ARMY MIL-F-50994-1972 FUZE ROCKET M423 MODIFIED (BUNKER) LESS BOOSTER AND LEAD《M423改装(燃料)少助推器和导线火箭弹引信》.pdf
《ARMY MIL-F-50994-1972 FUZE ROCKET M423 MODIFIED (BUNKER) LESS BOOSTER AND LEAD《M423改装(燃料)少助推器和导线火箭弹引信》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-50994-1972 FUZE ROCKET M423 MODIFIED (BUNKER) LESS BOOSTER AND LEAD《M423改装(燃料)少助推器和导线火箭弹引信》.pdf(40页珍藏版)》请在麦多课文档分享上搜索。
1、MTLZTARY SPECIFICATION FUZE, DCKET, M423, WDIFTED (BUNKER) IESS BCX)STER AND LEAD 1. SCOPE 1.1 This specification covers the quality assurance pra- Visions and special requirements not covered by the parts and assenbly drawin of a point detonating me, modified for bun- ker penetration, designated as
2、 Fuze, Fbcket, m23, bbdifled (Bmker) Less Booster and Booster Lead (see 6.7). 2. APPLICBrn Ix)cuMENTs 2.1 ?he follbwing docunients of the issue in effect .on date of invitation for bids or request for proposals form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY
3、 _- MLA-8625 - Anodic Coatinpg for Aluminum and Aluminum MILD-18665 - Detonator, Mark 59 Alloys PURQIPSE iE3ClUFTIoN AEZ-93 - Primr, ML04 (XI94Ei) Parts for and Mading, AssenKihg and Packing STANDARD3 MILITARY MIGSTD-105 - Sanpling Procedures and T Functional Test - Aircraft Vibratrion, Method 514,
4、Curve Z, as specified in MIL-STD-810. The vibration conditioninq shall be continuously performed until completed. After completion of the Five Foot Drop Test and the Functional Test, including the acceptance criteria for these tests (leak test, non-arming test, and arming time test), the same fuzes
5、shall be tested for hiqh order functioning, 3.4.6 Seal leakage test,-The leakage in the fuze shall not cause a pressure drop greater than 0,00072 psi in 10 sec, 3,4,7 Fuze Firing 3.4.7.1 Point Detonating Elode,-The fuze assembly shall function the explocive elements when a weight is dropped onto the
6、 nose of the luze, 3,4,7,2. Bunker Moda,-The fuze assembly in the bunker mode shall function the explosive elements when the fuze is dropped nose-down onto a steel plate, 3.5 Workmanshi ,-AU parts and assemblies shall be free from burrs, chips, _fi_p s arp edges, cracks, unblendad radii, surface de-
7、 fects, dirt, grease, rust, porosity, warpage, burn marks, checks, blisters, excess flash, corrosion products and other foreign matter. The cleaning method used shall not be injurious to any part nor shall the parts be contaminated by the cleaning agents, Surface coating shall be continuous except f
8、or a few slight scratches not exposing base material, The loading and assembly operatlons shall be performed in a thorough workmanlike manner consistent with the best practices of the industry. All required marking shall be neat and sharply defined. 4 Provided by IHSNot for ResaleNo reproduction or
9、networking permitted without license from IHS-,-,-MIL-F-50774 13 977770b 0333284 O MIL-F-50994 (MU) 3.6 First article inspection.-This specification makes provisions for first article inspection, Requirerent for the sub- mission of first article samples by the contractor shall be as specified in the
10、 contract. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection.-Unless otherwise speci- fied in the contract or purchase order, the supplier is responsible for the performance of all inspection requirerents as specified herein. Except as otherwise specified in the contract or order, th
11、e supplier may use his own or any other facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by the Government. The Government reserves the right to perforri?. any of the inspections set forth in the speci- fication where such inspections are de
12、emed necessary to assur2 supplies and services conform to prescribed requirements. 4.1.1 Submission of product,-At the time each completed lot o iterrs deliverable under the contract is submitted to the Govsrn- ment for acceptance, the contractor shall supply the following information accompanied by
13、 a certificate which attests that the inforration provided is correct and applicable to the product being submitted : a. A statement that the lot complies with all of the quality assurance provisions specified in this specification. b, Drawing and specification number and date, together with identif
14、ication and date of changes thereto. c, A statemnt that all material purchased by the con- tractor mets requirements, when such material is controlled by Governmnt or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on fila and availa
15、ble for review, The certificate shall be signed by a responsible agent of the cer- tifying organization. The initial certificate submitted shall be substantiated by evidence of the agents authority to bind his prin- cipal, Substantiation of the agents authority will not be required with subsequent c
16、ertificates unless, during the course of the con- tract, this authority is vested in another agent of the certifying organization. d. Number of items in the lot, e, Date submitted, 4.1,2 Contractor inspection system.-As part of the contrac- torts approved quality procedure, there shall be a provisio
17、n for checking tho adequacy of inspections mads in connection with listed critical or major defects. following provisions: These procedures shall include the Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-flIL-F-5077Y 13 m 777770b 0333285 2 m MIL-F-
18、50994 (MU) 4.1.2.1 Use of simulated defect stand.ards.-The following listed verified inspections shall be validated-and inspection equip- ment verified hourly using Design Agency approved item facsimilies or standards containing the defects and supplied by the contractor. The contractor shall resupp
19、ly the item facsimilies when it is deter- mined by the Government that the facsimilies are no longer represen- tative enough of the product to make it unidentifiable to the con- tractor inspection personnel, or it is not functioning in the neces- sary manner and cannot be corrected satisfactorily. T
20、hese standards should be representative of defects actually found or anticipated. They should be inert and readily identifiable to the Government to ensure recovery should they be inadvertently introduced into pro- duction. Simulated defect standards used to verify the following verified inspections
21、 should be constructed and identified in such a manner that they are not readily recognizable to the contractor inspection personnel as defect standards, so that their number, time, and sequence of introduction into the inspection cycle is known only to those personnel responsible for checking the a
22、ccuracy of. the operation. Adequacy o the standards shall be verified at feast once each shift, Standards should be used. Verified Inspections Paragraph 4 3,3 11 - Setback weight return capability Paragraph 4.3.3.15 - S2 Undetected defect standards. Provisions shall be established for the corrective
23、 action to be taken where the equip- ment or contractor inspection personned fail to identify a standard as defective, .These provisions shasll Include a reinspection of all acceptable material subsequent to the last acceptable verification check as a minimum, . 4.2 First Article Inspection 4.,2.1 C
24、ubmission,-The contractor shall submit a first article sample as designated by the contracting officer to a Government approved facility for evaluation Ln accordance with the provisions of 4,2.2. The first article sample shall have been produced by the contractor ox furnished by a supplier and which
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF509941972FUZEROCKETM423MODIFIEDBUNKERLESSBOOSTERANDLEADM423 改装 燃料 助推器 导线 火箭弹 引信 PDF

链接地址:http://www.mydoc123.com/p-444733.html