ARMY MIL-M-63375-1981 MOTOR-DETONATOR ASSEMBLY ROCKET INERT FOR DEMOLITION KIT CRATERING TRAINING XM270 LOADING ASSEMBLING AND PACKING《XM270型训练用磨顶槽拆卸工具包和惰性火箭弹电动机-雷管的装配 装载 组装和包装》.pdf
《ARMY MIL-M-63375-1981 MOTOR-DETONATOR ASSEMBLY ROCKET INERT FOR DEMOLITION KIT CRATERING TRAINING XM270 LOADING ASSEMBLING AND PACKING《XM270型训练用磨顶槽拆卸工具包和惰性火箭弹电动机-雷管的装配 装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-M-63375-1981 MOTOR-DETONATOR ASSEMBLY ROCKET INERT FOR DEMOLITION KIT CRATERING TRAINING XM270 LOADING ASSEMBLING AND PACKING《XM270型训练用磨顶槽拆卸工具包和惰性火箭弹电动机-雷管的装配 装载 组装和包装》.pdf(19页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-M-63375 13 m 7777906 03q7254 5 m 3 - 37-1 9 MIL-M-63375(AR) 16 MARCH 1981 MILITARY SPECIFICATION MOTOR-DETONATOR ASSEMBLY , ROCKET , INERT FOR DEMOLITION KIT, CRATERING, TRAINING, XM270, LOADING, ASSEMBLING AND PACKING This specification is approved for use by US Army Armament Research and Devel
2、opment Command and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers the loading, assembling and packing for one type of Motor-detonator assembly designated as Motor-detonator Assembly, Rocket, Inert for Demolition Kit, Craterin
3、g, Training, XM270. 2. APPLICABLE DOCUMENTS 2.1 Issues of documents. The following documents of the issue in effect on date of invitation for bids, or request for proposals, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A-48078 - Amnunition, Standard Q
4、uality Assurance Provisions, General Specification For STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-1188- Commercial Packaging of Supplies and Equipment Inspection by Attributes FSC 1375 Provided by IHSNot for ResaleNo reproduction or networking permitted without licen
5、se from IHS-,-,-MIL-M-63375 13 706 03Li7255 7 d MIL-M-63375 (AR) DRAWINGS (See 6.5) U.S. ARMY RESEARCH AND DEVELOPMENT COMMAND 9331232 - Box, Packing, Wood, Nailed 9331651 - Rocket Motor Detonator Assembly (Inert) 9332620 - Packing and Marking for Box, Packing, Wood Nailed, for Demolition Kit, Crate
6、ring, Training, XM270 (inert) (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the Contracting Officer). 3. REQUIREMENTS 3.1 Material. Materials and
7、 parts shall be in accordance with applicable drawings and specifications. 3.2 Components, sub-assemblies and assemblies. The components, sub-assemblies and assemblies shall comply with all requirements specified on Dwg. 9331651 and associated drawings, and with all requirements specified in applica
8、ble specifications and standards. 3.3 First article Inspection. This specification contains technical provisions for first article inspection. the submission of first article samples by the contractor shall be as specified in the contract. Requirements for 3.4 Workmanship. All parts, sub-assemblies
9、and assemblies shall be free of burrs, chips, sharp edges, cracks, surface defects, dirt, grease, rust, scales, corrosion and other foreign matter. The cleaning method used shall not be detrimental to any of the parts nor shall the parts be contaminated by the cleaning agent. All required markings s
10、hall be neat and sharply defined. coatings shall be continuous except for a few light scratches which do not expose base material. components, sub-assemblies and assemblies shall be restored when such paintings and coatings have been marred or obliterated. Surface Paintings and coatings on all 4. QU
11、ALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and. standard quality assurance provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part: of this detail specification. 2 Provided by IHSNot for ResaleNo reprodu
12、ction or networking permitted without license from IHS-,-,-MIL-M-63375 13 7797706 0347256 7 MIL-M-63 3 7 5 (.AR 4.2 Classification of inspections. The following types of inspection shall be conducted on this item: a. First Article Inspection be Quality Conformance Inspection 4.3 - First - article in
13、spection 4.3.1 Submission. The contractor shall submit a first article sample designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2, consist of the following items in.sample quantities as indicated below: The first article sample shall . Part Description Drawing
14、 Quantity Rocket Motor Detonator Assembly (Inert) 9331651 10 Detonator Assembly (Inert) 9331653 10 Rocket Motor Assembly (Inert) 9331652 10 Clamp Conduit 9244410 10 4.3,2 Inspections to be performed. See MIL-A-48078 and Table I specified herein. 4.3.3 Rejection. See MIL-A-48078. 3: Provided by IHSNo
15、t for ResaleNo reproduction or networking permitted without license from IHS-,-,-I I l l 1 I I r Y c MIL-M-63375 13 7777706 0347257 O d d B l-l I ._ n U k H 2 U h rl P B a, 01 4 b O U m u al P b O U C z Y “ -. : c d rl N b . 5 O 4 . c! ? .5 . r! N m m r! m N m I I I I O 4 O 4 O FI 8 rn 4 rn 4 Provid
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILM633751981MOTORDETONATORASSEMBLYROCKETINERTFORDEMOLITIONKITCRATERINGTRAININGXM270LOADINGASSEMBLINGANDPACKINGXM270

链接地址:http://www.mydoc123.com/p-445920.html