ARMY MIL-G-63445-1982 GRENADE GENERAL PURPOSE PRACTICE M75《M75型一般用途的手榴弹演习》.pdf
《ARMY MIL-G-63445-1982 GRENADE GENERAL PURPOSE PRACTICE M75《M75型一般用途的手榴弹演习》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-G-63445-1982 GRENADE GENERAL PURPOSE PRACTICE M75《M75型一般用途的手榴弹演习》.pdf(12页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-G-63445 13 m 777770b 0350b24 3 m MIL-G-63445 (AR) 2 August 1982 M ILITARY SPEC I FI CATION GRENADE, GENERAL PURPOSE, PRACTICE, M75 This specification is approved for use by the U.S. Army Armament Research and Development Command, and is available for use by all Departments and Agencies of the De
2、partment of Defense. 1. SCOPE 1.1 This specification covers the quality assurance provisions and special requirements not covered by the drawings for parts and assembly of the M75 General Purpose Practice Grenade. 2. APPLICABLE DOCUMENTS 2.1.1 Specifications and standards. Unless otherwise 7- -I- sp
3、ecified (see 6.2), the following specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of this specification to the extent specified herein. SPEC I FI CATI ON S MILITARY MI
4、L-A-48078 Ammunition, Standard Quality Assurance Provisions, General Specification for MIL-F-634 46 Fuzes, General Purpose Grenade: M230 and M231 (Practice) MIL-B-63469 Body Assemblies, General Purpose Grenade: M73 and M75 (Practice) STANDARDS MILITARY MIL-STD- 105 Sampling Procedures and Tables for
5、 MIL-STD- 1167 Ammunition Data Card Inspection by Attributes 1330 I Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improvin this document should be addressed to: Commander, US Army Armament fiesearch and Develo ment Command, Attn. DRDAR-QA,
6、Dover, New Jersey 07801 by using te self-addossed Standardization Document Improvement Proposal (DD Form 426) appearing at the end of this document or by letter, I Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-63445 (AR) 2.1.2 Other Governmen
7、t documents, drawings, and ublications. The following other Government documents, drawings and publications form a part of this specification to the extent specified herein. US ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND (ARRADCOM) PRODUCT AND PACKAGE DRAWINGS 9334151 Grenade, General Purpose, Pr
8、actice: M75 (Copies of specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with specific acquisition functions should.be obtained from the contracting activity or as directed by the Contracting Officer.) text of this specification and the referenc
9、es cited herein, the text of this specification shall take precedence. Order of precedence. In the event of a conflict between the 3. REQUIREMENTS 3.1 Materiais. Materials shall be in accordance with 3.2 Components and assemblies. The components and assemblies applicable drawings and specifications.
10、 shall comply with all requirements specified on Drawing 9334151 and associated drawings and with all requirements specified in applicable specifications and standards. 3.3 M231 fuze. The fuze shall comply with specification MIL-F-63446. 3.4 Body assembly, M75. The body assembly shall comply with sp
11、ecification MIL-B-63469. 3.5 Reliability. The M75 Grenade shall demonstrate a minimum acceptable value (MAV) of 93.7% with a best operational capability (BOC) of 98% at 90% confidence. 3.6 Data requirements. The contractor shall generate data in accordance with the requirements of the data item desc
12、riptions cited in 4.5.3. 3.7 First article inspection. This specification makes provisions for first article inspection. submission of first article shall be as specified in the contract. Requirements for 2 o Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I
13、HS-,-,-HIL-G-63YgS 13 7779706 0350616 7 .- - MIL-G-63445 (AR) 3.8 Workmanshie. Unless otherwise specified on the drawing, all parts and assemblies shall be free from burrs, chips, sharp edges, cracks, unblended radii, surface defects, dirt, grease, rust, porosity, warpage, burn marks, checks, bliste
14、rs, excess flash, corrosion products and other foreign matter . The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agents, Surface coating shall be continuous except for a few slight scratches not exposing base material. The loading and as
15、sembly operations shall be performed in a thorough, workmanlike manner consistent with the best practices of the industry. All required markings shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise - specified in the contract, the con
16、tractor is responsible for the performance of all inspection requirements as specified herein. Except as otherwise specified in the contract, the Contractor may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the
17、 Government. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Unless otherwise specified herein or in the contract, the provisions of MIL-
18、A-48078 shall apply and are made a part of this specification. 4.2 Classification of inspections. Unless otherwise specified herein, or in the contract, the following types of inspection shall be conducted on this item: - a. First Article Inspection b. Quality Conformance Inspection 4.3 First articl
19、e inspection. 4.3.1 Submission. - The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with the provisions of 4.3.2. The first article sample shall consist of the following items in sample quantities as indicated: 3 Provided by IHSN
20、ot for ResaleNo reproduction or networking permitted without license from IHS-,-,-Part Description Con ta iner, Smoke Body Loaded Assembly Fuze Pushout Assembly Grenade, General Purpose, Practice: M75 MIL-G-63445 (AR) Draw inq Quant i ty 9 33414 5 15 9334117 229 See Note 15 9334151 25 Note: Empty M7
21、5 body assembly with cap removed and empty M231 fuze body. 4.3.2 Inspections to be performed. See MIL-A-48078 and Table I specified herein. 4.3.3 Rejection. See MIL-A-48078. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-63qLI5 33 m 7979706
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILG634451982GRENADEGENERALPURPOSEPRACTICEM75M75 一般 用途 手榴弹 演习 PDF

链接地址:http://www.mydoc123.com/p-445012.html