ARMY MIL-P-20512 D-1987 PROJECTILE 155 MM SMOKE HC BE M116E2 LOADING ASSEMBLING AND PACKING《M116E2 HC BE 155 mm烟幕弹的填装 组装和包装》.pdf
《ARMY MIL-P-20512 D-1987 PROJECTILE 155 MM SMOKE HC BE M116E2 LOADING ASSEMBLING AND PACKING《M116E2 HC BE 155 mm烟幕弹的填装 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-20512 D-1987 PROJECTILE 155 MM SMOKE HC BE M116E2 LOADING ASSEMBLING AND PACKING《M116E2 HC BE 155 mm烟幕弹的填装 组装和包装》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、i MIL-P-20512D( EA) 12 May 1987 SUPERSEDING MIL-P-20512c ( EA) 14. February 1978 MILITARY SPECIFICATION PROJECTILE, 155bM, SMOKE, HC BE, 1.161, LOADING, ASSEMBLING AND PACKING This specification is approved for use within U.S. Army Chemical Research, Development and Engineering Center, Department of
2、 the Army, and is available for use by all Departments. and Agencies of the Department of Defense. 1, SCOPE 1.1 Scope. This specification covers the loading, assembling , and packing of Projectile, 155Mk, Smoke, HC, BE; Mi16A1. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications a
3、nd standards. The following.specifications and stan- dards form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these documents chail be those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and su
4、pplement thereto , cited in the solicitation. SPECIFICATIONS MILITARY MILA-2550 - Ammunition, General Specification For. : Beneficial comments (recommendations , additions , deletions) and any perti- : : nent data which may be of use in improving this document should be addressed: : to: Commander, U
5、.S. Army Chemical Research, Development and Engineering : : Center, ATTN: SMCCR-SPT-S, Aberdeen Proving Ground, MD 21010-5423 by using: : the self-addressed Standardization Document Improvement Proposal (DD Form : : 1426) appearing at the end of this document or by letter. FSC 1320 AMSC N/A THIS DOC
6、UMENT CONTAINS /o PAGES. DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. 0303322 L m MIL-P-20512D( EA) STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables
7、 for Inspection by Attribut es. MIL-STD-129 - Marking for Shipment and Storage. MIL-STD-1168 - Ammunition Lot Numbering. MIL-STD-1235 - Single and Multilevel Continuous Sampling Procedures . MIL-STD-1167 - Ammunition Data Card. and Tables for Inspection by Attributes. 2.1.2 Drawings. The following d
8、rawings form a part of this specification to the extent specified herein. those in effect on the date of the solicitation. Unless otherwise-specified, the issues shall be DRAW1 NGS U.S. ARMY ARMAMENT, MUNITIONS AND CHEMICAL COMMAND ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER 7549275 - Pall
9、et for i55 MM Projectile. CHEMICAL RESEARCH, DEVELOPMENT AND ENGINEERING CENTER 8885162 - Projectile, i55 MM, Smoke, HC, BE, 1161 Withoui Fuze. (Copies of specifications, standards, anddrawings required by contractors in connection with specific acquisition functions should be obtained from the con-
10、 tracting activity or as directed by the contracting activity.) 2.2 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein ( except for as.sociated detail specifications , specification sheets or MS standards) , the text of this specifi
11、cation shall take precedence. shall supersede applicable laws and regulations unless a specific exemption has been obtained. Nothing in this specification, however, 3. REQUIREMENTS 3.1 Materials. Materials shall be in accordance with applicable drawings and specifications. 3.2 Projectile. The projec
12、tiles shall comply with all requirements speci- fied on Drawing 8885162 , and applicable specifications. 3.2.1 Expelling charge assembly. There shall be no evidence of loose black powder in the fuze threads or fuze well area of the projectile after load, Provided by IHSNot for ResaleNo reproduction
13、or networking permitted without license from IHS-,-,-a MIL-P-20512D( EA) assemble and pack or evidence of a broken or cracked expelling charge assembly prior to insertion of the lifting plug. considered a critical defect (see 4.2.3.2). Evidence of either condition is 3.3 Proving ground. The projecti
14、les shall comply with the following requirements when tested as specified in 4.3.1. 3.3.1 Functioning. The projectile shall eject its four canisters during out explosion or disintegration for no less than 57 seconds to i70 seconds for the M1 canister and 27 seconds to i40 seconds for the M2 canister
15、 (see 4.3.1.1) flight. Each canister, after ejection, shall ignite and emit white smoke with- 3.3.2 Premature functioning and security of parts. There shall be no pre- mature functioning or indication of metaliparts failure within the gun bore or in flight before functioning of the.fuze. 3.3.3 Safet
16、y. There shall be no premature burst or indication of metal parts separation in the gun bore or in flight before functioning of the fuze when fired with the M4A2 propelling charge (zone 7) conditioning at 145“ - 5“F, - from a howitzer equipped with an 126 or MlA2 cannon. made for compliance with the
17、 specified requirements of section 4 (see 4.3.1.3 and 4.5h.3) . . Observation shall be 3.4 Workmanship. The assembled projectile shall be free from contamination (oil, rust , grease, foreign material) and damage, including but not limited to; dents, cracks, or deformation which could affect its inte
18、nded use. Care should be exercised at all times to prevent damage (nicks and burrs) to the projectile rotating band . 4 . QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Uniess otherwise specified in the con- tract or purchase order, the contractor is responsible for the performance
19、of all inspection requirements as specified herein. in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance of the inspection requirements speci- fied herein, unless disapproved by the Government. The Government reserves the right to per
20、form any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to pre sc ribed requirements . Except as otherwise specified 4.1.1 Responsibility for compliance. All items must meet all requirements of sections 3 and 5. T
21、he inspection set forth in this specification shall become a part of the contractors overall inspection system or quality program. The absence of any inspection requirements in the specification shall not relieve the contractor of the responsibility of assuring that all products or supplies submitte
22、d to the Government for acceptance comply with all require- ments of the contract. mission of known defective material, either indicated or actual, nor does it commit the Government to acceptance of defective material. Sampling in quality conformance does not authorize sub- 3 Provided by IHSNot for
23、ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-205L2D 13 777770b 0301124T MIL-P-20512D ( EA) 4.1.2 Additional responsibility of contractor. Drawings for contractor designed inspection equipment (other than standard measuring equipment) shall be forwarded to the desi
24、gn agency for approval prior to production (see 6.1(b) ). be supplied for each lot of projectiles. Ammunition data cards prepared in accordance with MIL-STD-1167 shall 4.1.3 Objective evidence. The contractor shall provide objective evidence acceptable to the contracting officer that the requirement
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP20512D1987PROJECTILE155MMSMOKEHCBEM116E2LOADINGASSEMBLINGANDPACKINGM116E2HCBE155MM 烟幕弹 组装 包装

链接地址:http://www.mydoc123.com/p-446175.html