ARMY MIL-DTL-7567 C-2002 PARACHUTES PERSONNEL DETAIL MANUFACTURING INSTRUCTIONS FOR《人员降落伞元件制造介绍》.pdf
《ARMY MIL-DTL-7567 C-2002 PARACHUTES PERSONNEL DETAIL MANUFACTURING INSTRUCTIONS FOR《人员降落伞元件制造介绍》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-7567 C-2002 PARACHUTES PERSONNEL DETAIL MANUFACTURING INSTRUCTIONS FOR《人员降落伞元件制造介绍》.pdf(11页珍藏版)》请在麦多课文档分享上搜索。
1、 Beneficial comments (recommendations, additions, deletions) and any pertinent data that may be of use in improving this document should be addres sed to: Natick Soldier Center ATTN: AMSSB - RAD - AD(N), Natick, MA 01760 - 5017, using the Standardization Document Improvement Proposal (DD Form 1426)
2、appearing at the end of this document or by letter. AMSC N/A FSC 1670 DISTRIBUTION STATEMENT A. Approve d for public release; distribution is unlimited. INCH - POUND MIL - DTL - 7567C 30 OCTOBER 2002 SUPERSEDING MIL - P - 7567B 28 March 1985 DETAIL SPECIFICATION PARACHUTES, PERSONNEL, DETAIL MANUFAC
3、TURING INSTRUCTIONS FOR This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers detail instructions relative to the dimensions, tolerances, repair procedures and other specific manufacturing instructions to be
4、 used in the assembly of personnel parachutes. The personnel parac hutes covered include the chest, seat, back, troop, training, rescue, integrated, maneuverable, and special purpose. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are cited in sections 3 and 4 of this spec
5、ification. These lists do not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of these lists, document users are cautioned that they must meet all specified requireme
6、nts documents cited in sections 3 and 4 of this specification, whether or not they are listed. 2.2 Government documents. 2.2.1 Specifications and standards. The following specifications and standards form a part of this doc ument to the extent herein. Unless otherwise specified, the issues of these
7、documents are those listed in the issue of the Department of Defense Index of Specifications and Standards (DoDISS) and supplement thereto, cited in the solicitation (see 6.2). S PECIFICATIONS DEPARTMENT OF DEFENS E Provided by IHSNot for ResaleNo reproduction or networking permitted without license
8、 from IHS-,-,-MIL - DTL - 7567C 2 MIL - DTL - 6645 - Parachutes, Personnel, General Specification for STANDARDS DEPARTMENT OF DEFENS E MIL - STD - 849 - Inspection Requirements, Definitions and Classification of Defects in Parachutes 2.3 Non - Government p ublications. The following documents form a
9、 part of this document to the extent specified herein. Unless otherwise specified, the issues of the documents that are DoD adopted are those listed in the issue of the DoDISS cited in the solicitation. Unless otherwise specified, the issues of documents not listed in the DoDISS are the issues of th
10、e documents cited in the solicitation. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM) ASTM D 6193 Standard Practice for Stitches and Seams (Application for co pies should be addressed to the American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428 - 2959.) 2.
11、4 Order of precedence. In the event of a conflict between the text of this document and the references cited herein ( except for related associated specifications or specification sheets), the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and r
12、egulations unless a specific exemption has been obtained. 3. REQUIREMEN TS 3.1 First article. When specified, a sample shall be subjected to a first article inspection in accordance with 4.2. 3.2 Materials. Materials shall conform to the requirements of the applicable Technical Data Package (TDP) as
13、 specified in the proc urements documents. 3.3. Construction. Details of construction shall be in accordance with the applicable TDP and the additional requirements specified herein (see 3.4, 3.5 and 3.6). In the event of a conflict between construction details specified in the TDP and this specific
14、ation, the TDP shall govern. 3.3.1 Stitches and tolerances. 3.3.1.1 Stitching. Stitching shall conform to ASTM D 6193. Unless otherwise specified in the applicable TDP, the number of stitches per inch shall be as specified in Table I for the stitch type indicated. Table I. Thread size and stitches p
15、er inch Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL - DTL - 7567C 3 Thread Size Stitches per inch Zig Zag (Single Throw) type 304 Zig Zag (Single Throw) Type 308 B 7 to 11 12 to 16 8 to 12 E 7 to 11 12 to 14 7 to 10 F 7 to 11 12 to 14 7 to 10
16、 FF 6 to 9 - - 3 5 to 8 - - 5 4 to 6 - - 6 4 to 6 - - 3.3.1.2 Tolerances. Dimension tolerances, unless specifically called out differently in the TDP, shall be in accordance with Table II. Table II. Tolerances Dimension (inches) 1 / Tolerance ( + ) 1/16 1/32 in. More than 1/16 but less than 2 1/16 i
17、n. 2 or more, but less than 10 1/8 in. 10 or more, but less than 30 1/4 in. 30 or more, but less than 60 3/8 in. 60 or more 1/2 in. 1 / Tolerances are not cumulative. 3.4 Canopy. The canopy consists of the drag producing surface, suspension lines and connector links. The provisions specified in the
18、following subparagraphs also apply to the pilot chutes and drag (drogue) parachutes. 3.4.1 Cloth defects. The acceptability of cl oth used in the manufacture of the canopy shall be governed by the pertinent cloth specification unless waived by the procuring activity. During the spreading, cutting an
19、d manufacturing process, components having material defects or damages that are class ified as defects in the applicable cloth specification shall be removed from production and replaced with non - defective components. Cloth damage during seam ripping shall be cause for total rejection of the damag
20、ed section. No imperfection that requires darning shall be allowed in a gore before seam joining. 3.4.1.1 Canopy damage during construction. The maximum number of darns permitted in the main drag producing surface shall not exceed three darns per canopy, and one darn per gore, unless otherwise speci
21、fied. The maximum number of darns permitted for the drag producing surface of a pilot and drag (drogue) parachute shall not exceed one per canopy. Darns are not allowed for stretch fabric panels. Damaged or stretch fabric panels must be patched or replaced. 3.4.2 Dimensions after cutting. The dimens
22、ions of the gore sections after cutting will not be required to duplicate the measurements in the applicable TDP because the latter dimensions are intended for the pattern only. Variation in the finis hed width of cloth due to humidity or Provided by IHSNot for ResaleNo reproduction or networking pe
23、rmitted without license from IHS-,-,-MIL - DTL - 7567C 4 relaxation of tension after cutting and variation of measurement from the top to the bottom of the lay after cutting shall be recognized. 3.4.3 Seams and hems. Unless otherwise specified herein, tight gores, poorly folded seams resulting in ra
24、gged edges, cloth edges not caught in stitching, doubling over of cloth on the inside of the seam, and pleats in folding of seams shall not be permitted. The cross seam may contain sewing, folding, or material defects not detri mental to strength when the defects occur for a distance not to exceed 1
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL7567C2002PARACHUTESPERSONNELDETAILMANUFACTURINGINSTRUCTIONSFOR 人员 降落伞 元件 制造 介绍 PDF

链接地址:http://www.mydoc123.com/p-444453.html