1、MIL-1-12 822C (MU) 10 February i969 SUPERSEDING 18 JUNE i965 ;IITER, ROCKET M3j70R, 26 PARTS AiJD LIOADIIJG, ASSE?XjLING AND PACKING 1. SCOPE 1.1 This specification covrstthe parts and loading, ,assembling and packing for one type of igniter designated as .Igniter, M26, for use in Rocket Motor, -M4.
2、 2. APPLICABLE DOCUMENTS -) -. .- , FSC: 1311OY -: - u -q_. -i -.s-c_ -_ I- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-. %* *. -. KIL- I- 12 82 2c (1.IU) DRAWIXGS XE1-1Y 75481139 - Igniter, 426, Loading Assembly. 7548e33 - Carton, Packing, Ammun
3、ition for Igniter, Rocket Notor, 1.126, Assembly, Details and Packing 7548111 - Box, Packing, Ammunition for Igniter, Roc.Ke5 Kotor, MG, Assembly, Details and Packins PUBLICATIOXS ARMY EtI-7F;48439 - Equipment Tabulation I 1 (Copies of specifications, standards, drawings and publicatioris . . requir
4、ed by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as cirecte6 by the contracting officer,) 3. REQUIREMENTS 3.1 ;:laterial. - RaterTals and parts shall be in accordance 3.2 Igniter. - The igniter shall aomply with.al1 require- with app
5、licable drawings and specifications, ments specified on Drawing (dwg.) 7548439, and with all require- ments specified in applicable specifications. 3 3 Black powder. 3.3.1 Noistwe content. - The moi of the black powder at the loading plant, at the time of loading, shall not excee 0.5 percent;. ticn
6、of the moisture con%nt, shdlil not be exposed to air dur5Eg welgiirig znii loading operations .more than ten minutes total acciirr-u- latec? time. , a. . 3.3.2 Exposure to 2ir*.- Tke black powder, after deterrilina- . 3.4 Functioning 5. 3.4.1 Time. - The igniters shall function innot less thai? 14 s
7、ecor.clrr3 iiezrrts gcups, Iioles a porous areas distortions, 01- c%er ucl,sf:visle charactaristics which would, in any way, det=.act rior shall the parts be contaminated by t cleaning agents. The paintings and coatings on all components hall be restored wiler. -3 fnQ- Au. tlic seakjility of the pro
8、duct for its intended purpose. m- Requirements for the submission of First Article Samples. by th-e contractor shall be. 8s specified in th contract. 4. QUALITY ASSURARC3 PROVISIONS . II-.l. Responsibility for inspection. less othepoll by Government or commercial specificati s referenced in any e; .
9、 Lhe contractual. documents, and that certificates of conformancs nilim-=neoi t+d-r-niement , I -For verification, the i-:? Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-con-bracto shall select at least one (1) random sample of - approxinately one
10、ounce of black powder from the container of power in use for each eight hours of production or fraction thereo: tnat the line cpei-ates. Failure to comply with the applicable requi-enent, shall be cause for rejection of the eight iiouis pxcaction represented by th sample. The test - shall be pelifor
11、md as specified in 4.4.1 4.3.3.2.2 Pull test of delay assemblies (see dwg. 7548442) Major defect - Coe No. 12001. - The pull test shall be conducteci 2.90 percent in the manner specified in 4.4.2. Damage to or extensLon of the parts shall be cause for reject9on.of the assembly. Code No. 96006, - The
12、 vacuum test shall be conducted 100 percent in the manner specified in 4.1i.3, A enib ly exhibiting leakage shall be rejected and remove 4.3.3.2.4 Functioning test (se Code No. 06007. 4.3.3.2.4.1 At 120 degrees F, test shall be in accordance with Standard MIL-STD-414, Section 3, Table B-1, Code lett
13、er K with AQL of 0.65 percent for each limit separately. Duds shall be replaced with additional . Lgniters. The test shall be performed 4.3.3.2.4.2 At O degrees F. - The test shall be as specified in 4.3.3.2.4 4.3.3.2.4.3 Duds, - If no duds ar performance of either, ;or.h-oth, phases of the test, th
14、e lot - may be accepted. If one or two duds are discovered in either, phase., a second sample of 70 igniters shall be selected, to tes for duds only, under the conditions -of the Particular Phase in - . 4.3.3.2.3 Vacuum test-(, dwg. 7598439) - jor defect - . -I _. which the duds occurredt retest, a
15、total of 3 duds xi-thout further test. Q. 3.4 InspectLon Gq ET-7548439 identifies the inspection equipment required to .perform the examinations and tests prescribed -In this section,-. The contractor shal1“design inspectio with the instructions in paragraph 6 4.3.4.1 Government rights to d ecpiimen
16、c rawAinp;s and Lists prpvide witkthe requirements of the ET may ; . -e -/-=-7 .- I - 4 k2 - -=-a -_ .- be packed In a wood box in accordance with -3wg. 7548840. i i . . -. . -. . - - Y“- - -. - -. . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-6.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILI12822C1969IGNITERROCKETMOTORM26PARTSANDLOADINGASSEMBLINGANDPACKINGM26 火箭发动机 点火器 装卸 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-445328.html