ARMY MIL-G-70477-1985 GRENADES GP M42 AND M46 INERT LOADING ASSEMBLING AND PACKING《GP M42和M46型手榴弹内部装载 组装和包装》.pdf
《ARMY MIL-G-70477-1985 GRENADES GP M42 AND M46 INERT LOADING ASSEMBLING AND PACKING《GP M42和M46型手榴弹内部装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-G-70477-1985 GRENADES GP M42 AND M46 INERT LOADING ASSEMBLING AND PACKING《GP M42和M46型手榴弹内部装载 组装和包装》.pdf(21页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-G-70477 13 W 9999906 0354950 6 C537H d 1! MIL-G-70477 ( 15 February 198 MILI TARY SPE CI FI CAT ION GRENADES, GP: M42 AND M%, INER!i LOADING, ASSEMBLING AND PACKING This specification is approved for: use by the US Army Armament Munitions and Chemical Command, arid is available for use by all D
2、epartments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification contains requirements and provides quality assurance provisions for loading and assembling of two types of grenades designated as Grenades, GP: M42 and Ma, Inert. 2. APPLICABLE DOCIMENTS 2.1 Government docum
3、ents. 2.1.1 Specifications and stadards. Unless otherwise speci- fied, the following specifications and standards of the issue listed in that issue of the Department of Defense Idex of Specifications and Standards (DODISC) specified in the solicitatiai form a part of this specification to the extent
4、 specified herein. SPEC1 FICATIONS MIL IT ARY MIL-A-48078 - Anununi tion, Stardard Quality Assurance Provisions, General Specification For STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables MIL-STD-410 - Nadestructive Testing Personnel MIL-STD-1235 - Single ad Multi-Level Continuous for
5、 Inspection by Attributes Qualification and Certification Sampling Procedures and Tables For Inspection by Attributes FSC 1330 Beneficial comments (recommendations, additions, deletions) and any pertinent daia which may be of use in improving this document should be addressed to: Commander, US Arm A
6、rmament Research and Development Center, Attn. DRSMC-QA, Dover, New Lrsey 07801 by using the self-addressed Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. , f THIS DOCUMENT CONTAINS g/ PAGES Provided by IHSNot for ResaleNo reproductio
7、n or networking permitted without license from IHS-,-,- - MIL-G-70477 13 ,- 9777906 0354351 8 J MIL-G-70477 (AR) 2.1.2 Other Government documents, drawings, and publications . The following other Government documents, drawings and publications form a part of this specification to the extent specifie
8、d herein. DRAWINGS (See 6.6) US ARMY ARMAMENT RESEARCH AND DEVELOPMENT CENTER (ARDC) 9381451 - Grenade, 8: M42, Inert 93 81 454 - Grenade, GP: M46, Inert PRODUCT AND PACKAGING DRAWINGS 9349337 - Packing and Marking for Box Outer for Grenade: M42, M46 and XM77 (Copies of specifications, standards, dr
9、awings, and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer) . 2 2 Other pub1 ications . The following document (s ) f om a -. part of this specification to the extent specif
10、ied herein. The issues of the documents which are indicated as DoD adopted shall be the issue listed in the current DoDISS and the supplement thereto, if applicable. AMERICAN SOCIETY FOR TESTING AND MATERIALS ASTM E 18 - Standard Test Methods for Rockwell Hardness and Rockwell Superf icial Hardness
11、of Metallic Materials (Application for copies should be addressed to: American Society for Testing and Materials, 1916 Race Street, Philadelphia, PA 19103). 2.3 Order of Precedence. In the event of a conflict between the text of this specification and the references cited herein, the text of this sp
12、ecification shall take precedence. 3. REQUIREMENTS 3.1 Material. Materials shall be in accordance with the 3.2 Grenades. The grenades shall comply with all requirements applicable drawings and specifications. specified on DwF 9381451 or 9381454, all associated drawings and with al1 requirements spec
13、ified in applicable specifications. 2 I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-70477 13 W 7797706 0354752 T I MIL-G-70477 (AR) 3.3 Arming test of fuze slide of grenade. The grenade fuze, less safety clip and safety pin, shall have the
14、arming screw rotated, and held out of the slide permitting the slide assembly to move to the armed position. The armed position shall be considered to have occured when the distance from the end of the tunnel of the fuze housing to the crown of the beveled end of the slide assembly measures .410 + .
15、O35 inch. 3.4 Grenade storage. Grenade bodies removed from the barrier bag packaging anm=ed as metal parts or partially or fully loaded assemblies, shall not be subjected to a temperature below t 50OF (see 6.7). 3.5 First article inspection. This specification contains for the submission of first ar
16、ticle samples by the contractor shall be as specified in the contract, I technical provisiKEor first article inspection. Requirements 3.6 Records of results of contractor-conducted examinations and tests. The contractor shall maintain records of the results of all examinations or tests required by t
17、his specification. (See 6.4). loaded ana assembled in a thorough, workmanlike manner, They shall be free of burrs, sharp edges, cracks, dirt, grease, rust and other foreign matter. After loading, all external surfaces, including cavity, shall be free from inert filler. The cleaning method used shall
18、 not be injurious to any parts, nor shall the parts be contaminated by the cleaning agents. Exterior surface coatings shall be continuous; however, a few light scratches not exposing base material may be permitted. All required marking and stamping shall be neat and sharply defined. - 3.7 Workmanshi
19、p. All parts and assemblies shall be fabricated, 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard quality- - assurance provisions. Unless otherwise specified herein or in the contract, the provisions of MIL-A48078 shall apply and are hereby made a part of this detail sp
20、ecification. 4.2 Classification of inspections. The following types of inspection shall be conducted on this item: a. First Article Inspection b. Quality Conformance Inspection 4.3 - First article inspection. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
21、 IHS-,-,-MIL-G-70477 (AR) 4.3.1 Submission. The contractor shall submit a -first article as designated by the Contracting Officer for evaluation in accor- dance with the provisions of 4.3.2. The first article sample shall consist of the following items in sample quantities as indicated. . Part descr
22、iption - Drawinus Inert Grenades 9381451 or 9381454 100 Body Loading Assemblies 9381453 or 9381456 54 Packable Slider Lock 93 29680 30 4.3.2 Inspections I- to be performed. See MIL-A-48078 and Table l herein. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from
23、 IHS-,-,-O t c 5 . i rl 8 d E H h a rl E m a 5 KI a c Id a, a a, k c3 2 c MIL-G-70477 13 7799906 0354754 3 W N cvcv cvcv cv cv(v cv o om om o mo m . 0. *. o * . II II I II o O0 O0 d do O o o O0 O0 VI V) rl rlrl dd 5 I Provided by IHSNot for ResaleNo reproduction or networking permitted without licen
24、se from IHS-,-,-_- - _- MIL-G-70477 13 W 777770b 0354755 5 W MIL-G-70477 (AR) 4.4 Quality conformance inspection. 4.4.1 Inspection lot formation. Inspection lots shall comply with the lot formation provisions of MIL-A-48078. In addition, inspection lots of grenades shall contain: a. Fuzes, M223 of o
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILG704771985GRENADESGPM42ANDM46INERTLOADINGASSEMBLINGANDPACKINGGPM42 M46 手榴弹 内部 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-445019.html