ARMY MIL-G-20098 C-1969 GYPSUM CALCINED《石膏煅烧》.pdf
《ARMY MIL-G-20098 C-1969 GYPSUM CALCINED《石膏煅烧》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-G-20098 C-1969 GYPSUM CALCINED《石膏煅烧》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-G-20098C 31 January 1969 SUPERSEDING See Section 6 MILITARY SPECIFICATION GYSUM, CALCINED This specification is mandatory for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 hemihydrate). 1.2 Classification. as specif ied : This specification covers calcined gypsum
2、 (calcium sulfate The calcined gypsum shall be of the following types, . Type I - Fast setting Type II - Slow setting 2. APPLICABLE DOCUMENTS 2.1 for bids or request for proposal, form a part of this specification to the extent specified herein. The following documents of the issue in.effect on date
3、 of invitation SPECIFICATIONS FEDERAL RR-S-366 - Sieves, Standard for Testing Purposes UU-S-48 - Sack, Shipping, Paper PPP-C-96 - Cans, Metal, 28 Gauge and Lighter STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for Inspection by Attributes MIL-STD-129 - Marking for Shipment and Stor
4、age FSC 5610 - /I I . Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-G-20078C 56 777770b 0213115 2 1 MIL -6-2009 8C . (Copies of specifications, standards, drawings, and publications required by suppliers in connection with specific procurement
5、functions should be obtained from the procuring activity or as directed by the contracting officer .) 2.2 -. The following document fonns a part of this specification to the extent 8pecified herein. Unless otherwise indicated, the issue in effect on date of invitation for bids shall apply. AMERICAH
6、SOCZETY FOR TESTING AND MATERIALS Method C266 - Teat for Time of Setting of Hydraulic Cement by Gillmore Needles (Application for copies should be addressed to the American Society for Testing and Materials, 1916 Race Street, Philadelphia, Pa., 19103.) 3. REQUIREWNTS 3.1 mterial. The reaterial shall
7、 be a high-quality calcined gypsum meeting the requirements hereinafter specified. 3.2 Fineness. All the material ohall pass a No. 20 U. S. standard test sieve, while not less than 95 percent shally,pass a No. 100 sieve, when tested as specified in 4.5.1. 3.3. Set- ta. 3.3.1 TVDC I. The calcined gyp
8、sum shall set in not les8 than 20 minutes nor more than 25 minutes from the initial time of addition of water to the material. The setting tirne shall be determined as specified in 4.5.2. 3.3.2 TvDe 14. The calcined gypsum shall set in not less than 20 minutes nor aiore than two hours. 3.4 Shrtwe an
9、d em- o . The calcined gypsum shall not shrink The gypeum more than 0.10 percent when tested as,-specified in 4.5.3. shall not expand when so tested. 3.5 mession str-. 3.5.1 TvpeJ,. The average compfession strength of the dry set calcined gypaum shall be not less than 3,400 psi when tested a8 specif
10、ied in 4.5.4. The compression strength of any one of the iridividual test specimen8 shall be not less than 2,900 psi. 3.5.2 TvDe 11. shall not be lesa The conpression strength of type II calcined gypsura ; than 4,000 pounds psi. a Provided by IHSNot for ResaleNo reproduction or networking permitted
11、without license from IHS-,-,-MPL-G-2009 8C 3.6 Wm. The calcined gypsum ehe11 be a dry, powdered material, smooth in texture, and free of lumps and extraneous matter. shall be proceesed in accordance with high-grade commercial practice. The material 4. QUALITY ASSITBANCIS PBoVISIOS 4.1 RSDOO utv for
12、mDecth . Unless otherwise specified in the Except as otherwise contract or purchase order, the eupplier.is responsible for the perforeence of all inspection requirements as specified herein. specified in the contract or order, the supplier may use hie OWLI or any other facilities suitable for the pe
13、rformance of the inspection requirexitents specified herein, unless disapproved by the Cotrerusent. The Government re8erves the right to perform any of the nepections ret forth in the specification where such inspections are deemed necessary to aasure supplies and services conform to prerrcribcd req
14、uircwnts. produced under like conditions in one unchanged process by ooc manu- facturer and presented for: acceptance at one time. 4.2 La. A lot of calcined gypsum shell be of uniform composition, 4.3 SaaiDling. 4.3.1 Samlioe for examin at iog . A random raple of shipping containers shall be oelecte
15、d for examination of the gypsum and for the preparation for delivery in accordance with level 1 of MXL-STD-105. 4.3.2 Samm tw . Five containers shall be taken at random from the lot. A composite 2-pound sample rhall be prepared by rcIMtling equal portions of material from each relected container, an
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILG20098C1969GYPSUMCALCINED 石膏 煅烧 PDF
