ARMY MIL-M-13693 A (1)-1963 MINE APERS NM M14E1 WITH INTEGRAL FUZE LOADING ASSEMBLING AND PACKING《M14E1型杀伤地雷海哩整个导火线的装配 组装及包装》.pdf
《ARMY MIL-M-13693 A (1)-1963 MINE APERS NM M14E1 WITH INTEGRAL FUZE LOADING ASSEMBLING AND PACKING《M14E1型杀伤地雷海哩整个导火线的装配 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-M-13693 A (1)-1963 MINE APERS NM M14E1 WITH INTEGRAL FUZE LOADING ASSEMBLING AND PACKING《M14E1型杀伤地雷海哩整个导火线的装配 组装及包装》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 inspection of item at overhaul, general maintenance of equipment, construction, survey and when- ever inspection equipment drawings are 43.4.2 Suppt9 and maintenance. Supply and maintenance of the equipment listed on the IEL shall be in accordance with Specifica- tion MIG1-46607. 4.3.43 Goum- we of
2、 tmhwtors inspecw a ORDM-608-12. CDCF - Contractors design responsi- bility on contractor format. OD - Ordnance design. ODMU - Ordnance design, mandatory CE . -Commercial equipment. : SCD. -Specification Control Draw- for use . ing. I Provided by IHSNot for ResaleNo reproduction or networking permit
3、ted without license from IHS-,-,-6.3.3 Ordnance desigw. Ordnance designs ase reieckd on detailed drawings which completely depict ali the information neces- sary for the fabrication of the item of inspec- tion e3pment The contractor need pro- vide no design when an Ordnance design is listed for an i
4、tem of inspection equipment, Ordnance designe fall into two basic classifi- cations; mandatory and nonmandatory. ings. When an inspection equipment list ref- erences mandatory Ordnance designs, the contractor shall comply with, and use these designs accordingly. The contractor may, however, in conne
5、ction with nonmandatory designs and with the approval of the Govern- ment, design alternate inspection equipment or use comparable commercial equipment to facilitate his operations. Such contractor pre- pared designs or commercial equipment selec- tions must be approved by the Government prior to fa
6、brication or procuring of the equip ment. Designs shall be submitted for ap- proval as specified in 6.3.7. 6.3.4 Specificatm control drawings. Spec- ification control rawings depict the mini- mum equipment requirements in outline, de- scriptive, diagrammatic, or pictorial form only and specify the r
7、equired performance or other characteristics. Contractors must pre- pare detailed drawings (see 6.3.6) of their designs in support of specification control drawings. These contractor prepared de- signs must be approved by the Government prior to the fabrication or procuring of the equipment. Commerc
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILM13693A11963MINEAPERSNMM14E1WITHINTEGRALFUZELOADINGASSEMBLINGANDPACKINGM14E1 杀伤 地雷 海哩 整个 导火线 装配

链接地址:http://www.mydoc123.com/p-445686.html