ARMY MIL-L-48288-1974 LEAD ASSEMBLY (FOR MINE M56 SUBSYSTEM) PARTS FOR AND LOADING ASSEMBLING AND PACKING《铅组装配零件(用于M56地雷系统)的装卸 组装及包装》.pdf
《ARMY MIL-L-48288-1974 LEAD ASSEMBLY (FOR MINE M56 SUBSYSTEM) PARTS FOR AND LOADING ASSEMBLING AND PACKING《铅组装配零件(用于M56地雷系统)的装卸 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-L-48288-1974 LEAD ASSEMBLY (FOR MINE M56 SUBSYSTEM) PARTS FOR AND LOADING ASSEMBLING AND PACKING《铅组装配零件(用于M56地雷系统)的装卸 组装及包装》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、, MIL-L-48288 13 7979906 0318483 8 m 5 -3 7- d3 ru-L-48288 (PA) 16 January i974 hIILITARY SPECIFICATION LEAD ASSET4BLY (FOR MINE, Pi56 SUBSYSTZP7) PARTS FOR, AND LOADING, ASSC!IBI,ING ArlTI PACI;I:JG This Specification is not approved for use by all Departments and Agencies of the Department of Defe
2、nse. 1. SCOPE 1.1 This specification covers the inspection of the parts and the loading, assembling and packing of one type of lead assenbly designated as Lead Rssernbly (for Tline, Y56 SubSystem) . 2 . APPLICABLE DOCUivEI?TS 2.1 The following documents of the issue in effect on date of invitation f
3、or bids or request for proposal, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-P-116 - Preservation, I?etho of NIL-R-398 - RDX MIL-A-2550 - Ammunition, General Specification for STANDARDS MILITARY MIL-STD-105 MIL-STD-109 MIL-STD-331 - Sampling Procedus
4、es and Tables for Inspection by Attributes (ABC-STD-lO5) - Quality Assurance Terms and Definitions - Fuze and Fuze Components, Environmental and Performance Tests fGr - HIS DOCUMENT CONTAINS kf PAGES. O Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,
5、-MIL-L-48288 13 M 7qqb 0318484 T fl MIL-L-48288 (PA) MIL-STD-414 - Sampling Procedures and Tables for MIL-STD-650 - Explosives; Sampling, Inspection and MIL-STD-I168 MIL-STD-1235 - Single and Multilevel Continuous Inspection by Variables for Percent Defective Testing - Lot Numbering of Ammunition Sa
6、mpling Procedures and Tables for Inspection by Attributes DRAWINGS U. S. ARMY PICATINNY ARSENAL PRODUCT AND PACKAGING DRAWINGS 7548103 - Box, Set-up, Packing, Ammunition, Outer 7548104 - Box, Set-up, Packing, Ammunition, Inner 9204229 - Box, Packing, Ammunition 9287609 - Lead Assembly INSPECTION EQU
7、IPMENT DRAWINGS 9278644 - Firing Assembly and Details (Copies of specifications, standards, and drawings required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the Contracting Officer), 3. REQUIREMENTS 3.1 Material. -
8、Materials shall be in accordance with the applicable drawings and specifications. 3.2 Lead Assembly. - The lead assembly shall comply with all requirements .specified on Drawing 9287609 and with all re- quirements specified in the applicable specifications. 3.3 Moisture Content. - The moisture conte
9、nt of the RDX composition at the time and site of loading shall not exceed 0.20 percent when measured as specified in test method 101.5 of MIL-STD-650. b Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-, - MIL-L-48288 13 9999906 0328485 2 = 3.4 Funct
10、ioning. - The Lead !.sscmbly sinall be capable of high order initiation by a T20E1 Electric Petonator across a minimum air gap of 0.150 inches. ?-Tirh order detonation will be evidenced by a depression of a minirnum depth of 0.0135 inches in the steel witness block specified in test 301.1 of r!IL-S?
11、D-?l. 3.5 Workmanship. - All parts and assemblies shall be fabricated, loaded and asseEiblcd in a thorough worhanlike manner. They shall be free of burrs, sharp edges, cracI:s, dirt grease, rust and other foreign niatter. The cleaning method used shall not De injurious to any part, nor shall t?ie pa
12、rts be con- taminated by the cleaning agents. Exterior surface coatincs shal be continuous except for a few liz-it scratchc; not exposing base material. All required mnrkinr;s shall !e neat and. sharply defined. 3.6 First Article Inspection. - Th1.s specification contains technical provisions for fi
13、rst article inspection. T?equircnents for the submission of first article samples by the contractor shall be as specified in the contract. 4. QUALITY ASSURA3CE PROKSIOiJS 4.1 Responsibility for Inspection.-%less otherwise specified in the contract or purchase order, the supplier is responsible for t
14、he performance of all inspection requirements as specified herein. Except as othervise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection re- quirements specified herein, unless disapproved by the Govern- ment. The
15、Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and ser- vices conform to prescribed requirements. Seference shall be made to MIL-STD-109 to define terms used herein. The nrovi- sions of NIL
16、-A-2550 shall apply. Submission of Product.-At the tiine ezch completed lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor s3fiall sug.i-ily the fol- lowing information accompanied by a certif3cat.e which attests that the information provided is
17、 correct and applicable to the product being submitted. 4.1.1 a. A statement that the lot complies w5t.h all of- the quality assurance provisions specified in this specification. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-L-48288 (PA) with i
18、dentification and date of changes thereto. C. A statement that all. material purchased Dy the con- tractor meets requirements, when sirch material is controlled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file
19、 and available for review. d. ?lumber of items in the lot. e. Date submitted. The certificate shall be signed by a responsible agent of the certifying organization. The initial cert.i f i cate submitted shall be substantiated 57 evidence of the agent c authority to bind his principal. Substantiation
20、 of the agents authority will not be required wlth subsequent certificates unless, dur- ing the course of the contract, this atlthority is ested. in another agent of the certifyinc organization. 4.2 First Article Inspection 4.2.1 Subaission.-Prior to the start of regular production the contractor sh
21、all subnit a first article sample (see 6.1) to a Government approved facility as esig:nated by the contracting officer for evaluation in accordance with the provisions of 4.2.2 and 4.2.3, The first article sample shall consist of 150 loaded lead assemblies, 10 loaded lead assemblies (prior to insert
22、ion of closure disc and crimping), and 50 conpletc sets of parts (50 each of every component) which have been produced by the contractor or furnished by a supplier an which have been manufactured using the same production processes, procedures and equlpnent which will be used in fulfilling the contr
23、act. All parts and materials in- cluding packaging and packing shall Se obtained from the same source of supply as will be used in regular production. Prior to sub- mission, the contractor shall inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract
24、 and submit a record of this inspection with the sample, including a certificate of conformance for materials. A sample containing known defects will not be submitted unless specifi- cally authorized by the Contracting Officer. A first article sample, or portion thereof, as directed b27 the Contract
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILL482881974LEADASSEMBLYFORMINEM56SUBSYSTEMPARTSFORANDLOADINGASSEMBLINGANDPACKING 组装 零件 用于 M56 地雷

链接地址:http://www.mydoc123.com/p-445587.html