ARMY MIL-E-14776 A-1973 EXTENSION FIN《鳍板组件》.pdf
《ARMY MIL-E-14776 A-1973 EXTENSION FIN《鳍板组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-E-14776 A-1973 EXTENSION FIN《鳍板组件》.pdf(7页珍藏版)》请在麦多课文档分享上搜索。
1、- MIL-E-ILl776A I3 = 7777706 0276753 5 5-3 7-07 MIL-E-l4776A(PA) 23 November 1973 SUPERSEDING MIL-E-l4776(MU) 12 June i968 MILITARY SPECIFICATION EXTENSION, FIN This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 This specification covers
2、 the metal parts for one type of fin extension for use with 6OMM Mortar Cartridges de- signated as Extension, Fin. 2. APPLICABLE DOCUMENTS 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposals form a part of this specification to the extent specif
3、ied herein. SPECIFICATIONS MILITARY c MIL-A-2550 -Ammunition and Special Weapons General Specification for STANDARDS MILITARY MIL-STD-105 -Sampling Procedures and Tables for Inspection by Attributes MIL-STD-109 -Quality Assurance Terms and Definitions MIL-STD-1168 -Lot Numbering of Ammunition MIL-ST
4、D-1169 -Packaging, Packing and Marking, for Shipment of Inert Ammunition Components MIL-STD-1235 -Single and Multilevel Continuous Sampling Procedures and Tables for Inspection by Attributes (ABC-STD-105 ) DRAWINGS ARMY 9215574 -Extension, Fin Provided by IHSNot for ResaleNo reproduction or networki
5、ng permitted without license from IHS-,-,-MIL-E-1477bA 13 W 999990b 027b752 7 MIL-E-l4776A(PA) (Copies of specifications, standards, drawings and publications required by suppliers in connection with specific procurement functions should be obtained from the procuring activity or as directed by the
6、contracting officer.) 3 . REQUIREMENTS 3.1 Material.-Materials shall be in accordance with applicable drawings and specifications. 3.2 Fin Extension.-The fin extension shall comply with ali requirements specified on Drawing (dwg.) 9215574 and with all requirements specified in applicable specificati
7、ons. 3.3 Workmanship.-The fin extension shall be fabricated and finished in a thorough workmanlike manner and shall be free from dirt, grease, chips, oil, corrosion or other foreign matter. any part nor shall the parts be contaminated by the cleaning agent . tains technical provisions for first arti
8、cle inspection. ments for the submission of first article samples by the contractor shall be as specified in the contract. The cleaning method used shall not be injurious to 3.4 First article inspection.-This specification con- Require- 4. QUALITY ASSURANCE PROVISIONS 4.1 General quality assurance p
9、rovisions.-Unless otherwise Except as otherwise specified, the supplier specified in the contract or purchase order, the supplier is responsible for the performance of all inspection requirements as specified herein. may utilize his own facilities or any commercial laboratory accept- able to the Gov
10、ernment. The Government reserves the right to perform any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. be made to Standard MIL-STD-109 in order to define terms used herein. The provis
11、ions of Specification MIL-A-2550 shall apply. Submission of product.-At the time the completed lot of product is submitted to the Government for acceptance, the contractor shall supply the following information accompanied by a certificate which attests that the information provided is correct and a
12、pplicable to the product being submitted: Reference shall 4.1.1 a. b. Number of units of product inspected. c. d. Drawing, specification number and date, together with A statement that the lot complies with all of the quality assurance provisions specified within this specification. Results obtained
13、 for all inspections performed. an identification and date of changes. 2 - I 1 i Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-E-Lq77bA 13 = 777770b 0276753 7 I MIL-E-14776A (PA) e. Certificates of conformance on all material purchased by the c
14、ontractor when such material is controlled by Government or commercial specifications referenced in any of the contractual documents. f. Number of items in the lot. g. Date submitted. The certificate shall be signed by a responsible agent of the certifying organization. be substantiated by evidenceo
15、f the agents authority to bind his principal. required with subsequent certificates unless, during the course of the contract, this authority is vested certifying organization. The initial certificate submitted shall Substantiation of the agents authority will not be in another agent of the 4.2 Firs
16、t Article Inspection 4.2.1 Submission.-The contractor shall submit a first article sample as designated by the contracting officer for evaluacion in accordance with the provisions of 4.2.2. The first article sample shall consist of 50 parts which have been produced by the contractor or furnished by
17、a supplier and which have been manufactured using the same production pro- cesses, procedures, and equipment which will be used in ful- filling the contract. All parts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used in regular producti
18、on. mission, the contractor shall inspect the sample to the degree necessary to assure that it conforms to the requirements of the contract and submit a record of this inspection with the sample, including statements of findings for materials, pro- cesses, and tests. A sample containing known defect
19、s will not be submitted unless specifically authorized, by the contracting officer A first article sample or portion thereof, as directed by the contracting officer, shall also be submitted whenever there is a lapse in production for a period in excess of 90 days or whenever a change occurs in manuf
20、acturing process, material used, drawing or specification such as to significantly affect product uniformity as determined by the Government. jected by the Government to any or all of the examinations or tests specified in this specification and any or all require- ments of the applicable drawings.
21、or all of the applicable requirements, the initial production sample shall be rejected. to terminate its inspection upon any failure of a part in the sample to comply with any or all of the stated requirements. Prior to sub- 4.2.2 Inspection to be performed.-Parts will be sub- 4.2.3 Rejection.-If an
22、y part fails to comply with any The Government reserves the right 4.3 inspection Provisions 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-E-1477bA 13 7779706 0276754 O MIL-E-14 7 7 GA ( PA) 4.3.1 Lot formation.-The term “lot“ as used througho
23、ut this specification refers to an inspection lot, which is defined as an essentially homogeneous collection of units of product from which a representative sample is drawn and inspected to determine conformance of the lot with applicable requirements. The sample selected shall represent only that q
24、uantity of units from which the sample was drawn and shall not be construed to represent any prior or subsequent quantities presented for in- spection, Homogeneity shall be considered to exist provided the lot has been produced by one manufacturer, in one unchanged process using the same materials a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILE14776A1973EXTENSIONFIN 组件 PDF
