ARMY MIL-P-10334 B-1984 POT SMOKE FLOATING HC M4A2 COMPONENTS FOR《M4A2式HC漂浮式烟幕罐的部件》.pdf
《ARMY MIL-P-10334 B-1984 POT SMOKE FLOATING HC M4A2 COMPONENTS FOR《M4A2式HC漂浮式烟幕罐的部件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-P-10334 B-1984 POT SMOKE FLOATING HC M4A2 COMPONENTS FOR《M4A2式HC漂浮式烟幕罐的部件》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、5-4 3 71 /=f MIL-P-1033qB 13 W 9999906 0292969 L I SPECIFICATIONS KCL-P- 1 O 3 34 B ( EA) 19 January 1984. SUPERSEDING MIL-P-1 O 3 3 4A( EA) 18 July 1980 MILITARY SPECIFICATION POT, SMOKE, FLOATING, HC, M4A2 COMPONENTS FOR This specification is approved for use by US Army Arnament, Munitions and Che
2、mical Command, Department of the Army, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers one type of smoke pot. 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications, standards, and handbooks. Unless
3、otherwise specified, the following specifications, standards, and handbooks of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DODES) specified in the solicitation form a part of this specification to the extent specified herein. MILITARY MIL-A-4807
4、8 - Ammunition, Standard Quality Assurance Provisions, General Specification for : Beneficial comments (recommendations, additions, deletions) and any perti- : : nent data which may be of use in improving this document should be addressed: : to: Commander, Armament Research and Development Center, U
5、S Army Armament, : : Munitions and Chemical Command, ATTN: DRSHC-TSC-S(A), Aberdeen Proving : Ground, MD 21010 by using the self-addressed Standardization Document : Improvement Proposal (DD Form 1426) appearing at the end of this document : : or by letter. FSC 1365 THIS DOCUMENT CONTAINS 9 PAGES.-
6、Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_- MIL-P-LO334B 13 7777906 0272770 8 W MIL-P- 1 O 334 B( EA) STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes 2.1.2 Other Government documents, drawings, and
7、publications. The following other Government documents, drawings, and publications form a part of this spec- ification to the extent specified herein. DRAWING AND TECHNICAL DATA PACKAGE LIST (TDPL) US ARMY ARMAMENT, MUNITIONS AND CHEMICAL COMMAND CHEMICAL RESEARCH AND DEVELOPMENT CENTER TDPL 36-1-26
8、 - Pot, Smoke, Floating, HC, M4A2. (Copies of specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contract- ing officer. ) 2.1.3 Other publi
9、cations. The following documents form a part o this spec- ification to the extent specified herein. The issues of the documents which are indicated as DoD adopted shall be the issue listed in the current DoDISS and the supplement thereto, if applicable. ASTM STANDARDS D 3951 - Commercial Packaging (
10、Application for copies should be addressed to ASTM, 1916 Race Street, Philadelphia, PA 19103.) 2.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this specifica- tion shall take precedence. 3. REQUIREMENTS 3.1 Mater
11、ials and components. All materials for components cited on the applicable drawings, which is listed on TDPL 36-1-26 shall conform to the speci- fications listed thereon and to the specific characteristics set forth on the drawings. 2 Provided by IHSNot for ResaleNo reproduction or networking permitt
12、ed without license from IHS-,-,-e e MIL-P-1033qB 13 m 7777706 0272771 T I/ - MTL-P-l0334B(EA) 3.2 Leakage. The container (Drawing 36-2-226) shall not leak when subjected to an internal air pressure of 15 pounds per square inch gauge (psig) and tested in accordance with 4.5.2. The cover, outer (Drawi
13、ng 36-2-128) and the cover, inner (Drawing 36-2-227) shall not leak when subjected to an air pres- sure of 5 pounds per square inch gauge (psig) and tested in accordance with 4.5.1 and 4.5.3, respectively. 3.3 Handle lug separation. The lugs (Drawing 36-2-193) shall not separate from the outer cover
14、 assembly (Drawing 36-2-128) nor from the inner cover assem- bly (Drawing 36-2-227) when subjected to a 50 pound load per lug when tested in accordance with 4.5.4. 3.4 Preproduction. Prior to the start of regular production, a preproduc- tion lot of components shall be produced in accordance with th
15、is specification for examination and tests. 3.5 Workmanship. The components shall be free from contamination (foreign matter) and damage such as dents, cracks and deformation which would impair their intended use. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. 4.1.1 Contractors r
16、esponsibility. Unless otherwise specified in the con- tract or purchase order, the contractor is responsible for the performance of all inspection requirements as specified herein. in the contract or purchase order, the contractor may use his own or any other facilities suitable for the performance
17、of the inspection requirements speci- fied herein, unless disapproved by the Government. right to perform any of the inspections set forth in the Specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Except as otherwise specifie
18、d The Government reserves the 4.1.2 Objective evidence. The contractor shall provide objective evidence acceptable to the contracting officer that the requirements of 3.1 and section 5 for which specific inspection has not been provided in this specification have been satisfied. 4.1.3 Inspection equ
19、ipment. For inspection equipnient required to perfom the examination and tests prescribed herein; the contractor shall submit for approval, inspection equipment designs in accordance with the terms of the con- tract. (See section 6 of MIL-A-48078 and 6.3 herein). 4.2 Classification of inspections. T
20、he inspection requirements are classi- fied as follows: (a) Preproduction inspection (see 4.3) (b) Quality conformance inspection (see 4.4). 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-P-103348 I3 90b 0292972 I i m 4.3 Preproduction inspe
21、ction. 4.3.1 - Lot. A preproduction lot of components shall be produced using the same methods, materials, equipment and processes as will be used in regular pro- duct ion. 4.3.2 Sampling. 4.3.2.1 For examination and nondestructive test. Sampling shall be con- ducted in accordance with MIL-STD-105,
22、except the cup, starter (Drawing 36-2-63) shall meet the requirements of 4.4.3.1. starter (Drawing 36-2-63) dimensionally examine five each parts from each cavity for conformance to all dimensions on Drawing 36-2-63 to qualify the pro- cess and the tooling. For the tool controlled cup, 4.3.2.7, For
23、destructive test. Sample inner covers and outer covers shall be tested in accordance with 4.5.4. with MIL-STD-105, level S-4 with an AQL of 1.0 percent. Sampling shall be conducted in accordance 4.3.3 Acceptance/rejection criteria. The preproduction sample shall comply with the examinations and test
24、s specified in 4.4.3.2 to be acceptable. acceptance number is zero. the contracting officer prior to proceeding with regular production. The The contractor shall obtain written approval from 4.4 Quality conformance inspection. 4.4.1 Lotting. A lot shall consist of the components of one interfix numb
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILP10334B1984POTSMOKEFLOATINGHCM4A2COMPONENTSFORM4A2 HC 漂浮 烟幕 部件 PDF

链接地址:http://www.mydoc123.com/p-446056.html