ARMY MIL-F-12777 A-1982 FUZE MINE AT PRACTICE M604 LOADING ASSEMBLING AND PACKING《训练用反坦克地引信 M604组装及包装》.pdf
《ARMY MIL-F-12777 A-1982 FUZE MINE AT PRACTICE M604 LOADING ASSEMBLING AND PACKING《训练用反坦克地引信 M604组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-12777 A-1982 FUZE MINE AT PRACTICE M604 LOADING ASSEMBLING AND PACKING《训练用反坦克地引信 M604组装及包装》.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、i MIL-F-12 77 7A (AR) 26 Aprj1 1982 SUPERSEDING .MIL-F-12777 (ORD) 3 June 1953 FUZE, MINE, AT, PRACTICE: M604 LOADING, ASSEMBLING AND PACKING This specification is approved for use by the U.S. Army Armament Research and Development Command, and is available for use by all Departments and Agencies of
2、 the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers quality assurance provisions and preparation for delivery for Fuze, Mine, AT, Practice: M604. (See 6.1,) 2 . APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. Unless otherwise specified (see 6.
3、2), the following specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicitation, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL-A- 48 O 78 - Ammun
4、ition, Standard Quality Assurance 9 Provisions, General Specification For. MIL-P- 60 345 - Primer, Stab, M45, Loading, Assembling and Packing. STANDARDS MILITARY MIL-STD-105 - Sampling Procedures and Tables for MIL-STD-286 - Propellants, Solid: Sampling, Inspection by Attributes. Examination and Tes
5、ting. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be o* use in improvin this document should be addressed to: Commander, US Army Armament fiesearch and Develo ment Command, Attn. DRDAR-QA, Dover, New Jersey 07801 by using tle self-addossed Standardiza
6、tion Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. I , t FSC 1345 THIS DOCUMENT CONTAINS b PAGES. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-). . z .- MIL-F-LZ777A 13 797770b 0274943 b MIL-F-127
7、77A (AR) 2.1.2 Other Government documents, drawinqs, and publications. The following other Government documents, drawings, and publications form a part f this specification to the extent specified herein. 1 DRAWINGS (See 6.5) US ARMY ARMAMENT RESEARCH AND DEVELOPMENT COMMAND 7548394 - Container, Amm
8、unition, Metal, For Fuze, 7548395 - Box, Packing, Ammunition, For Fuze, Mine, 934933.5 - Fuze, Mine, AT, Practice, M604 (Loading Mine, AT, Prac, M604. AT, Prac, M604. Assembly) . (Copies of specifications, standards, handbooks, drawings, and publications required by manufacturers in connection with
9、specific acquisition functions should be obtained from the contracting activity or as directed by the contracting officer .) 2.2 Other publications. The following document(s) form a part of this specification to the extent specified herein. The issues of the documents which are indicated as DoD adop
10、ted shall be the issue listed in the current DoDISS and the supplement thereto, if applicable . AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) 1 ASTM B 117 - Salt Spray (Fog) Testing (Application for copies of ASTM publications should be addressed to the American Society for Testing and Materials
11、, 1916 Race Street, Philadelphia, Pennsylvania 19103.) 2.3 Order of precededce. the text of this specification and the references cited herein, the text of this specification shall take precedence. In the event of a conflict between 3. REQUIREMENTS 3.1 Materials and parts. Materials and parts shall
12、be in accordance with the applicable drawings, specifications and standards . 3.2 Fuze assemblies. The mine fuze assemblies shall comply with all requirements specified on Drawing (Dwg.) 9349315, all associated drawings, and with all requirements specified in applicable specifications and standards.
13、 3.3 Moisture content of smoke composition. The moisture content of the smoke comxosition at the time and place of loading shall not exceed 0.10 peicent when tested as specified in 4.5.1.- t 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-F-127
14、77A (AR) 3.4 Functioninq. The fuzes shall function with a characteristic loud report and produce a characteristic smoke volume when a load of three-hundred (300) pounds, maximum, is applied when tested as specified in 4.5.2. 3.5 Waterproofness. The fuzes shall show no evidence of leakage and shall f
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF12777A1982FUZEMINEATPRACTICEM604LOADINGASSEMBLINGANDPACKING 训练 反坦克 引信 M604 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-444565.html