ARMY MIL-F-12774 D-1975 FUZE MINE COMBINATION M605 LOADING ASSEMBLING AND PACKING《M605装组合式地雷引信 组装及包装》.pdf
《ARMY MIL-F-12774 D-1975 FUZE MINE COMBINATION M605 LOADING ASSEMBLING AND PACKING《M605装组合式地雷引信 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-F-12774 D-1975 FUZE MINE COMBINATION M605 LOADING ASSEMBLING AND PACKING《M605装组合式地雷引信 组装及包装》.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、MIL-F-12774D 13 m 9779906 0294423 O W MIL-F-12774D (PA) 22 May 1975 Sup ers e ding 14 February i969 MIL-F-12774G (MU) FUZE, MINE, COMBINATION, M605 LOADING, ASSEMBLING AND PACKING This specification is approved far use by all departments and agencies of the Department of Defense. 1. SCOPE 1.1 This s
2、pecification covers the loading, assembling and packing for one type of fuze designated as Fuze., Mine, Comb inat ion, M6 O 5. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids, or request for proposals, form a part of this specification to the
3、 extent specified herein. SPECIFICATIONS -MILITARY ML-P-223 - Powder, Black MIL-C-13739 - Composition, Delay MIL-P-20444 - Primer, Percussion, M42, Loading, MIL-A-48078 - Ammunition, Standard Quality Assurance Assembling and Packing Provisions, General Specification for Provided by IHSNot for Resale
4、No reproduction or networking permitted without license from IHS-,-,-MIL-F-12774D (PA) DRAWINGS. U.S. ARMY PICATINNY ARSENAL PRODUCT AND PACKING DRAWINGS 7548179 - Box, Packing, Ammu ition i? or 162 (with Fuze, Mine, r Mine, APERS, 161 Combination, M605 ) 7548190 - Ammunition, Container, Metal for F
5、uze, 7548284 - Fuze, Mine, Combination, M605 Assembly 8863609 - Support, Packing, Ammunition for Mine, . . APERS, M16A1 or M16A2 (with Fuze, Mine, Mine, Combination, M605, Assembly, Details, Packing and Marking Combination, 605 INSPECTION EQUIPMENT DRAWINGS 8792739 - Functioning test fixture 8796343
6、 - Propellant charge (Copies of specifications, standards, drawings and publications required by contractors in connection with specific procurement functions should be obtained from the procuring activity or as directed by the contracting officer. ) 3. REQUIREMENTS (see 6.7) 3.1 Material. - Materia
7、ls and parts shall be in accordance with applicable drawings and specifications. 3.2 Fuze assembly. - The mine fuze assembly shall comply with all requirements specified on Drawing (dwg.) 7548284 and with all requirements specified in applicable specifications. 3.3 Moisture content of black powder.
