ARMY MIL-P-46337 B-1972 PERISCOPE TANK M35《M35式坦克潜望镜》.pdf
《ARMY MIL-P-46337 B-1972 PERISCOPE TANK M35《M35式坦克潜望镜》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-46337 B-1972 PERISCOPE TANK M35《M35式坦克潜望镜》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-P-463379 12 W 7777706 03L131Li 5 /-7 MIL-P-46337B (MU) 31 January 1972- SUPERSEDING HIL-P-46337A (MLJ) 21 July 1965 MILITARY SPECIFICATION PERISCOPE, TANK: M35 1. SCOPE 1.1 This specification covers one type of combination infrared- daylight tank gunners periscope designated Periscope, Tank: M35
2、. The preiscope is a part of the fire control system in the 105MP.1 Gun Tank: M60 and is used for day and night sighting and observing. 2 e APPLICABLE DOCUMENTS 2.1 The following documents, of the issue in effect on date of invi- tation for bids or request for proposal form a part of this specificat
3、ion to the extent s p eci f ied e SPECIFICAT Military MIL-O- O NS 3830 Optical Components for Eire Control Instruments: General Specification Governing the Manufacture, Assembly, and Inspection of Specification Governing the Manufacture and Inspection of MIL-P-14232 Parts, Equipment and Tools for Ar
4、my Materiel, Packaging and Packing of MIL-1-45607 Ins-pection Equipment, Acquisition, Maintenance and Disposition of MIL-B-50367 Body (Daylight) Assembly: 10516590 MIL-H-50368 Head Assembly: 10514220 MIL-B- 14843 Body (Infrared) Assembly: 10541950 MIL-F-13926 Fire Control Material: General STANDARDS
5、 Mil it ary MIL-STD-105 Sampling Procedures and Tables for MIL-STD- 109 Quality Assurance Terms and Inspection by Attributes Definitions FSC 1240 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-4633773 (MU) MIL-P-4b337B 12 M 9999906 03LL3L5 7
6、 DRAWINGS US. Army Frankford Arsenal F8213369 F8247391 . F8575736 F85 75 995 F8575996 F10540499 F10547434 F 117 32 155 F11732156 Periscope, Tank: M35 Test Fixture for Periscopes M32 and M35 Vibration Adapter for Periscopes M32 and M35 Set-up Instructions for Test Fixture Operating Instructions for T
7、est Fixture Universal Test Stand and Set-up Instructions 10“ Collimator Gage, Interchangeability, Minimum Gage, Interchangeability, Maximum F8247391, Periscopes M32 and M35 F8247391, Periscopes M32 and M35 PACKAGING DATA SHEET 8213369 Packaging of Periscope, Tank: M35 (Copies of specifications, stan
8、dards, drawings and packaging data sheet required by suppliers in connection with specific pracurements functions should be obtained from the procuring activity or as directed by the con- tracting officer.) 3. REQUIREMENTS 3.1 Materials.- The materials shall be in accordance with the draw- ings, mat
9、erial specifications and general specifications forming a part of this specification. 3.2 Fabrication.- The periscope shall be manufactured in accordance with Drawing F8213369 and drawings pertaining thereto, The following shall have met their respective specifications (except that they need not be
10、subjected to separate vibration tests) and be interchangeable within . the requirements of this specification. Body (Infrared) Assembly: 10541950 MIL-B-14843 Body (Daylight) Assembly: 10516590 MIL-B-5 03 6 7 Head Assembly : 10514220 MIL-H-50368 3.2.1 Interchangeability. a. Modules.- The periscope sh
11、all meet the requirements of 3.6.2, 3.6.5, 3.6.6,3.6.6.1 and 3.6.8 without need for realignment of components or selection of modules listed in 3.2. Adjustments, other than tho.se specified herein, are prohibited. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license
12、 from IHS-,-,-MIL-P-Lt6337B 12 7777906 0311316 7 MIL-P-46337B (MU) b. Periscope with mount.- The periscope shall be capable of in- sertion into the gages specified in 4.6.5.2. After insertion, the periscope shall be capable of being firmly secured and subsequently removed. 3.3 General specification.
13、- The contractor shall be responsible or ad- herence to, and compliance with the following requirements of MIL-F-13926, a. Order of precedence b. Dimensions and tolerances c. Inorganic protective surface finishes d. Part identification and marking e. Workmanship 3.4 Vibration.- This requirement shal
14、l be met with the image converter tube and reticle projector lamp energized by the application of +24 i? 6.0 vdc to the contact for the IR power supply and the reticle projector lamp (Refer- ence Drawing F10541950). The periscope shall be vibrated in a vertical plane at a constant frequency of 30 cy
15、cles per second (cps) with an amplitude of 1/6 inch (118 inch total excursion) for a period of 5 minutes plus or minus 15 seconds. There shall be no failure or flicker of light emission from the image converter tube and reticle projector lamp during vibration and the periscope shall show no evidence
16、 of physical faililre subsequent to vibration. Following the vibration test the periscope shall meet all remaining requirements and then each module (see 3.2) shall meet their own respective post vibration test requirements. 3.5 Cleanliness. - With the periscope disassembled , the three modular unit
17、s shall meet the following requirements: a. Defects.- There shall be no evidence of moisutre, grease, fing- erprints, condensates fractures, and adhesive separations on any glass compon- ent when viewing through either end of each module. b. Dirt. - (i) Body assembly (daylight) .- When viewed throug
18、h the eye- piece, there shall be no more than three dirt particles appearing within a 50 mil diameter central field of view. There shall be no more than three dirt particles appearing outside the specified field of view. The angul- ar separation between dirt particles shall be at least 15 mils. Dirt
19、y parti- cles smaller than 114 reticle line width shall be ignored regardless of dis- tribution. The size of any particle shall not exceed the apparent width of the reticle line. (2) Body assembly (infrared) .- When viewing through the eye- piece with the image converter tube energized, there shall
20、be no more than five (5) particles visible on the screen surface. The size of any particle shall not exceed the apparent width of the reticle line. (3) Head assembly.- There shall be no more than three particles of dirt or foreign material (classed as dirt) on any glass compon- ent. The size of any
21、dirt particle shall not exceed 0.05 inch. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-qb337B 12 M 777990b 0311317 O MIL-P-46337B (MU) 3.6 Per formance. 3.6.1 Orientation. a. Datum Plane W“ (Ref. Dwg. F11727077) defined by the four Datum Pla
22、ne iiYii (Ref. Dwg, F10514220) mounting pads in a vertical plane, on a horizontal plane. be Side “L“ (Ref. Dwg. F10514220) of the input coupling positioned 20 degrees 30 minutes with respect to Datum Plane VIi as measured in a vertical plane. NOTE: At no time shall the input coupling be allowed to s
23、trike hard against the travel stops. c. The requirements of 3.6.3.1 to 3,6,3.2 inclusive, shall be met with: (1) The clear filter positioned in the field of view. (2) An infinity target which is projected into Lens 8289292 perpendicular to Datum Plane “W“. (3) The eyepiece of the daylight system foc
24、used on the image of the projected infinity target. (4) The eyepiece of the I,R, System focused on the screen of the image converter tube, (5) A i200 meter target provided for both the daylight and I.R. Systems. d, Focus infrared body assembly by rotating objective focusing Ring 8620059 for best res
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP46337B1972PERISCOPETANKM35M35 坦克 潜望镜 PDF

链接地址:http://www.mydoc123.com/p-446288.html