ARMY MIL-P-48762-1975 PROJECTILE 155MM HE ROCKET ASSISTED M549 INERT SIMULATED PARTS AND LOADING《M549式155 mm火箭助推榴弹(惰性)用模拟零部件及其装药》.pdf
《ARMY MIL-P-48762-1975 PROJECTILE 155MM HE ROCKET ASSISTED M549 INERT SIMULATED PARTS AND LOADING《M549式155 mm火箭助推榴弹(惰性)用模拟零部件及其装药》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-48762-1975 PROJECTILE 155MM HE ROCKET ASSISTED M549 INERT SIMULATED PARTS AND LOADING《M549式155 mm火箭助推榴弹(惰性)用模拟零部件及其装药》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-4B762 13 9799906 0324280 2 - _ This specification is approved for use by all Departments and Eigezcies of tne Department of Defense. 1. SCOPE 1.1 This specification covers the fabrication of the inert parts a2d the complete inert round loading and assembly of Projecxile M549. 2. APPLICABLE DOC
2、UMENTS I 2.1 The following documents of the issue in effect on date of invitation for bids, or request. for proposals, form Q part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-1-45607 - Inspection Equipment, supply and MIL-A-48078 -. Ammunition, Standara Qualty A
3、ssurance maintenance of. Provisions, General Specifications for. STANDARD FEDERAL FED-STD-151 - MILITARY MIL-STD-il67 - MIL-STD-1169 - MIL-STD-453 - DRAW I1 J G S ARi4Y Metals, Test rneth.ods, Ammunition, Data Cards Packaging, Packing, and Marking for Shipment of Inert Ammunition Components Inspecti
4、on, Radiographic 8837839 - Pallet- for projcctilc 9236005 - 15514M, Inert, RAP assembly M549 g298010 - Grairi Forward inert 9298011 - Grain, Aft, inert 9298012 - Housing, Delay, Dummy- -. . Li._ ., -1 . . . THIS DOCUMENT CONTAINS .licabcle speclflcationz ad szandards. 3.3 Lozding cf inert filler. 3.
5、3.1 Idatina surfaces. -The mating surfaces cf th:-eads shs17 be free of caked inert filler and all threads shall be free of fc!-e5.gr, material, If a chemical cleaner is required, acetone or rnethy1e:ie chloride shall be used. Care shall be taken to prevent the cI?e!G:a.L cleaner from coming into co
6、ntact with the fillei. and becoming en- trapped in the warhead. 3.4 hssemklv t prae (Motor Body-Warhead).-The motor body shall be assembled to the warhead while the adhesive is still wet to nieet $he tqrque requirement specified on dwg.3236005. The equipment used Cor applying torque to the motor bod
7、y-warhead assembly shall be cal- ibrated at the s%art of each production shift as well as each CiFe there is a change in equipment, settings or process that is likel: to affect uniformity of performance as determine-d by the Governmen%. The equipment shall be provided with a suitable i-ndicator to a
8、id in ob- servance of proper torque application (see 4.4.3. i). 3.4.1 Disassembly toraue (Lifting plug-Warhead)-If a lifting plug is assembled to the projectile in lieu of a fuze the assembly toique shall be sufficient to prevent loosening upon application of 100 iri-lb minimum disassembly torque, a
9、nd assure loosening upon appliczcio: of 200 in-lb maximum disassembly torque. 3.5. Workmanship.-All manufacturing, pi-ocessihg an6 assembling operations including loading of the warhead shazl be correctly per- formed in a thorough, workmanlike manner. Parts shall be free of burrs, chips, cracks, dir
10、t, grease, rust, corrosion products and other foreigfi material. Tne cleaning method shall not be injurious fr! 22: of the pets rlrzr shall the parts be contaminated by the crean- ing agent. Care shall be -exercised at all tines sc that the io;a$;Trrg band of each motor boy will not be damaged by be
11、ing nicked or G;?FiFJ d. 1-1. i. Kcsuonsibility for inspection arid standard ui, the provisions of MIL-A-48078 shall apply ar,d are hereby made a part of this detail specification. - :a-. .i . . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-
12、48762 13 W 7977706 0324282 6 W -71 . .-. -. +./.i - Szb2ssLon o_“ Frodxct.-At the time each ccmle;e2 Lez L? L:c:r itrar. Lp utdey :.!?e coz:_fpact is submittzd te the 3sp;l:L; - 0-.5 -li CL.,-:- r n r.0v-A; -.%ce, the coritracto? sha21 supply the Yollow5g L?-,?ors:cz, 2 r, dulra55 re b; 3 cer:.i?izz
13、:e which attests that the in5ornaticrL rvvd - i ,s csrrect zppliEzble to the product, being stibrnittec!: e. A statement that the lot complies with all of the qualit2 assL1?ince provisions specified in this specificat.ion. b, Di?awir,g and specification number and 62f-e, togetner with identification
14、 and date of chang,es thereto. c. A statement that all material purchased by the contretcr neet.s requirements, when such Kateriz? is contm7.ler3 by Gsve:?zs!-: - o? ments. And that certificates of conformance are or: file ano avai;ai;le fci? review. The certificate shall be signed by a responsible
15、agent of Che certifs- ing organization. stantiated by evidence of the agents authorlty to bind kls principal Substantiation of the agents authority will not- be reqE:red with subseqirent certificates unless, during the course of the contract;, this authority is vested in another agent of the cert5fy
16、ing organ- i zation, conmercial specifications referenced in any of the cortxac:xi: 2:“ - i- d. Number of items ir, the lot. e. Date submitted. The initial certificate submitted shall be sub- 7. q.3 4.3.1 Submission.-The - ccntractor shall submit a first artTcle rirst Article Inspectior, - See MIL-A
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP487621975PROJECTILE155MMHEROCKETASSISTEDM549INERTSIMULATEDPARTSANDLOADINGM549 155 MM 火箭 助推 榴弹

链接地址:http://www.mydoc123.com/p-446442.html