ARMY MIL-N-48153-1974 NOSE LUCKY AND INSULATOR ASSEMBLY FOR CARTRIDGE 105MM HEAT-T M456A1E1 PARTS FOR ASSEMBLY AND PACKING《M456A1E1式105 mm口径破甲弹弹药筒用LUCKY牌弹头和绝缘子组件用部件的填装 组装和包装》.pdf
《ARMY MIL-N-48153-1974 NOSE LUCKY AND INSULATOR ASSEMBLY FOR CARTRIDGE 105MM HEAT-T M456A1E1 PARTS FOR ASSEMBLY AND PACKING《M456A1E1式105 mm口径破甲弹弹药筒用LUCKY牌弹头和绝缘子组件用部件的填装 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-N-48153-1974 NOSE LUCKY AND INSULATOR ASSEMBLY FOR CARTRIDGE 105MM HEAT-T M456A1E1 PARTS FOR ASSEMBLY AND PACKING《M456A1E1式105 mm口径破甲弹弹药筒用LUCKY牌弹头和绝缘子组件用部件的填装 组装和包装》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-N-q153 13 m 9777706 0316737 3 U / 5-37-c=- MIL-N-48153 (PA) 22 January 1974 MILITARY SPECIFICATION NOSE LUCKY AND- INSULATOR ASSEMBLY PARTS FOR, ASSEMBLY AND PACKING FOR CARTRIDGE 105MM, HEAT-T, M456AlEl This specification is approved for use by all Departments and Agencies of the Department .of
2、 Defense. 1. SCOPE 1.1 This specification covers the parts for assembling and packing for one type of Nose Lucky General Specification for Power Source, Piezoid (Lucky) Sampling Procedures and Tables for In- spection by Attributes (ABC-STD-105) Quality Assurance Terms and Definitions. Test Methods f
3、or Electronic and Electrical Component Parts FSC: i315 THIS DOWMENT CONTAINS u PAGES; Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-N-qe353 13 m 7999906 0336738 5 m # MIL-N-48153 (PA) MIL-STD-1168 - . MIL-STD- - MIL-STD-1235 - DRAWINGS ARMY 92
4、56503 - Nose Lot Numbering of Ammunition Packaging, Packing and Marking for Shipment of Inert Ammunition Coriponehts Single and Multilevel Continuous .Sampling Procedures and Tables for Sampling by Attributes. Lucky ,.Gage 102. Outside diameter incorrect.Gage 103. True position of outside diameter i
5、ncorrect.Gage Minor : AQL 1.50 Percent 201. Slot over max. Gage 202. Presence of Flash Visual 203. 204. Evidence of poor workmanship (See 3.7) . .Visua Inside diameter incorrect. . Gage 4.3.2.5 Insulator (see dwg. 8861462) (Inspections to be performed while item is in restrained position). Categorie
6、s Defects Method of Inspection . Critical: None defined. Ma j or : AQL 0.65 percent 101. Outside diameter incorrectGage 102. Thickness of insulator incorrectGage 103. Material defective or damaged . Visual Minor: AQL 1.00 percent 201. Presence of flash .Visual 202. Evidence of poor workmanship (see
7、3.7) .Visual 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-ML-N-qL53 13 M 7797906 03Lb7q5 2 M MIL-N-48153 (PA) 4.3.2.6 Nose Lucky and Insulator Assembly (See dwg; 9256503) Categories Defects Method of Inspection Critical: None defined. Major: AQL
8、 0.40 percent 101. Any component missing, damaged or improperly assembledVisual Minor : AQL 0.65 percent 201. Evidence of poor workmanship (see 3.7) . Visual 4.3.3 Testing 4.3.3.1 Activity test (see 3.4).-Major defect - This test shall be conducted 100 percent. with the applicable requirement shall
9、be classified defective and be removed from the lot. This test shall be performed using contractor designed equipment in accordance with 4.4.1. - Samples shall be submitted and tested in accordance with MIL-STD-105, General Inspection Level II, AQL 0.40%. using contractor designed equipment in accor
10、dance with 4.4.2. Adhesion (see 3.6).-Major defect - Samples selected from each curing batch (see 4.3.1.1) shall be submitted and tested in accordance with MIL-STD-105, General Inspection Level I, AQL 0.40%. equipment in accordance with 4.4.3. required to perform the examinations and tests prescribe
11、d in this section is identified under the “Method of Inspection“ heading. in 4,3.2 and in 4.3.3 (See 6.2). Any assembly which fails to comply 4.3.3.2 Insulator voltage breakdown (see 3.5).-Major defect - This test shall be performed 4.3.3.3 Testing shall be performed using contractor designed 4.3.4
12、Inspection Equipment,-The inspection equipment 4.4 Test Methods and Procedures 4.4.1 Activity Test .-Using equipment specified in 4.3.4, the output activity of the nose lucky assembly must comply with the applicable requirement. An impact load shall be applied to the face of the lucky. nose lucky as
13、sembly. The test method used shall not damage the 9 . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-N-+8153 13 W 979790b 0316746 4 m s MIL-N-48153 (PA) 4.4.2 Insulator voltage breakdown.-The insulator shall be subjected to 2000 volts DC minimu
14、m, applied to the inside and outside faces. The test shall be performed in accordance with Method 301 of MIL-STD-202, with visual observation for voltage breakdown (see 6.4). The equipment for this test shall be in accordance with 4.3.4. Adhesion.-The nose lucky assembly shall be mounted firmly by t
15、he plug component in a suitable fixture and a 14 to 15 lb shear load applied to the plunger immediately adjacent to the adjacent to the plug flange. The equipment for this test shall be in accordande with 4.3.4. 4.4.3 I plunger flange. The mounting shall provide support immediately 5. PREPARATION FO
16、R DELIVERY 5.1 Packing and marking 5.1.1 Level C.-Packing and marking shall be in 6. NOTES accordance with Standard MIL-STD-1169. 6.1 Ordering data.-Procurement documents shall specify the following: a. Title, number and date of this specification. b. Data Cards - Data cards shall be prepared for ea
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILN481531974NOSELUCKYANDINSULATORASSEMBLYFORCARTRIDGE105MMHEATTM456A1E1PARTSFORASSEMBLYANDPACKINGM456A1E1

链接地址:http://www.mydoc123.com/p-446013.html