ARMY MIL-H-22832 B-1972 HEAT INTERCHANGERS REFRIGERANT-12《致冷剂-12热交换器》.pdf
《ARMY MIL-H-22832 B-1972 HEAT INTERCHANGERS REFRIGERANT-12《致冷剂-12热交换器》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-H-22832 B-1972 HEAT INTERCHANGERS REFRIGERANT-12《致冷剂-12热交换器》.pdf(9页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-H-22832B MIL-H-22832A 22 September 1964 MILITARY SPECIFICATION HEAT INTERCHANGERS, REFRIGERANT 12 This specification is approved for use by all Department and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers commercial, liquid to suction gas heat interchangers
2、 for use with refrigerant 12 (dichlorodifluoromethane) . 1.2 Classification. The heat interchangers shall be of the following sizes as specified (see 6.2): Size 1 2 3 4 5 6 7 8 - Capacity (minimum) Tons of Refrigeration (T.R) 1112 116 114 113 112 3 I4 1 2 2. APPLICABLE DcuMENTS * 2.1 The following d
3、ocuments of the issue in effect on date of invitation for bids or request for proposal, form a part of this specification to the extent specified herein: SPECIFICATIONS FEDERAZ, WW-T-799 - Tube, Copper, Seamless, (For Use With Solder-Joint or Flared-Tube Fittings) . FSC 4130 Provided by IHSNot for R
4、esaleNo reproduction or networking permitted without license from IHS-,-,-_ MIL-H-22 832B PPP-B-566 - Boxes, Folding, Paperboard. PPP-B-621 - Boxes, Wood, Nailed and Lock-Corner. PPP-B-636 - Boxes, Shipping, Fiberboard. PPP-B-676 - Boxes, Set-up, Paperboard. MILITARY MIL-L-10547 - Liners, Case, and
5、Sheet, Overwrap; Water-Vaporproof or Waterproof, Flexible. STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by MIL-STD-129 - Marking for Shipment and Storage. MS 17241 - Heat Interchanger, Refrigerant Type 12. Attribut es. (Copies of specifications and standards require
6、d by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) * 2.2 Other publications, The following documents form a part of this specification to the extent specified herein. Unless a specific issue is i
7、dentified, the issue in effect on date of invitation for bids or request for proposal shall apply: Underwriters Laboratories, Inc. (IL) No. 207 (c) - Ref rigerant-Containing Components (Application for copies should be addressed to the Underwriters Labora- tories, Inc., 207 East Ohio Street, Chicago
8、, Illinois 60611; Walt Whitman Road, Melville, L.I. New York 11749 or,1655 Scott Blvd., Santa Clara, California 95050.) National Motor Freight Traffic Association, Inc., Agent National Motor Freight Classification (Application for copies should be addressed to the American Truckin Associations, Inc.
9、, Tariff Order Section, 1616 P Street, N.W., Washin,:on, D.C. 20036.) 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-H-22832B L(3 W 7779906 0233607 5 MIL-H-22832B Uniform Classification Comittee, Agent Uni f om Freight Ci ass if i cat ion (App
10、lication for copies should be addressed to the Uniform Classification Comittee, Room 1106, 222 South Riverside Plaza, Chicago, Illinois 60606 .) (Technical society and technical association specifications and standards are generally available for reference from libraries. distributed among technical
11、 groups and using Federal agencies.) They are also 3. REQUIREMENTS * 3.1 First article. When specified (see 6.2), the supplier shall furnish a sample for first article inspection and approval (see 4.2, and . 6.3). * 3.2 Standard product. The heat interchangers delivered under this specification shal
12、l be the manufacturers standard comercial product, except for any changes necessary to meet specification requirements. Component parts of the heat interchanger need not be the product of the same manufacturer . 3.3 Codes and standard. Heat interchangers shall conform to the applicable requirements
13、of UL Standard No. 207 (c). * 3.3.1 Certification. Prior to approval of the first article if one is submitted, or prior to comencing production, the supplier shall submit to the contracting officer of his authorized representative satisfactory evidence that the heat interchangers he proposes to furn
14、ish under this specification meet the applicable requirements of UL Standard No. 207 (c). Acceptable evidence of meeting the requirements of this standard shall be the L label, or a UL listing mark certified test report from a recognized independent testing laboratory, indicating that the heat inter
15、changers offered conform to the requirements of UL Standard No. 207 (c). * 3.4 Materials. Materials not definitely specified shall be of the quality normally used by the manufacturer for heat interchangers provided the completed item complies with all provisions of this specification. 3.4.1 Copper.
16、Copper tubing shall conform to type K or L of WW-T-799. 3.5 Deeim and construction. The heat interchangers shall be designed The The liquid and constructed in accordance with MS 17241 and as specified herein. gas circuit shall be arranged to eliminate entrapment of oil. circuit and gas nipples shall
17、 be fabricated of the copper tube specified in 3.4.1. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-H-22832B 3.5.1 Capacity. The heat interchanger shall have the capacities indicated in 1.2 under the conditions specified on MS 17241 (see 4.4.
18、1). * 3.6 Identification marking. The manufacturers name or identifiable trade name, shall be clearly stamped, embossed, or etched on a securely attached corrosion-resistant metal plate. plate, a pressure-sensitive label or waterproofed decalcomania may be used. In addition, the heat interchanger sh
19、all be marked as required by UL Standard No. 207 (c). In lieu of the metal identification 3.7 Finish. The heat interchanger shall have the manufacturers standard comercial finish. burrs, slivers, or splinters. The finished heat interchanger shall not have any sharp * 3.8 Workmanship. The finished pr
20、oduct shall not be fractured, split, punctured, dented, or malformed, adherent and shall not have any pinholes. Soldering shall be complete, clean, and 4. QUALITY ASSURANCE PROVISIONS * 4.1 Responsibility for inspection. Unless otherwise specified in the contract or purchase order, the supplier is r
21、esponsible for the performance of all inspection requirements as specified herein. specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection require- ments specified herein, unless disapproved by the Government. Government
22、 reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Except as otherwise The * 4.2 First article. When a first article is required, it shall be examined for
23、 the defects listed in table I and for dimensions specified herein, and tested as specified in 4.4. Failure of any test shall be cause for rejection of the first article. listed in table I, or any dimension not within specified requirements shall be cause for rejection of the first article. The pres
24、ence of any defects * 4.3 Inspection. Sampling for inspection shall be performed in accordance with MIL-STD-105, except where otherwise indicated hereinafter. * 4.3.1 Component and material inspection, In accordance with 4.1 above, components and materials shall be inspected and tested in accordance
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILH22832B1972HEATINTERCHANGERSREFRIGERANT12 致冷 12 热交换器 PDF

链接地址:http://www.mydoc123.com/p-445036.html