ARMY MIL-I-60166 (8)-1970 INVERTER POWER STATIC 10516412《10516412静态电源逆变器》.pdf
《ARMY MIL-I-60166 (8)-1970 INVERTER POWER STATIC 10516412《10516412静态电源逆变器》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-I-60166 (8)-1970 INVERTER POWER STATIC 10516412《10516412静态电源逆变器》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、9 .- . MIL-I-bOlbb ( 32 7777706 0336339 b W I MI 1,-T -601 66 (MU) SUPERSELXNG- *E _, %I AMENIIYKNi 8 i I .* 24 lvbruai 1470 AMENDmNT 7 15 July 1969 a .I I .:i I : l-. : MILITARY SPECIFICATION INVERTER, PUXiiR, STATIC: 10516412 This amendment dated 14 May 1964. Paragraph 2.1 : “MIL-I -266 O0 and sub
2、stitute “MIL-STD-46 1 MIL-STD-462 Paragraph 3-1: Paragraph 3.4: forms a .part of Military Specification MIL-I-60166(MU) , CE03 (20 Kqz to 50 MHz), CSO1 (3KHz to 50 Mz), RE02 (14KHz to 1 GHz), RE04 (20 Mz to 50 KHz). Tests are to be performed for broadband interference only. 3.11 Coatinuity.- The out
3、side case shall be constructed in such a manner that it will provida one conductance path between any two points on the case.“ Following paragraph 4.1.1, add paragraphs 4.1.2, 4.1.2.1 and 4.1.2.2. “4.1.2 First article (initial production) approval.- The requirement for first article approval and the
4、 responsibility (Government or contrac- tor) or first article testing shall be as specified in the contract. sample for first article approval tests shall consist of three (3) inver- ters manufactured in the same manner using the same materials, equipment, processes, and procedures as used in regula
5、r production. materials, including packaging and packing, shall be obtained from the same source of supply as used in regular production. The All parts and 4.1.2.1 Governlient testing.- When the Government is responsible for conducting first article approval tests, the contractor, prior to submittin
6、g the sample to the Government, shall inspect the sample to insure that it conforms to all the requirements of the contract and submit a record of this inspection with the sample, including certificates of conformance for materials. 4.1.2.2 Contractor testing. - When the contractor is responsible fo
7、r conducting first article approval tests , the sample shall be inspected and a record of this inspection, including certificates of conformance for materials shall be subrnitted to the Government for approval. The Govern- ment reserves the right to witness the contractors inspection.“ Paragraphs 4.
8、2, 4.2.1, 4.2.1.1, 4.2.1.2: Dzlete in their entirety, * Paragraph 4.3.2. Table I: Delete references to “Enclosure“. Paragraph 4.3.2, Table II: Delete the following: “113. Radio interference 3.10 4.6.11“ and substitute : Page 2 of3 Pages A - Provided by IHSNot for ResaleNo reproduction or networking
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILI6016681970INVERTERPOWERSTATIC1051641210516412 静态 电源 逆变器 PDF

链接地址:http://www.mydoc123.com/p-445442.html