ARMY MIL-M-46309B-1969 MOUNT TELESCOPE M138.pdf
《ARMY MIL-M-46309B-1969 MOUNT TELESCOPE M138.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-M-46309B-1969 MOUNT TELESCOPE M138.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、f-+P - MIL-M-4b309B 12 H 7797706 0310725 7 H - MILiM-4a309Kim) 2 September i965 S UPEIISEDI EG MIL-M-46309A (MU) 5 December 1961 MILITARY SPECIFICATION MOUNT, TELESCOPE: Mi38 1. SCOPE 1.1 This specification covers performance requirements, quality assurance provisions, and packaging data relative to
2、 a telescope mount designed primarily to provide adjustments in elevation and azimuth for direct fire (see 6.1). 2. APPLICABLE DOCUMENTS 2.1 The following documents, of the issue in effect on date of invitation for bids or request for proposal, form a part of this specifi- cation to the extent speci
3、fied herein: SPECIFICATIONS Military MIL-F- 13926 Fire Control Materiel: General Specification Governing the Manufacture and Inspection of MIL-P-14232 MIL-1-45607 Inspection Equipment, Supply and Parts, Equipment and Tools for Army Materiel, Packaging and Packing of ._ - Maintenance of STANDARDS Mil
4、 it ary MIL-STD- 105 MIL-STD-109 MIL-STD- 202 Sampling Procedures and Tables for Quality Assurance Terms and Definitions Test Methods for Electronic and Inspection by Attributes Electrical Component Parts DRAWINGS U.S. Amy, Frankford Arsenal F85 87500 Mount, Telescope: M138 FSC 1240 Provided by IHSN
5、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-.- PACKAGING DAT? SHEET W- 8587500 Packaging of Mount, Telescope: M138 (Copies of specifications, standards, drawings, and packaging data sheets required by suppliers in connection with specific procurement functions s
6、hould be obtained from the procuring activity or as directed by the con- tracting officer.) 3.1 Fabrication.- The mount shall be manufactured in accordance with Drawing F8587500 and drawings pertaining thereto. 3.2 General specification.- The contractor shall be responsible for adherence to the foll
7、owing requirements of MIL-F-13926: (a) Order of precedence (b) Protective finished surfaces (c) Special accuracy (d) Finish, painting and protective (e) Electrical (E) Part identification and marking (g) Workmanship 3.3 Environmental, 3.3.1 Operating temperatures.- The mount shall meet the applicabl
8、e requirements of 3.4.3 while exposed and thermally stabilized at ambient temperatures of plus 150 degrees and minus 40 degrees Fahrenheit (F) subsequent to which the mount shall meet the requirements of 3.3.2. 3.3.2 Vibration.- with the mount in the normal operating position, it shall be vibrated i
9、n a vertical plane at a constant frequency of 30 cycles per second with an amplitude of 1/16 inch (1/8 inch maximum excursion) for a period of 5 minutes plus or minus 15 seconds. the mount shall show no evidence of loose or damaged parts and the mount shall meet the requirements of 3.3.3 to 3.5 incl
10、usive. Subsequent to vibration, 3.3.3 Sealing.- of the rain test of MIL-F-13926. The mount shall meet the requirements of Procedure I 3.4 Performance. 3.4.1 Orientation.- The mount shall be positioned as follows: (a) (b) The flat mounting surfaces of mount in a horizontal plane. The axis of the tele
11、scope socket parallel to the flat mount- ing surface and parallel to the plane of the centers of the two mounting bolt holes on the left side of the mount. 2 . - Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I MIL-M-6307B 32 77777Ob 0330727 O W MIL
12、-M-46309B(MU) 3.4.2 Locks. (a) The telescope locking device shall lock and securely hold a 1.375 minus 0.001 inch diameter surface representative of the telescope (see Figure 1). (b) A torque of 4 pound-inches applied to the azimuth eccentric Plug 8587407 shall not change the azimuth alignment of th
13、e mount after the eccentric locking screw has been tightened with a torque of 15 & 1 pound- inche s. (c) A torque of 5 pound inches applied to the elevation adjust- ment screw shall not change the elevation alignment of the mount. 3.4.3 Movement. 3.4.3.1 Deflection.- Rotation of the deflection (azim
14、uth) eccentric Plug 8587407 shall move the adapter at least 12 mils to the right and 12 mils to the left from the position established in 3.4.1. 3.4.3.2 Elevation.- Rotation of the elevation adjustment screw shall move the telescope socket at least 25 degrees (444.45 mils) above and 25 degrees (444.
15、45 mils) below the position established in 3.4.1. 3.4.4 Torque.- With boresight locks released, the running torque required to rotate the adjustment screw for elevation and deflection adjust- ment shall not exceed 5 pound-inches at standard ambient temperature (plus 60 degrees to 90 degrees F). cord
16、ed at standard ambient temperature by more than 5 pound-inches when subjected to extreme temperature of 3.3.1. at extreme temperatures. The torque shall not exceed the values re- The rheostat shall be operable 3.4.5 Instrument light.- The instrument light shall be checked for functional operatton an
17、d illumination when the contacts of the mount are energized with 24 Vdc. knob is actuated. Intensity of the lamp shall vary when the rheostat 3.5 Electrical. 3.5.1 Insulation resistance.- Insulation resistance shall not be less than 10 megohms with a potential of 100 volts direct current applied. 3.
18、5.2 Continuity.- The continuity of the wiring shall be checked for conformance with the applicable wiring and continuity drawing requirements. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.- Unless otherwise specified in the contract or purchase order, the supplier is responsible
19、 for the per- formance of all inspection requirements as specified herein. Except as otherwise specified, the supplier may utilize his own facilities or any 3 . _- ,A Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-NIL-N-63078 12 7977706 031072 2 W M
20、IL-M-46309B (MU) other facilities suitable for the performance of the inspection require- ments specified herein, unless disapproved by the Government. The Govern- ment reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to
21、assure supplies and services confofm to prescribed requirements, . 4.1.1 General provisions.- The component and subassembly inspection requirements of mL-F-13926 form a part of the Quality Assurance Provisions of this specification. Definitions of inspection terms shall be as listed in MIL-STD-109.
22、4.2 First article (initial production) approval. - The requirement for first article approval and the responsibility (Government or contractor) for first article testing shall be as specified in the contract. The sample for first article approval tests shall consist of three (3) mounts and three (3)
23、 each of every component and subassembly covered by SQAP. The sample shall be manufactured in the same manner, using the same materials, equipment, processes, and procedures as used in regular production. All parts and materials, including packaging and packing, shall be obtained from the same sourc
24、e of supply as used in regular production. 4.2.1 Government testing.- When the Government is responsible for conducting first article approval tests, the contractor, prior to sub- mitting the sample to the Government, shall inspect the sample to insure that it conforms to all the requirements of the
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILM46309B1969MOUNTTELESCOPEM138PDF