8、- The moisture content of the black powder at the time of loading shall not exceed the amount specified in MIL-P-223. 3.4 Moisture content of delay composition. - The moisture content of the delay composition at the time of 1oadi.ng shall not exceed 0.04 percent. 3.5 Punctioninq. - The fuze shall fu
9、nction satisfactorily (see 6.5) and shall function with a delay time of not less than 1.0 second nor more than 2.0 seconds (see 6.6). S3.6 Waterproofness. - The fuze shall function after being subjected to the specified test procedures. 2 Provided by IHSNot for ResaleNo reproduction or networking pe
10、rmitted without license from IHS-,-,-MIL-F-12774D 23 7779706 0274425 4 = MIL-P-12774D (PA) 3.7 Workmanship. - All parts and assemblies shall be fabricated and loaded in .a thorough, workmanl5ke manner. They shall be free of burrs, sharp edges, cracks, chips, dirt, corrosion products and other foreig
11、n material. The cleaning method used shall not be injurious to any of the parts nor shall the parts be contaminated by the cleaning agent. Exterior surface coatings shall be continuous except for a few slight scratches not exposing base material. All required markings shall be neat and sharply defin
12、ed. 3.8 First article inspection. - This specification contains technical Drovisions for first article insDection. Reauirements for the submission of first article samples by the contractor shall be as specified in the contract. 4. QUALITY ASSURANCE PROVISIONS . S4. Responsibility for Inspection and
13、 Standard Quality Assurance Pro-visons. - Unless otherwise specifie herein or in the contract, the provisions of MIL-Am48078 shall awly -“ - and are hereby made a-part of this detail specification. The following certifications are required: a. Certificate of conformance denoting primer composition a
14、nd the drying procedure as per Dwg. 7548287 shall be furnished with each lot submitted for acceptance. b . Certificate of conformance denoting drying procedure of the flash igniter head assembly in the event of excess ex- posure as per Dwg. 7548286 shall be furnished with each lot submitted for acce
15、ptance. *4.2 Classification of inspections. - The following types of inspections shall be conducted on this item. a. First Article Inspection. b. Quality Conformance Inspection. 4.3 First Artcle Inspection *4.3.1 Submission. - The contractor shall submit a first article sample (see 6.2b) as designat
16、ed by the Contracting Officer. The first article sample shall consist of fifty (50) consecutively produced complete assemblies. The first article sample shall be evaluated in accordance with the provisions of 4.3.2 and 4.303. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted wit
17、hout license from IHS-,-,-Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-rl IL O rl I- W W 2 erl o u n n I- B I O o M fc Cu mln “ Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-P-12774D (PA) 4.4
18、 Quality confoPmanc Inspection 84.4.1 Inspection lot formation. - Inspection lots shall comply with the lot formation provisions of MIL-A-48078. Lot numbering as required shall be in accordance with MIL-STD-1168. In addition, inspection lots of loaded fuzes shall contain: a. Parts of not more than o
19、ne lot interfix number from b. Black powder from not more than one lot. c. Delay composition from one batch or blending of do Primers from not more than one lot interfix number e. Head assemblies from not more than one lot interfix one manufacturer. batches which results in homogeneity of all delay
20、composition used in loading the entire fuze lot. from one manufacturer. number from one manufacturer. 84.4.2 Examination. - (See MIL-A-48078). Unless otherwise specified in the classification of defects and test tables, sampling plans for major or minor defects shall be in accor- dance with MIL-STD-
21、105, Inspection Level II. Equipment nece- ssary for the performance of the inspections listed shall be in accordance with 4.4.4. i. 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,- MIL-F-12774D 13 W 06 029LILI27 I -7 rlrl rl cdcd 33 CVCu Cucu+ MM M
22、MM . b=b= O0 =I-* O0 Y 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-8 I rl rl c. W i3 h rl io E al rn rn 4 ci a, .v d r: hD H m cd rl k cu cu a 00 Od a, rl cd o d u d ci u rlcu oc Ncu Provided by IHSNot for ResaleNo reproduction or networking pe
23、rmitted without license from IHS-,-,-I G il w 8 o U Lu P Z O F: u I VI 4 u rl Ir. O rl R rl P 8 rn rn 4 ho r: 4 rn 5 o X ci 4 ci pc 2 M Cu 3 b 5i l- v) W i- K O 2 O 0 W i- N I e U K e i$ ;5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-rn I- w n o
24、Y w Z O F: !k o I 4 rn U a- Co Tu Co a- Ln fc cu L O rl h ri P rn E 2 n Ln C v3 x n P O u E n n a- * - MIL-F-12774D 13 D 9777706 0274q33 3 cucucu cucu cu CUcucuNcuN n MMM MM M MMMMMM 0- . . k% -FR R RRXRRR w RRb? InLn o 000000 c O00 cucu a- a-=r=ra-a-=l- =f rldrl O0 o 000000 c n a, 3e rn h- cd a U c
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILF12774D1975FUZEMINECOMBINATIONM605LOADINGASSEMBLINGANDPACKINGM605 组合式 地雷 引信 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-444562.html