ARMY MIL-G-63393 (5)-1998 GRENADE GP HE M74 LOADING ASSEMBLING AND PACKING《G P HE M74型手榴弹的装载 组装和包装》.pdf
《ARMY MIL-G-63393 (5)-1998 GRENADE GP HE M74 LOADING ASSEMBLING AND PACKING《G P HE M74型手榴弹的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-G-63393 (5)-1998 GRENADE GP HE M74 LOADING ASSEMBLING AND PACKING《G P HE M74型手榴弹的装载 组装和包装》.pdf(3页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-G-b3393 (5) = 0b 2072544 252 = INCH-POUND MIL-G-63393 (AR) AMENDMENT 5 1 10 July 1998 SUPERSEDING AMENDMENT 4 28 September 1995 MILITARY SPECIFICATION GRENADE, GP, HE, M74 LOADING, ASSEMBLING AND PACKING MIL-G-63393 was inactivated after 13 February 1996 for new design. This amendment forms a p
2、art of Military Specification MIL-G-63393(AR), dated 11 July 1980, and is approved for use by the U.S. Army Armament Research, Development and Engineering Center, and is available for use by all Departments and Agencies of the Department of Defense. Change item designation from “XM74“ to “M74“ in ti
3、tle and wherever else it appears in this specification. PAGE 1 Delete “FSC 1375“ and substitute “FSC 1330“. PAGE 13 4.4.2.7 Male Hemisphere Loading Assy: Add: “See Note 1“ directly after word “Gage“ in Paragraph Reference/Inspection Method“ column in-line with defect characteristics 109, 110 and 111
4、. In notes block, add: “Note 1 - When cavities are cast formed by tray/insert method, inspection of this characteristic is not required.“ AMSC N/A 1 of 3 FSC 1330 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Provided by IHSNot for ResaleNo reproduction or network
5、ing permitted without license from IHS-,-,- MIL-G-63393 (5 1 W 9999906 2072545 199 MIL-G-63393 (AR) AMENDMENT 5 PAGE 15 4.4.2.8 Female Hemisphere Loading Assy: Add: “See Note 1“ directly after word Gage“ in Paragraph Reference/Inspection Method“ column in-line with defect characteristics 105. In not
6、es block, add: “Note 1 - When cavities are cast formed by tray/insert method, inspection of this characteristic is not required.“ Delete “Major 107“ in its entirety. PAGE 18 * 4.4.3.3 Dimensional control of stamped parts. Delete paragraph in its entirety and substitute: “4.4.3.3 Dimensional control
7、of stamped parts. When a First Article Sample is required, a sample of ten (10) parts shall be dimensionally inspected for all drawing features to qualify the tooling used in the stamping process for use in production. If any defective parts are found during qualification of the tooling, the tooling
8、 shall not be used in production until corrections are made and the tooling passes the qualification test above. All tools removed from production because of some fault, may, after reworking, be returned to production providing they pass the qualification test above. The following dimensiops shall b
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILG6339351998GRENADEGPHEM74LOADINGASSEMBLINGANDPACKINGGPHEM74 手榴弹 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-445005.html