ARMY MIL-M-48183 B-1992 MUNITION FOR PROJECTILE 155MM M692 M731 DELAY DETONATOR FOR《延迟雷管用M692 M731型155MM弹药发射》.pdf
《ARMY MIL-M-48183 B-1992 MUNITION FOR PROJECTILE 155MM M692 M731 DELAY DETONATOR FOR《延迟雷管用M692 M731型155MM弹药发射》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-M-48183 B-1992 MUNITION FOR PROJECTILE 155MM M692 M731 DELAY DETONATOR FOR《延迟雷管用M692 M731型155MM弹药发射》.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、2. (4 MIL-il-48183B 13 9999906 1210125 323 INCH-POIJNND 1 MIL-M-48183B (AR) 24 September 1992 SUPERSEDING MIL-M-48183A (AR) 4 November 1977 MILITARY SPECIFICATION MUNITION FOR PROJECTILE, 155MM, M692/M731, DELAY DETONATOR FOR This specification is approved for use by the u.S. Army Armament, Munition
2、s and Chemical Command, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification contains requirements not normally covered by the drawings, and provides quality assurance provisions for the fabrication of parts, loading, assemblin
3、g and packing for one type of Delay Detonator for the munition used in Projectiles, 155MM, M692/M731. (See 6.1) 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specification, standards and handbooks. The following specifications, standards, and handbooks form a part of this document to the e
4、xtent specified herein. Unless otherwise specified, the issues of these documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DODISS) and supplement thereto, cited in the solicitation. (See 6.2) SPEC1 FICATIONS MI LI TARY MIL-A-48078 - Ammunition
5、, Standard Quality Assurance Provisions, General Specification For Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document, should be addressed to: Commander U.S. Army ARDEC, ATTN: SNCAR-BAC-S, Picatinny Arsenal, New Jersey 07
6、806-5000 by using the self-addressed Standardization Document Improvement Proposal (DD Fonn 1426) appearing at the end of this document or by letter. 1375 AMSC NIA STATE MEYT distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-
7、flIL-l-98L83B 13 m 9999906 L2LOL2b 2bT m MIL-M-48183B (Aii) STANDARDS MIL-STD-286- Propellants, Solid: Sampling , Examination YIL-STD-650- Explosive: Sampling, Inspection and Testing and Testing (rJnless otherwise indicated, copies of Eederal and military specifications, standards, and handbooks are
8、 available from the Standardization Documents Order Desk, ldg. 4D, 700 Robbins Avenue, Philadelphia, PA 19111-5094). 2.1.2 Other Government documents, drawings and publications. The following other Government documents, drawings, and publications form a part of this document to the extent specified
9、herein. Unless otherwise specified, the issues are those in cited in the solicitation. DRAWINGS (See 6.4) U.S. ARMY ARMAMENT RESEARCFI, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) 9298409- Cord, Detonating 9298429- Delay Detonator 9298433- Propellant Nut Assembly 9298699- Functioning Test Configurati
10、on for Delay Detonator 9321509- Packing and Marking for ox, Inner 9321511- Packing and Marking for BOX, Outer 9321513- Packing and Marking for BOX, Packing PU BL IC AT I ON S CODE OF FEDERAL REGULATIONS Title 49 - Transportation, Parts 100-199 (Copies of drawings, publications, and other Government
11、documents required by contractors in connection with specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer.) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-e- MIL-M-48183B 13 rn 9
12、999906 1210127 1Tb rn MIL-M-48 3. REQUIREMENTS 83B (AR 3.1 Material. Materials and parts shall be in accordance with the applicable drawings and speciEications. 3.2 Delay detonator. The delay detonator shall comply with all requirements specified on dwg. 9298429, all associated drawings, and with al
13、l requirements specified in applicable specification. 3.3 Temperature conditioning and function. The Delay Detonator when ternDD t 5*F or 125 + 5OF shali function within the delay time specified on 9298427. 3.4 First article inspection. When specified in the contract or purchase order (see 6.21, a s
14、ample shall be subjected to first article inspection in accordance with the technical provisions herein (see 4.3). 3.5 Workmanship. 3.S.l Workmanship - stem. The stem shall be free of dirt, grease, chips, gouges, cracks and any other defects which would make the item unsuitable or the intended use.
15、Any cleaning method used shall not be injurious to any of the parts, nor shall the parts be contaminated. 3.5.2 Workmanship - delay detonator. The delay detonator shall be loaded in a thorouqh, workmanlike manner and shall be free o chips, dirt, grease, and other foreign matter that may impair prope
16、r f u nc t io ni ng . 4 QUALITY ASSURANCE PROVISIONS. 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the contractor is responsible for the performance of all inspection requirements (examinations and tests) as specified herein. Except as otherwise sp
17、ecified in the contract or purchase order, the contractor may use his own or any other facilities suitable or the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perform any of the inspections set forth in the sp
18、ecification where such inspections are deemed necessary to ensure supplies and services conform to prescribed requ i rement s. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-BIIB 13 m 9999906 LZL0128 032 MIL-M-48183B (AR) 4.1.1 Responsibilit
19、y for compliance. All items must meet all requirements of sections 3 and 5. The inspection set forth in this sp asterisks indicates one hundred percent inspection. If sample size exceeds lot size, perform one hundred percent inspection. Accept on zero and reject on one or more for all inspection lev
20、els. b. Alternative quality conformance provisions. Alternative quality conformance procedures, methods, or equipment, such as statistical process control, tool control, other types of sampling procedures, etc., may be used by the contractor when they provide as a minimum, the level of quality assur
21、ance required by the provisions specified herein. Prior to applying such alternative procedures, methods, or equipment, the contractor shall describe them in a written proposal submitted to the Government for evaluation (see 6.3). When required, the contractor shall demonstrate that the effectivenes
22、s of each proposed alternative is equal to or better than the specified quality assurance provisions herein. In cases of dispute as to whether the contractors proposed alternative provides equivalent assurance, the provisions of this specification shall apply. All approved alternative provisions sha
23、ll be specifically incorporated into the contractors quality program or detailed inspection system, as applicable. 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-M-48L83B 13 W 99999Ob II210132 5b3 h p: 4 v m m al r-l Co -F I G I cl H 6, c, O z
24、 a, uu O0 zz . NN N NCJNN NN N N N mmmm mm m m m mm m HHHH HH H H H 33 3 HHHH HH H H H HH H 5 a, c .d w a, a a, r: O z a, m r: a rl Cu -% LJ c a, a, ka a um n ro a,Li ua, coo da, GE m N .d a-a c ri ,I “I 1 8 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IH
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILM48183B1992MUNITIONFORPROJECTILE155MMM692M731DELAYDETONATORFOR 延迟 雷管 M692M731 155 MM 弹药 发射 PDF

链接地址:http://www.mydoc123.com/p-445774.html