ARMY MIL-G-70464 (1)-1991 GRENADE (GP) LINER FOR《手榴弹(GP)班轮》.pdf
《ARMY MIL-G-70464 (1)-1991 GRENADE (GP) LINER FOR《手榴弹(GP)班轮》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-G-70464 (1)-1991 GRENADE (GP) LINER FOR《手榴弹(GP)班轮》.pdf(4页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-G-70464 (1) 13 9979906 0487b T MIL-G-70464 (AR) AMENDMENT 1 21 August 1991 MILITARY SPECIFICATION GRENADE (GP), LINER FOR This amendment forms a part of Military Specification MIL-G-70464(AR), dated 21 November 1985, and is approved for use by the U.S Army Armament, Munitions and Chemical Comman
2、d and is available for use by all Departments and Agencies of the Department of Defense. PAGE 1 2.1.1 Military Specifications, Add: “MIL-A-70625 - Automated Acceptance Inspection Equipment for Non-Electronic Components, Design, Testing and approval of“ PAGE 6 4.42.1 Delete table in its entirety and
3、substitute new table (see included table) . PAGE 9 4.4.3.2 Add new paragraph. “4.4.3.2 Dimensional control of parts - In place of normal sampling associated with the classification of defects, a AMSC N/A qualification sample of at least ten parts. shall be inspected for verification of dimensional c
4、onformance in order to qualify each machine prior to production and after each production stoppage of more than one hour. qualification, one process sample shall be selected per 600 parts produced and at the end of a shift. Upon 4.4.3.2.1 Qualification of machine - If any defective parts are found d
5、uring qualification of the machine, the machine producing the defective part shall not be used in production. 4.4.3.2.2 Process sample - If any defective part is found when inspectin is performed on the process sample, the machine that produced the defective part shall be removed from producti.on. F
6、urther, that portion of production since the last process sample shall be rejected. 1 of 4 FSC 1330 DISTRIBUTION STATEMENT A, Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-70464 (AR) AME
7、NDMENT 1 4.4.3.2.3 Adjustment or rework of production machines - All machines removed from production because of some fault may, after adjustment or: rework, be returned to production provided they pass the qualification test above. 4.4.3.2.4 Statistical Process Control (SPC) Plan - The alternate sa
8、mpling plan shall be used only with the implementation of a procuring agency approved Statistical Process Control (SPC) Plan. See 6.5. The SPC plan shall record and monitor variable data. The data that are gathered from the acceptance sample may be used in the SPC data base.“ 4.4.4 Insert as the nex
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILG7046411991GRENADEGPLINERFOR 手榴弹 GP 班轮 PDF

链接地址:http://www.mydoc123.com/p-445013.html