ARMY MIL-P-48760-1975 PRIMER STAB M56 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M56针刺引物用零部件的填装 组装和包装》.pdf
《ARMY MIL-P-48760-1975 PRIMER STAB M56 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M56针刺引物用零部件的填装 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-48760-1975 PRIMER STAB M56 PARTS FOR AND LOADING ASSEMBLING AND PACKING《M56针刺引物用零部件的填装 组装和包装》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、MILITARY SPECIFICATION PRIMER, STAB, M56 PARTS FOR AND LOADING, ASSEMBLING, AND PACKING This specification is approved for useby all Departments and Agencies of the Department of Defense 1. SCOPE - 1.1 This specification covers the parts .and the loading assembling and packing for one type of intiat
2、ing device designated as Primer, Stab, M56. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposal form a part of this speaification to the extent specified herein. SPECIFICATIONS MILITARY MIL-P-116 MIL-A-48078 - Amunition, S
3、tandard Quaity Assurance - Preservation, Packaging, Method of Provisions, General Specification For STANDARDS MILITARY MTL-STD-105 - Sampling Procedures and Tables for MIL-STD-650 - Explosives : Sampling,. Inspection, MIL-STD-1169 - Packaging, Packing and Marking for Inspection by Attributes (ABC-ST
4、D-105) and Testing Shipment of Tnert Ammunition Components THIS DOCUMENT CONTAINS W 2 - - O E E W2 Um ZI Z 2 P I Z W K a W K a n - I- z wn ES KW !i I- K O Z I- 2 a z a I K W - % E O c 4 U - (UN (u“ Ln mm MMM M -. . . O0 O00 O a a, c .rl k a, a a, c O z k O rn .xtd rl a .ri m E B k k O O a 4-i O a, o
5、 c 1-I 3 w a“ P h m k! h u Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-i87b0 13 777790b 0324229 2 M MIL-P-48760 (PA) 4.4.3 Testing. 4.4.3*1 be randomly selected lor the tests specified in 4.4.3 The procedure described in ASTM E300 should be
6、 used to withdraw the samples. scribed analytical procedure for replicate determinations given in standard analytical textbooks. Chemical sampling. - A representative sample shall The tests of 4.5 shall be performed using pre- 4.4 . 3 . 2 Moisture content . 4.4.3.2.1, Primer mixture. - (see 3,3.1) -
7、 Major A defect. - The moisture content of the primer mixture shall be determined for each batch or blend of batches at the time of loading. A sample, in sufficient quntity to perform the test detailed in 4.5.1, shall be selected and tested as specified in 4.5.3 If the moisture content is in excess
8、of the percentage specified and loading has not begun, the batch or blend of batches of primer mixture shall be rejected. If loading has begun, action on the unloaded primer mixture shall be as specified above and all detonators loaded with the questionable primer mixture shall be rejected. 4.4,3.3
9、Functioning. 4.4.3.3.1 Output. - (see 3.4.1) - Major A defect. -A sample of 315 detonators shall be selected at random from each lot. If 3 or more detonators fail to comply with the requirement specified the lot shall be rejected. If one or two defects are found, a second sample of 315 shall be sele
10、cted at random and tested. If, in the combined first and second sample, a total of 4 or more defects are found the lot shall be rejected, The test shall be performed as specified in 4.5.2.1. A sample of 25 primers shall be selected at random from each lot. IT one or more primers fail to comply with
11、the require- ment specified the lot shall be rejected. The test shall be performed as specified in 4,5.2.2 using test equipment as specified in 4.4 4 and 4.5.2.2. (see dwg. 9298009) - Major A defect. - A sample of approximately one grkm shall be selected from each batch or blend of batches 4,4.3.3.2
12、 Waterproofness. - (see 3.4.2) Major A defect. - 4.4.3.4 Determination of composition of primer mixture. - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-I?- 48 76 O (PA) for test as specified in 4.5.3. by the sample shall be Tejected If the sam
13、ple fails to comply with the requirements. 9258183) - Major A defect. - Sampling, acceptance criteria and test procedures for this test shall be as specified in MIL-P- All the composition represented 4.4.3.5 Heat seal test of sealed bag. - (see dwg. 116. 4 . 4.4 Inspection Equipment . - The inspecti
14、on equipment required to perform the inspections and tests prescribed in this specification is identified in the Paragraph Reference/ Inspection Method column in the tables starting with para- graph 4.4.2.1, and the test method paragraphs (see 4.5). The contractor shall submit for approval, inspecti
15、on equipment designs in accordance with the terms of the contract. See Section 6 of MIL-A-48078, and section 6-2 hereSn. 4.5 Test methods and procedures. 4.5.1 Moisture content of the primer mixture. - The moisture content of the primer mixture shall be determined in accordance with MIL-STD-650, Met
16、hod 101.5 except that dryfng temperature shall be 60 plus or minus 5 degrees C. and only 0.40 to 0.70 grams of primer mixture shall be dried. 4.5 . 2 Functioning. 4,5.2.1 Output. - The primer shall be assembled to the applicable test equipment and a steel ball weighing a maximum of 3.95 ounces shall
17、 be dropped from a maximum height of 1 1/2 inches on the firing pin of the test set up. A primer that fails to fire or fails to fire with a high order report shall be classed defective. The method of inspection shall be in accordance with dwgs. 8816367, 8827828, 8827829, 8827934, 9202650, 920012 and
18、 9201952. 4.5.2.2 Waterproofness. - The primers shall be immersed under water to the required depth for the specified time. The primer shall be subgected to the functioning test specified in 4.5.2.1 within one hour after removal from water. Any primer which fails to fire or fails to create a hole in
19、 the lead disc of the required size shall be classed defective. 4.5.3 Determination of cornposition of primer mixture. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- - MIL-P-48760 (PA) 4.5, 3.1 Potassium clilorate. 4.5,3.1.1 Preparation of solution
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP487601975PRIMERSTABM56PARTSFORANDLOADINGASSEMBLINGANDPACKINGM56 针刺 引物 零部件 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446438.html