ARMY MIL-P-46499-1961 PRIMER PERCUSSION M78 LOADING ASSEMBLING AND PACKING《M78式撞击引物的装药 组装和包装》.pdf
《ARMY MIL-P-46499-1961 PRIMER PERCUSSION M78 LOADING ASSEMBLING AND PACKING《M78式撞击引物的装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-46499-1961 PRIMER PERCUSSION M78 LOADING ASSEMBLING AND PACKING《M78式撞击引物的装药 组装和包装》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-(Copies of epecif%eatioas, standarda, drawings aad publieations required _. by - eon- - tractors fn connection Kptia specific procuremant functioni from the poeung activity or as directed by the contrac
2、ting officer.) mer at the loadfng station, at the time of loading, shaa no% exceed 0.7 percent when detePrnineil SB specified %II k.k.l. 3.4 Seneit$vity. 3.4 o 1 Nan -funet ionii 3,4,2 Fpictfonfng.-The pr-r shall function dr an apgdied energy velue Of 29-40 noh 1 3.5 Waterpoofneee and security of ga
3、Pte.-The ppiarera shaU funetion d being Wereed in water tc of hangfire, blowback, or separation of parte when tested at3 epeeffffed in 4.4,3. 3.6 Workmsllship. TAU parte ahal% be free from other foreign matter. !l!he cleaning method wed ehaU not be injulous to any ar the parte nor ehall the parta be
4、 contaminated by the cleaning agente. I I - I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-46499- (ord) bol General quality asaurance provieicme.-Ths supplier ie rssponeible for the perfomnce of all inspection requireaient6 specified herain.
5、 Except 86 otherwise specified, the supplier may utiizs his own or any other inspection %W reaerveB the right to perfopm any of the inepections set forth in the epecification where auch inspections are or quality assurance system.-Tht contractor shall provi* and maintain ern effective quality assura
6、nce system acceptable to the Oovermment coveping the supplies procured under this specification clad ahall parform all inspections required by the system. A current written eeeription of the system sbaU be submitted to the contracting officer, and met hie approval, prior to initiation of proauction.
7、 lot formation and identification, inspectime to bepCrfortPed, inspection stations, sampli testing equipmen3 and proviafone for the control and disposition of non- conformfig material. when, as a minimuni, it provies the quality assurance required by the provisions of 4,3 and 4.4 and the other docum
8、ents reference8 herein. Except in the cases of 4,4.2.1 and 4.4.2.2, the contractor shall not be restricted to the inspection station nor the method of 6pection listed in thie specffication provided that an equivalent control is included in the approved quality assurance procedure. in cases of disput
9、e as to whether certain procedures of the contractors system provide eq=% assurance, the comparable procedure of this specification shall apply. !%e contractor shall notify te Goversment of, and obtain approval for, any change to the written proceure that affecte the degree of assurance required by
10、this spoification or other documents referenced herein. In te case of the non-fwnctioning and functioning tests of the primer, the weight of the ball and height of bop shall not differ from the values specified in 4.4.2.1 and 4,4.2.2 and on the applicable test equipment drawing. submitted to the Gov
11、ernment for acceptance the contractor shall supply th follow- ing information accompanied by a certificate which attetm that the information provided ie correct an applicable to the pkoduct being submitted: a. A statement that the lot complies wit 8. quality assurance provisions of the approved curr
12、ent written description of the Bystem. b. NU. equipment specified in 4.3.5. The test shall be perfoniled as specified in 4.4.2.2, using test Code letter L, and an AU of 1.00 percent. 4.4.3 using equipment in accordence with 4.3.5. The test shalll be as specified in one manufacturer in one unchanged
13、process, in accordance wi%h the -me drawing,; same CiraKing reviion, 8ame specification, and aaw specification revision. Drawing, epecification and proeeas changeis no% Csffecidng safety, perfoPmarilee, OP fit, at9 determined by the Government, shall sst neeeaei.tate changing the lot nunher. Each lo
14、t shall conkin: a. Metal parts of one interfix lot rimer from one manufacturer. b. Black pou de of one interfix lot number from one manufacturer. c. Rimer ia.i;lh 41 Prlmr, prior to assenBlin3.3.2 Sensitivity. 4,3.3.2.1 Non-functioning ( see 3.4.1) Critica wect.-The sampiing plan for this test shall
15、 be in accordance with Standard MIL-STD-105, %able IVA, Code letter I, and A2 -?&ctionina see 3,4,2) BWor defect.-A sample of 325 assemblies shall be selected fpom each lot for this test. If two or more sssembliee fail to cornpli with the requirement, the lot shall be rejected, found, a second sampi
16、e of 250 aesenibXies shall be tested, of efectives in both the first and second samples is two or mm the lot shall be rejected, specified in 4.3.5. eiampling plan for this test shall be in accordence with Standard MIL-STD-lW, Code letter I, and AQL of 1.00 percent. The test shall be perforpped a6 sp
17、ecfba in 4.403 using equipment in accorance with 4.3.5. 4.3.4 Check test for deterioration of the Wipper element.-= the total time between the manirfacture of any priiper element lot and the assembly ob that lot into M primere exceeds 2 yeam or if the prlmer elements heive been subgected to adverse
18、conditions, however brief, at any time ence previous tests, the prfmsr element lot shall be subjected t and must aatiefactorily ccmply with the check test specified in 4.4.4 immediately before the primer elements are assembled into the Bi78 primers. selected by the Government mpector at the facility
19、 aseeniblng the primere element into the pr(8 primre. Twenty-five primer elements shall be tested at each height. if the sum of the mean critical height (see 6,5) plu8 (1) 5 standard deviati4 (8) excesas the upper limit (15 inches), or B -2s is leas than the lower limit (3 inches) the lot shall be r
20、ejected. The test shall be performed aa specified in 4.4.4 wing equipment specified in 4,3.5. 6.3.5 Inspection equinmnt.-For the performsnce of the examlaations and tests specified in 4,3 and 4.4, the contractor shall have available, and utilize correctly, all necessary gagea, measuring and test- eq
21、uipanent (see 6.2). When inspectfig the contractor9s inspection equpnt, the Goverament Inspector Xiai determine that the contractor has available, andutilfzee correctly, gages, maeuring and testing equipaenti of the required accuracy and precision and that the instrwnts are of the proper type and ra
22、nge to make measurements of the If only une defective le If the eoinbined nuniber The test shaU. be performed as specified in 4,4.2,2 ue5ng equipimsnt 4.3.3.3 Waterproofness and secmity of! parts (see 3*5) Wador defect.-T&e The test shall be perfoniied on a sample of 325 primer elenaente 8 Q Provide
23、d by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MSL-P-Wgg (ora) regutred accuracy, The eontraetw KPU have available a set of master gages, standarde and approprate fnstptairents for regularly achedulea calibrstion uf his inspection equipmento be maintained
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP464991961PRIMERPERCUSSIONM78LOADINGASSEMBLINGANDPACKINGM78 撞击 引物 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446310.html