KIT CRATERING M180《M180式炸坑爆破包用火箭推进剂药柱》.pdf
《ARMY MIL-P-50202 A-1977 PROPELLANT CHARGE ROCKET FOR DEMOLITION KIT CRATERING M180《M180式炸坑爆破包用火箭推进剂药柱》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-50202 A-1977 PROPELLANT CHARGE ROCKET FOR DEMOLITION KIT CRATERING M180《M180式炸坑爆破包用火箭推进剂药柱》.pdf(15页珍藏版)》请在麦多课文档分享上搜索。
1、. MIL-P-50202A 13 7777706 0325505 5 MIL-P-50202A (AR) 11 April i977 SUPERSEDING MIL-P-50202 (PA) 23 September 1974 . .MILITARY SPECIFICATION-.? .-: - - PROPELLANT CHARGE, ROCKET, FOR DEMOLITION KIT, CRATERING, M180 This specification is approved for use by the U.S. Army Armament Research and Develop
2、ment Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification contains requisements not normally covered by the drawings and provides quality assurance provisions for the fabrication of parts, the manufacture of the propellant an
3、d the assembly of one type of propellant charge for the Rocket Motor for Demolition Kit Cratering, M180. 2. APPLICABLE DOCUMENTS 2.1 issue in effect on date of invitation for bids, or request for proposals, form a part of this specification to the extent speci- f ied herein. Issues of documents.-The
4、 following documents of the SPECIFICATIONS MILITARY MIL-P-14 737 - MIL-A-48078 - STANDARDS MILITARY MIL-STD-129 - MIL-STD-4 53 - Propellant M-7 Ammunition, Standard Quality Assurance Provisions, General Specification For Marking for Shipment and Storage Radiographic Inspection FSC: i340 1 i Benefici
5、al comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Amy Armament Research and Development Command, Attn. DRDAR-QA, Dover, New Jersey 07801 by using the self-addreseed Standardization Document
6、Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. THIS DOCUMENT CONTAINS .UPAGES; Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50202A 13 H 7777706 0325506 7 W MIL-P-5 02 02A (AR) DRAWINGS (see 6.5) US AR
7、MY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND 9244409 - Propellant, Charge, Rocket 2.2 Other publications.-The following documents form a part of this specification to the extent specified herein, Unless otherwise indicated, the issue in effect on date of invitation for bids or request for proposals
8、shall apply. CODE OF FEDERAL REGULATIONS Title 49 - Transporation, parts 100-199. (The Code of Federal Regulations is available from the Superinten- dent of Documents, U,S, Government Printing Office, Washington, D.C. 20402. Orders shall specify 49 CFR 100-199, 3. REQUIRFJVIENTS 3.1 Materials.-Mater
9、ials shall be in accordance with the applicable drawings and specifications. 3.1.1 Pro ellant.-The propellant shall comply with specifi- cation MIL-P-1 -riE- 737, Type II. 3.2 Components and assemblies.-The components and assemblies shall comply with all requirements specified on drawing 9244409 and
10、 associated drawings and with all requirements specified in applicable specifications and standards. evaluation shall be taken in accordance with MIL-STD-453 and shall be of a quality which will permit proper evaluation of the sealing quality as determined by the responsible technical agency of the
11、Government. area being inspected shall not be less than 1.25 and shall be within a density range that will permit proper identification of gap or separation defects. grain shall not separate from the Molded Stud Assembly when sub- 3.3 Radiographic quality,-X-rays for gap or separation Minimum optica
12、l density of each radiograph in the 3.4 Strength of propellant charge, rocket.-The Propellant jected to a minimum axial force of i50 lbs. 3.5 Static functioning test 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. _. _- ._ MIL-P-50202A 13 7777706
13、 0325507 7 M MIL-P-50202A (AR) 3.5.1 Maximum pressure at 130F.-The maximum,pressure developed by the Propellant Charge Assembly at 130F shall not exceed 12,000 pounds per square inch (p.s.i.) when fired in the applicable test equipment. 3.5.2 Action time at minus 40F.-The action time developed by th
14、e Propellant Charge Assembly at minus 40F shall not exceed - O. 052 second. 3.5.3 Total impulse at minus 40F.-The total impulse devel- oped by the Propellant Charge Assembly at minus 40F shall not be less than 900 pound seconds. 3.5.4 Ignition delay time at minus 40F.-The ignition delay time at minu
15、s 40F shall not exceed 0.025 second. 3.6 Propellant cha,rge, rocket.-Any gap or separation at the Molded Stud Assembly and Grain Propellant, Machined interface shall be completely sealed with specific inhibitor so as to pre- vent burning of the stick at this interface. technical provisions for first
16、 article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 3.7 First article inspection.-This specification contains 3.8 Workmanship 3.8.1 Workmanship-Propellant grain.-The propellant grain shall be free of dirt, grease, chi
17、ps, gouges, inhibitor solvent drippings, cracks, fissures, porous material and other defects which would make the item unsuitable for the intended use. 3.8.2 Workmanship-Parts and assemblies.-The parts and assem- blies shall be free from chips, dirt, grease and other foreign matter that may impair p
18、roper functioning. The cleaning method used shall not be injurious to any of the parts, nor shall the parts be contaminated. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality assurance provisions.-Unless otherwise specified herein or in the contract, the provisio
19、ns of MIL-A-48078 shall apply and are here- by made a part of this detail specification. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50202A 13 9979906 0325508 O MIL-P-50202A (AR) 4.2 Classification of inspections.-The following types of i
20、nspection shall be conducted on this item: a. First article inspection b. Quality conformance inspection 4.3 First article inspection 4.3.1 ,Submission.-The contractor shall submit a first article sample as designated by the Contracting Officer fcr eval- uation in accordance with provisions of 4.3.2
21、. The first article sample shall consist of the following items in sample quantities as indicated, Part description Drawings Quantity Propellant Charge, Rocket 924 44 09 15 Stud, Propellant, Rocket 9244420 10 Molded Stud Assembly 9244421 5 Consecutive:. jr produced frcn! E:;: cavity of eEch ?,ld Gra
22、in, Propellant, Machined 9270900 10 1 Propellant Charge Assembly 9244401 (Ref.) *10 are *Note: (See Dwg. 9244401)72 Propellant charges., Dwg. 9244409 required for one (1) Propellant Charge Assembly. 4.3.2 I specified Inspections to be performed.-See MIL-A-48078 anci Table herein. 4.3.3 Rejection,-Se
23、e MIL-A-48078. 4 I i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-w GI u H e p: 4 Cu LL O rl li z v) h rl P VI VI E 4 a, hc Fi (d c u w E: (d rl rl a, a ici pi ;o I UMM . Cu Cu N N M M M M MMM I I I I III n a, ho ci (d c u w c ha wrl drl da, da pi
24、 0 .rl k so c4 (d ho oc da, ah (d.P p:v, Gk hg 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-50202A 13 W 777770b 0325530 7 W rl NNcu m mmm Ln mmLn * *=i-* a . . rl N Ma- m mmm M MMM . . I III m mmm h O * rn I c d E .w cd rn al Ei .A bo Ei s
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP50202A1977PROPELLANTCHARGEROCKETFORDEMOLITIONKITCRATERINGM180M180 式炸坑 爆破 火箭 推进 剂药柱 PDF

链接地址:http://www.mydoc123.com/p-446457.html