ARMY MIL-I-70534-1985 IGNITER ELECTRIC MATCH PARTS FOR AND LOADING ASSEMBLING AND PACKING《电动点火器零件的装卸 组装及包装》.pdf
《ARMY MIL-I-70534-1985 IGNITER ELECTRIC MATCH PARTS FOR AND LOADING ASSEMBLING AND PACKING《电动点火器零件的装卸 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-I-70534-1985 IGNITER ELECTRIC MATCH PARTS FOR AND LOADING ASSEMBLING AND PACKING《电动点火器零件的装卸 组装及包装》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-1-70534 13 W 777770b 0355587 7 1. SCOPE MIL-1-70534 (AR) 27 SEPTEMBER 1985 MILITARY SPECIFICATION IGNITER, ELECTRIC MATCH PARTS FOR AND LOADING, ASSEMBLING AND PACKING This specification is approved for use by the US Army Armament, Munitions and Chemical Command, and is available for use by all
2、Departments and Agencies of the Department of Defense. 1.1 .covered for the for one Scope. This specification contains requirements not by the drawings and provides quality assurance provisions fabrication of parts for and loading, assembling and packing type of device designated as Igniter, Electri
3、c Match, 2. APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. Unless otherwise specified (see 6.2), the following specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifi- cations and Standards (DoDISS) specified in
4、 the solicitation, form a part of this specification to the extent specified herein. SPEC I FICATI ONS MILITARY MIL-P-116 - Preservation - Packaging, Methods of MIL-P-223 - Black Powder MIL-A-48078 - Ammunition, Standard Quality Assurance Provisions, General Specification For STANDARDS MILITARY MIL-
5、STD-105 - Sampling Procedures and Tables for Inspection by Attributes Beneficial eomments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander. US I Army Armament Research and- Development Center, Attn: AMSMC-
6、QA. Dover, New I Jersey 07801-5001 by using the self-addressed Standardization DocumntImprovment Propasal (DD Form 1426) appearing at the end of this document or by letter. FSC 1370 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. / THIS DOCUMENT CONTAINS PAGES _ - P
7、rovided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-i 1 MIL-1-70534 (AR) MIL-STD-3 31 - Fuze and Fuze Components, Environmental M IL-STD- 81 O - Environmental Test Methods. MIL-STD-1234 - Pyrotechnics, Sampling, Inspection and Testing. and Performance Tes
8、t For. 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this specification to the extent specified herein. DRAWINGS US ARMY ABMAMENT RESEARCH AND DEVELOPMENT CENTER (ARDC) PRODUCT AND PACKAGING DRAWINGS
9、9390399 - Igniter, Electric Match Assembly 9392395 - Packing and Marking for Box, Fiberboard, 9392394 - Packing and Marking for Box, Outer (Copies of specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition functions should be
10、 obtained from the contracting activity or as directed by the contracting officer). For Igniter, Electric Match Assembly For Igniter, Electric Match Assembly 2.1.3 Order of precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this
11、 specification shall take precedence. 3. REQUIREMENTS 3.1 Materials. Materials and parts shall be in accordance with applicable drawings, specifications and standards. 3.2 Assembly. The igniter, electric match assembly shall comply with all requirements specified on Drawing (dwg.) 9390399, and all a
12、ssociated drawings, and with all requirements specified in applicable specifications and standards. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-1-70534 13 7797706 0355587 O MIL-1-70534 (AR) 3.2.1 Item definition. This item consists of an el
13、ectric squib/match charge to be used for igniting a standard a 155MM (HC) Hexachloroethane Smoke Canister- 3.3 Moisture content. 3.3.1 Paper and paper products. The moisture content of the paper and paper products components of the igniter, electric match assembly at the loading station at the time
14、f loading shall not exceed 6.0 percent. 3.4 Functioning (Ambient temperature, 21 + 3OC, 70 2 50F, Hot 51.5 + 3oC, 125 + 50F, Cold -32 f 3OC, -25-+ 5OF). The assembly Shall functTon and comply wzth the following requirements after conditioning at specified temperature. 3.4.1 Performance. The igniter,
15、 electric match shall function with a soft ignition and burn for a duration of 19+5 seconds producing a high energy flame capable of igniting 2 155MM HC Smoke Canister . 3.4.2 Functioning time. The time from application of twenty-four (24) plus or minus (2) two (2) Volts Direct Current (VDC), with m
16、inimum ignition current of 3.0 milliwatt seconds/ohm, to initiation of the assembly shall not be greater than 0.20 seconds. 3.5 Environmental conditions. 3.5.1 Low temperature. The igniters, shall be capable of withstanding low temperature conditions as specified in 4.5.4.1 and shall meet the perfor
17、mance requirements when test fired as specified in 4.5.3. 3.5.2 Hiqh and ambient temperature. The igniters, shall be capable of withstanding high and ambient temperature conditions as specified in 4.5.4.2 and meeting the performance requirements when test fired as specified in 4.5.3. 3.5.3 Leak test
18、. The igniter shall not leak when tested as specified in 4.5.4.3. Leakage shall constitute a failure. 3.5.4 Leakage test. The igniters, when packaged, shall be capable of withstanding exposure to the leakage test as specified in 4.5.4.4 and meeting the performance requirements when test fired. 3 Pro
19、vided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4 MIL-1-70534 13 9999906 0355590 7 MIL-1-70534 (AR) 3.5.5 Jumble. The electric match igniter shall comply with the a. The igniter shall not function during test. b. There shall be no powder leakage. c. The
20、 igniter components shall not separate during test. 3.6 First article inspection. This specification contains technical provisions for firstarticle inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 3.7 WorkmanshiE. All parts
21、 and assemblies shall be fabricated and finished in a thorough, workmanlike manner. They shall be free of burrs, chips, sharp edges, cracks, crazes, porosity, warpage, burn marks, blisters, excess flash, scratches, dirt, grease and other defects and foreign matter which would affect appearance or se
22、rviceability. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agent. All required markings shall be neat, legible and sharply defined. All packing components shall be dry. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspectio
23、n and standard quality following requirements when tested as specified in 4.5.4.5. assurance provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification. 4.2 Classification of inspections. The fol
24、lowing types of inspection shall be conducted on this item: a. First Article Inspection b, Quality Conformance Inspection 4.3 First article inspection 4.3.1 Submission. The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with provi
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILI705341985IGNITERELECTRICMATCHPARTSFORANDLOADINGASSEMBLINGANDPACKING 电动 点火器 零件 装卸 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-445458.html