1、30 June 1964 -I 1. SCOPE 1.1 This Specification covers the parts for one type of percussion primer designated as Primer, Percussion, M92E1. r 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect I on date of invitation for bids, or request for proposal, L form a part of this sp
2、ecification to the extent specified t herein. SPECIFICATIONS MILITARY MIL-A-2550 - Ammunition and Special Weapons; -1-45607 - Inspection Equipment, Supply and General Specification for. Maintenance of. STANDARDS MILITARY MIL-STD-105 - Sampling Procedure and Tables for Inspection by Attributes. MIL-S
3、TD-109 - Quality Assurance Terms and Definitions. MIL-STD-1167 - Ammunition Data Card. NIL-STD-1168 - Lot Numbering of Ammunition. MIL-STD-1169 - Packaging, Packing and Marking for Shipment of Inert emmunition Components. MIL-STD-1235 - Single and Multilevel Continuous Sampling Procedures and Tables
4、 for Inspection by Attributes. DRAWINGS FSC: 1390 A THIS DOCUMENT CONTAINS i! PAGES. .- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-mIL-P-4bb8bC 13 999990b 0314139 b MIL-P-46686C (MU) , .-. 8863399 - Wad 9231622 - Sleeve 9231699 - Head, Primer 92
5、31700 - Body Assembly . -8863400 - Tube i i PUBLICATIONS .* f ARMY -. ET-8 872.317- Equipment Tabulation (Copies of specifications ,. standards, drawings and publications Tequired by suppliers in. connection-with specific procurement functions should be obtained from the procuring activity or as dir
6、ected by the contracting officer)-. I- 3. REQUIREMENTS .i *. :. . _- 3.1 Material.-Materials shall be in accordance with applicable drawings and specifications. 3.2 Parts.-The parts shall comply with all requirements specified on Drawings 8863399, 8863400, 8863397, 9231622, 9231699, and 9231700., as
7、 applicable, and with all .requirements specified in applicable specifications. finished in a thorough, workmanlike manner. 3.3 .Workmanship.-All parts shall be fabricated and 3.3.1 Metal components.-They shall be clean and free of burrs, sharp edges, unblended radii, surface defects, cracks, chips,
8、 dirt, grease, corrosion and other foreign matter. The cleaning method used shall not be injurious to any parts nor shall the parts be contaminated by the cleaning agent. excessive flash, air bubbles, holes, blisters and foreign material. First Article Inspection.- This specification makes provision
9、s for first article inspection. Requirements for sub- mission of first article samples by the contractor shall be as specified in the contract. 3.3.2 Plastic components. -They shall be free from cracks, 3.3.3 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise specifi
10、ed in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I - I 4 MIL-P-46686C (MU) c
11、ontract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Govern- ment, The Government reserves the right to perform any of the inspections set forth in the specification where such i
12、nspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to Standard MIL-STD-109 in order to define terms used herein. The pro- visions of Specification MIL-A-2550 shall apply. 4.1.1 Submission of product.-At the time the completed l
13、ot of product is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and applicable to the product being submitted: a. A statement that the lot complies with all of the q
14、uality assurance provisions specified within this specification. b. Number of units of product inspected. c. Results obtained, by defect code, for all inspections performed. d. Drawing, specification number and date, together with an identification and date of changes. e. Certificates of conformance
15、 on all material purchased by the contractor when such material is controlled by Government or commercial specifications referenced in any of the contractual documents. The certificate shall be signed by a responsible agent of the certifying organization. The initial certificate submitted shall be s
16、ubstantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. f. Number of items in
17、the lot, g. Date submitted. 4.2 First Article Inspection 4.2.1 Submission.- The contractor shall submit a first article sample designated by the contracting officer for evaluation in accordance with the provisions of 4.2.2. The first article sample shall consist of 10 each individual components, (se
18、e Note below) which have been produced by the cgntractor or furnished by a supplier and which have been manufactured using the same production processes, procedures 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-P-46686C (MU)- I and equipmen
19、t whlch wiTB -be used in fulfilling the contract. AI1 parts and materials including packaging and packing, shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the contractor shall Inspect the sample to-the degree necessary to assure that it co
20、nforms-to the requirements of the contract and submit a record of this inspection with the sample, including statements of findings for materials, processes, and tests. A sample contain- ing known defects will not be submitted unless specifically authorized by the Contracting Officer. or portion the
21、re of as directed by the contracting officer shall also be submitted whenever there is a lapse in production for a period in.excess-of 90 days or whenever a change occurs in manufacturing process, materal used, drawing or specification such as to significantly affect product uniformity as determined
22、 by the Government. Note: molded parts when more than 1 (one) single cavity .mold or multiple cavity molds are used .in the fabrication of any component, 5 (five) sample components from each mold cavity shall be submitted in lieu of the above requirements of 10 (ten) samples of each component. ! i !
23、 I A first article sample 1. t On Molded components shall be identified 6 .as to mold and cavity numbers. . 4.2.2. Inspections to be performed.-Assemblies and components will be subjected by the Government to any or all of the examina- tions or tests specified in this specification and any or all re
24、quirements of the applicable drawings. 4.2.3 Rejection.-If any assembly or component fails to comply with any or all of the applicable requirements, the first article sample shall be rejected. The Government reserves the right to terminate its inspection upon any failure of assembly component in the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP46686C1968PRIMERPERCUSSIONM92E1PARTSFORM92E1 撞击 引物 零部件 PDF

链接地址:http://www.mydoc123.com/p-446323.html