ARMY MIL-F-70713-1987 FUZE MTSQ M776 LOADING ASSEMBLING AND PACKING《M776型MTSQ引信的装载 组装及包装》.pdf
《ARMY MIL-F-70713-1987 FUZE MTSQ M776 LOADING ASSEMBLING AND PACKING《M776型MTSQ引信的装载 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-70713-1987 FUZE MTSQ M776 LOADING ASSEMBLING AND PACKING《M776型MTSQ引信的装载 组装及包装》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、This Specification is approved for use within the U.S. Army Armament Munitions and Chemical Command, and is available for iI use by al1 Departments and Agencies of the Department of Defense. c 1. SCOPE .- 1.1 Scope. This specification covers the requirements and quality assurance provisions for the
2、loading, assembling and packing of the 14776 Mechanical Time Super Quick (MTSQ) Fuze. 2. APPLICABLE DOCUMENTS 2.1 Government documents. MIL-F-70713 (AR) 28 AUGUST 1987 MILITARY SPECIFICATION FUZE, MTSQ, M776 LOADING, ASSEMBLING AND PACKING 2.1.1 Specifications and Standards. The following specificat
3、ions and standards form a part of this specification to the extent specified herein. Unless otherwise specified, the issue of these documents shall be those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitati
4、on. SPECIFICATIONS FEDERAL MIL-A-48078 - Ammunition, Standards Quality Assurance Provisions, General Specification for Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of we in Improving this document should be addressed to: Commander, U.S. Army Armamen
5、t,Munitions and Chemical Command, Attn. AMSMC-QA. Picatinny Arsenal, New Jersey 07806-5OO by using the self-addressed Standardiza- ion Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. FCC 1390 AMSC N/A DISTRIBUTION STATEMENT A. a Approved for public re
6、lease: distribution is unlimited. fl THIS OOCUMENT CONTAINS -/q PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-70713 13 7779706 O356777 7 MIL-F-70713 (AR) STANDARDS MIL I TARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-331
7、 - Fuze and Fuze Components, Environmental MIL-STD-414 - Sampling Procedures and Tables for Inspection by Attributes and Performance Test for Inspection by Variables for Percent Defect ives 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, k draw
8、ings, and publications form a part of this specification to the extent specified herein. Unless otherwise specified, the issues shall be those in effect on the date of solicitation. DRAW I NGS U.S. ARMY ARMAMENT, RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) PRODUCT DRAWINGS 12361000 - Fuze,
9、MTSQ, M776 (Copies of specifications, standards, drawings, and publications required by contractors in connection with specific procurement functions should be obtained from the contracting activity or as directed by the contracting officer.) 2.2 Order of precedence. In the event of a conflict betwe
10、en the text of this specification and the references cited herein, (except for associated detail specifications, specification sheets or MS standards) the text of this specification shall take precedence. Nothing in this specification, however shall supersede applicable laws and regulation unless sp
11、ecific exemption has been obtained. 3. REQUIREMENTS 3.1 Material. Materials and parts shall be in accordance with applicable drawings and specifications. 3.2 Fuze assembly. The M776 MTSQ fuze assembly shall comply with all re,quirements specified in drawing (dwg.) 12361000 and with all requirements
12、specified in applicable specifications. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-a * e - MIL-F-70713 13 W 7777706 0356780 3 H MIL-F-70713 (AR) 3.3 Transportation vibration. The fuze assembly shall comply with the requirements of MIL-STD-331A
13、, Test 123, and of 3.8.1, 3.8.3 and 3.8.5. 3.4 Jolt and jumble. The fuze assembly shall comply with the requirements of MIL-STD-331A, Test 101.3, Procedure 2 and Test 102.2. 3.5 Drop test, 1.5 meter. The fuze assembly shall comply with the requirements of MIL-STD-331A, Test 111.1. 3.6 Waterproofness
14、. The fuze assembly shall comply with the requirements of MIL-STD-331A, Test 108, except that the duration of immersion shall be five (5) minutes minimum and the pressure shall be three (3) psig min. 3.7 Torque. The fuze assembly timer setting section shall not move when a torque of 30 kpcm min. is
15、applied. The timer setting section shall move when a torque of 55 kpcm max. is applied. 3,8 Ballistic performance (proving ground). 3.8.1 Premature burst. There shall be no premature burst or metal parts failure in the mortar tube or in the first 100 meters of flight. 3.8.2 Arming safety. The fuze s
16、hall not function on impact against a 25mm min. plywood screen positioned at a distance of - 40 meters t/- i meter. - 3.8.3 Fuze functioninq time (702). The fuze, when set in the time mode, shall cause the projectile to function within the upper (UL) and lower (LL) time limits and shall not exceed t
17、he maximum allowable percent defective as specified below. Set Time (sec) Function Time Limits (sec) 19.0 LL = 18.00 UL = 20.00 26.0 LL = 25.00 UL = 27.00 Sample Size (see 6.4) Maximum Allowable Percent Defect 30 20 10 3 2.83 2.95 3.26 Provided by IHSNot for ResaleNo reproduction or networking permi
18、tted without license from IHS-,-,- MIL-F-70713 13 W 9777706 0356781 5 MIL-F-70713 (AR) 3.8.4 Extreme temperature fuze functioning time. The fuze, when set in the time mode, and conditioned at -5OOF OK 1450F, shall cause the projectile to function within the upper (UL) and lower (LL) time limits and
19、shall not exceed the maximum allowable percent defective requirement as specified below. Set Time (sec) Function Time Limits (sec) 26.0 LL = 24.50 UL = 27.50 Sample Size (see 6.4) Maximum Allowable Percent Defect 30 10 2.83 3.26 3.8.5 Fuze failure. When a fuze is set to function in the air and funct
20、ions on impact or does not function at all, it shall be considered a dud. 3.9 First article. When specified in the contract or purchase order, a sample shall be subjected to first article inspections in accordance specified herein. (see 4.3 and 6). 3.10 Workmanship. All parts and assemblies shall be
21、 fabricated in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, rust and other foreign matter. The cleaning methods shall not be injurious to any part, nor shall the parts be contaminated by the cleaning agent. Exterior surface coating shall be uniform and cont
22、inuous except for a few light scratches not exposing any base material. All required markings shall be neat and sharply defined. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection. Unless otherwise specified in the contract OK purchase order, the contractor is responsible for the perf
23、ormance of al1 inspection requirements as specified herein. contract or purchase order, the contractor may utilize his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to
24、perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. herein or in the contract, the provisions of MIL-A-48078 shall apply and are hereby made a part of this detail specification.
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF707131987FUZEMTSQM776LOADINGASSEMBLINGANDPACKINGM776 MTSQ 引信 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-444865.html