ARMY MIL-P-46431 C-1976 PRIMER ELECTRIC M86 PARTS FOR《M86电引物用部件》.pdf
《ARMY MIL-P-46431 C-1976 PRIMER ELECTRIC M86 PARTS FOR《M86电引物用部件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-46431 C-1976 PRIMER ELECTRIC M86 PARTS FOR《M86电引物用部件》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-4bq33C 33 7777706 0333777 2 32vJ7 1-46431C (PA) $0 August 1976 SUPERSEDING 9 August i965 MIL-P-46431B (MU) * MILITARY SPECIFICATION PRIMER, ELECTRIC, M86 PARTS FOR Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document
2、should be addressed to: Commander, Picatinny Arsenal, Dover, New Jersey 07801 by using the self-addressed Standard- ization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. This specification is approved for use by Picatinny Arsenal, Department of the
3、Army and is available for use by all Depart- ments and Agencies of the Department of Defense. 1. Scope 1.1 This specification covers the parts for one type of electric primer designated as Primer, Electric, M86. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of in
4、vitation for bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification for STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-
5、1169 - Packaging, packing and Marking for Inspection by Attributes Shipment of Inert Ammunition components FSC; i390 - THIS DOCUMENT CONTAIS 4 PAGES. I + Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DRAWINGS ARMY 8847425 - Body, Metal Parts Assemb
6、ly 9313896 - Body, Metal Parts Assembly (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer). 3. REQUIREMENTS 3.1 Material.-Mat
7、erials shall be in accordance with 3.2 applicable drawings and specifications. Metal parts assembly.-The metal parts assemblies shall comply with all requirements specified on Drawing (dwg.) 8847425 or 9313896 and with all requirements specified in applicable speci- fications. the application of a m
8、inimum (min.) hydrostatic pressure with- out rupture or indication of flaws, as evidenced by leaks, and without permanent deformation beyond drawing requirements, when tested as specified in 4.5.1 (see 6.3). the head to the primer body shall withstand a pull of 5500 pounds min. without evidence of s
9、eparation of the head from the primer body when tested as specified in 4.5.2. 3.3 Hydrostatic test.-The primer tubing shall withstand 3.4 Pull test of brazed joint.-The brazed joint securing in a chip dirt 3.5 Workmanship.-All parts shall be fabricated and finished , thorough, workmanlike manner. Th
10、ey shall be free of burrs, s, sharp edges, cracks, unblended radii, surface defects, , grease, rust, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. All required markings shall be neat
11、 and sharply defined. 3.6 First Article Inspection.-This specification makes provisions for first article inspection. submission of first article samples by the contractor shall be as sp.ecified in the contract. Requirements for 4. QUALITY ASSURANCE PROVISIONS 2 Provided by IHSNot for ResaleNo repro
12、duction or networking permitted without license from IHS-,-,-flIL-P-46431C 13 M ff777Ob 031198L O MIL-P-46431C (PA) i 4.1 Responsibility for Inspection and Standard Quality Assurance Provisions.-Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are h
13、ereby made a part of this detail specification. of inspection shall be conducted on this item: 4.2 Classification of Inspections.-The following types a. First Article Inspection b. Quality Conformance Inspection 4.3 First Article Inspection 4.3.1 Submission.-The contractor shall submit a first artic
14、le sample designated by the contracting officer for evalua- tion in accordance with the provisions of 4.3.2. The first article sample shall consist of 25 each individual components, which have been produced by the contractor or furnished by a supplier and which have been manufactured using the same
15、pro- duction processes, procedures and equipment which will be used in fulfilling the contract. All parts and materials including packaging and packing, shall be obtained from the same source of supply as will be used in regular production. mission, the contractor shall inspect the sample to the deg
16、ree necessary to assure that it conforms to the requirement of the contract and submit a record of this inspection with the sample, including statements of findings for materials, processes, and tests. A sample containing known defects will not be submitted unless specifically authorized by the Cont
17、racting Officer. A first article sample or portion thereof as directed by the con- tracting officer shall also be submitted whenever there is a lapse in production for a period in excess of 90 days or when- ever a change occurs in manufacturing process, material used, drawing or specification such a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP46431C1976PRIMERELECTRICM86PARTSFORM86 引物 部件 PDF

链接地址:http://www.mydoc123.com/p-446298.html