ARMY MIL-P-48850-1975 PIN AND LANYARD ASSEMBLY《击针和拉火绳组件》.pdf
《ARMY MIL-P-48850-1975 PIN AND LANYARD ASSEMBLY《击针和拉火绳组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-48850-1975 PIN AND LANYARD ASSEMBLY《击针和拉火绳组件》.pdf(6页珍藏版)》请在麦多课文档分享上搜索。
1、for for Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48850 13 E 777770b 0324b97 E I - MIL-P-48850 (PA) (Copies of specifications, standards, and drawings required by suppliers in connection with specific procurement functions should be obtai
2、ned from the procuring activity or as directed by the Contracting Officer) o 3. REQUIREMENTS 3.1 Material. - Materials shall be in accordance with the applicable drawings and specifications. 3.2 Assembly, - The assembly shall comply with all requirements specified on Drawing (dwg. ) 9287745 and all
3、associated drawings and with all requirements specified in applicable specifications. 3.3 Workmanshi . - All parts and assemblies shall be fabricatedded in a thorough workmanlike manner. They shall be free of burrs, chips, sharp edges, cracks, unblended radii, surface defects, dirt, grease, rust, co
4、r- rosion products, and other foreign matter. The cleaning agent or method used shall not be injurious to any part, nor shall the part be contaminated by the cleaning agents. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for insqction and standard quality assurance provisions. - Unless oL erwse
5、 specirieu herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of inspection, - The following type of inspection shall be conducted on this item: a, First Article Inspection bo Quality Conformance Inspection
6、 I 4,3 First article inspection ! 4.3.1 Submission. - The contractor shall submit a first article sample (Sect 6.2b) as designated by the Contracting Officer. The first article sample shall consist of ten (10) complete sets of parts and ten (10) assemblies. The first article shall be evaluated in ac
7、cordance with the provisions of 4.3.2 and 4,3.3. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-48850 (PA) 40302 Inspections to be performed. - See MIL-A-48078 and paragraph 4.4.,2.-1, testing per paragraph 4.4.3. 4.303 Rejection. - (See MIL
8、-A-48078). 4.4 Quality conformance inspection 4.4,i Inspection lot formation. - Inspection lots shall comply with the lot formation provisions of MIL-A-48078. 4.4.2 Examination. - (See MIL-A-48078) Unless otherwise specified in the classification of defects and test tables, sampling plans for major
9、and minor defects shall be in accord- ance with MIL-STD-105, Inspection Level II, Equipment necessary for the performance of the inspections listed shall be in accord- ance with 4.4.4. .3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-J MIL-P-48850
10、13 79999Ob 0324679 b 4.4.3 Testing MIL-P-48850 (PA:)- 4.4.3011 Lanyard Assembly Pull Test. (See dwg, 9287745) - Major A dePect. - Ten (10) assemblies shall be randomly selected from each lot and tested for the specified requirement-in accordance with 4,5.1. The lot shall be rejected if one (1) or mo
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP488501975PINANDLANYARDASSEMBLY 火绳 组件 PDF

链接地址:http://www.mydoc123.com/p-446445.html