ARMY MIL-P-2497 B (3)-1981 PRIMER PERCUSSION M27 LOADING ASSEMBLING AND PACKING《M27式撞击引物的装药 组装和包装》.pdf
《ARMY MIL-P-2497 B (3)-1981 PRIMER PERCUSSION M27 LOADING ASSEMBLING AND PACKING《M27式撞击引物的装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-2497 B (3)-1981 PRIMER PERCUSSION M27 LOADING ASSEMBLING AND PACKING《M27式撞击引物的装药 组装和包装》.pdf(5页珍藏版)》请在麦多课文档分享上搜索。
1、- c .-CI - - Y i 1 MIL-P-2497B (3) 13 m 9999906 0291817 b d , 1 ML-P-2497B (AR) : 3-37-19 -, AMENDMENT 3 14 August 1981 SUPERSEDING AMENDMENT 2 1 July 1965 MILITARY SPECIFICATION PRIMER, PERCUSSION, M27 LOADING, ASSEMBLY AND PACKING This amendment forms a part of Military Specification MIL-P-2497B (
2、MU), dated 11 September, 1963. PAGE 1 Add the following Preamble underneath the title: “This specification is approved by the US Army- Armament Research and Development Command, and is available for use by all Departments and Agencies of the Department of Defense.“ 2.1, Specifications: Military: Del
3、ete “MIL-I-4520818 in its entirety. Standards, MIL-STD-105: After attributes add I (ABC- STD- 10 5 ) I . PAGE 3 4.1, Delete in its entirety and substitute the following: “4.1 General quality assurance provisions. -Unless otherwise specified in the contract or purchase order, the supplier is responsi
4、ble for the performance of all inspection requirements. as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any commercial laboratory acceptable to the Government. The Government: reserves the right to perform any of the inspectons set forth in the spec
5、ification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to Standard MIL-STD-109 in order to . define terms used herein. The provisions of Specification MIL-A-2550 shall apply.“ 4.1.1: Delete in its entirety. I
6、4.1.2: Delete in its entirety and substitute the following: “4.1.1 Submission of product. - At the time the completed lot of product is submitted to the Government for acceptance the contrac-tor shall- supply the following information accompanied by correct and applicabIe to the product being submit
7、ted: FSC 1390 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-j MIL-P-2477B (3) 13 U 7777906 0291818 Il - - - - - MIL-P-2497B(AR) AMENDMENT 3 a. b. A statement that the lot complies with all quality assurance provisions specified within this specific
8、ation. Number of units of product inspected. c. Results obtained, by defect code, for all inspection perf ormed. d. Drawing, specification number and date, together with an identification and date of changes. e. Statement of findings on the primer mixture and associated ingredients and a certificate
9、 of conformance on all material purchased by the contractor when such material is controlled by Government specifications referenced in any of the con tract ual documents . f . Number of items in the lot . g. Date submitted. The certificate shall be signed by a responsible agent of the certifying or
10、ganization. shall be substantiated by evidence of the agents authority to bind his principal. will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the Cer tif ying organization . The initial certificate submitted Su
11、bstantiation of the agents autharity 4.1.3: Delete in its entirety and substitute the following: “4.1.2 Government verification. - Using the contractors written quality assurance procedure, this detail specification, the applicable drawings and other contractual documents as a guide, the Government
12、inspector shall verify at unscheduled intervals all quality assurance operations performed by the contractor. Verification will be performed to the extent necessary to assure compliance with the contractual requirements. Severity of Government inspection of individual characteristics will be directl
13、y related to the seriousness of the classification assigned. In no instance will. a characteristic classified “critical“ be accepted solely on the basis of the contractors records.“ . - 4.2.1, line 4, After “lot interfix number“: cubmi tted for inspection in accordance with Standard MIL-STD-105 (or
14、Standard MIL-STD-1235 when applicable) .I add “Lots shall be Page 2 of 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-P-ZLI77B (3) 13 777770b 027L17 T I - . - - . . MIL-P-2497B (AR) AMENDMENT 3 4.2.2, line 5: After “MIL-STD-1235 may be .used,
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP2497B31981PRIMERPERCUSSIONM27LOADINGASSEMBLINGANDPACKINGM27 撞击 引物 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-446185.html