ARMY MIL-DTL-70742 A-2013 MOUNT TELESCOPE AND QUADRANT - M187A1.pdf
《ARMY MIL-DTL-70742 A-2013 MOUNT TELESCOPE AND QUADRANT - M187A1.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-70742 A-2013 MOUNT TELESCOPE AND QUADRANT - M187A1.pdf(18页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-DTL-70742A (AR) 6 May 2013 SUPERSEDING MIL-M-70742 (AR) 30 September 1988 DETAIL SPECIFICATION MOUNT, TELESCOPE AND QUADRANT - M187A1 This specification is approved for use by ARDEC and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This s
2、pecification covers the Mount, Telescope and Quadrant: M187A1 which supports the Telescope, Panoramic: M137A2 for use on the M119 series of towed howitzers. The mount provides elevation adjustment and compensates for angles of cant when laying the guns for indirect fire. 2. APPLICABLE DOCUMENTS 2.1
3、General. The documents listed in this section are specified in sections 3 and 4 of this specification. This section does not include documents in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness
4、 of this list, document users are cautioned that they must meet all requirements of documents cited in sections 3 and 4 of this specification, whether or not documents are listed in this section. Comments, suggestions, or questions on this document should be addressed to: Commander, US Army ARDEC, A
5、TTN: RDAR-QES-E, Picatinny Arsenal, New Jersey 07806-5000 or emailed to usarmy.picatinny.ardec.list.ardec-stdzn-branchmail.mil Since contact information can change, you may want to verify the currency of this address information using the ASSIST online database at https:/assist.dla.mil. AMSC N/A FSC
6、 1240 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. INCH-POUND Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-70742A (AR) 2 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The fol
7、lowing specifications, standards, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-F-13926 - Fire Control Materiel, Manufactur
8、e, and Inspection, General Specification for DEPARTMENT OF DEFENSE STANDARDS MIL-STD-1916 - DOD Preferred Methods for Acceptance of Product (Copies of federal and military specifications, standards, and handbooks are available online at https:/assist.dla.mil/quicksearch/ or from the Standardization
9、Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094.) 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this specification to the extent specified herein. Unless otherwise sp
10、ecified, the issues of these documents are those cited in the solicitation or contract. U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) DRAWINGS 8213745 - Adapter, Fixture for Mt. Telescope M137, Quad. Elevation M15 8565556 - Pressure Tester Two Station 8658940 - Inspection A
11、id 10555620 - Sighting Device 11747889 - Gage, Interchangeability Max 12984689 - Mount, Telescope and Quadrant: M187A1 12984713 - Telescope, Panoramic: M137A2 13020787 - Plate, Identification 13028309 - Adapter, Fixture (Copies of these drawings may be requested online at usarmy.picatinny.ardec.list
12、.drawing-request-help-deskmail.mil or from U.S. Army ARDEC, ATTN: RDAR-EIS-PE, Picatinny Arsenal, NJ 07806-5000) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-70742A (AR) 3 2.3 Order of precedence. Unless otherwise noted herein or in the co
13、ntract, in the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First art
14、icle. When specified (see 6.2), a sample shall be subjected to first article inspection in accordance with 4.2. 3.2 Conformance. A sample shall be subject to conformance inspection in accordance with 4.3. 3.3 Mount. The mount shall conform to drawing 12984689. 3.4 Environmental. 3.4.1 Storage temper
15、ature. While thermally stabilized at temperatures of +160 5F and -60 5F, the mount shall not exhibit any signs of physical failure or damage. Upon return to and stabilization at standard ambient temperature, +60F to +90F, the mount shall meet the requirements of 3.5 through 3.11 inclusive. 3.4.2 Ope
16、rating temperature. The mount shall meet the requirements of 3.7 while exposed to and thermally stabilized at temperatures of +145 5F and -50 5F. Upon return to and stabilization at standard ambient temperature, +60F to +90F, the mount shall meet the requirements of 3.5 through 3.11 inclusive. 3.4.3
17、 Shock. With a M137A2 panoramic telescope, 12984713, attached in the appropriate location, the mount shall withstand a total of 18 shock impulses along the 3 mutually perpendicular axes as defined in Figure 1. Each shock impulse shall be a half sine wave with a time duration of 0.010 0.001 seconds a
18、nd peak amplitude for each shock impulse as shown in Table I when measured at the face of the counterbox of the M137A2 telescope (see Figure 1). Subsequent to shock, the mount shall show no evidence of damage or physical failure and shall meet the requirements of 3.5 through 3.11 inclusive. TABLE I.
19、 Shock orientation and impulse at M137A2 counterbox. Orientation Shock impulse and direction Number of impulses Longitudinal -100 gs, +100 gs 3 each direction Vertical -100 gs, +100 gs 3 each direction Transverse -60 gs, +60 gs (See 6.7) 3 each direction Provided by IHSNot for ResaleNo reproduction
20、or networking permitted without license from IHS-,-,-MIL-DTL-70742A (AR) 4 FIGURE 1. Orientation of shock loads on M187A1 mount. 3.4.4 Vibration “A”. The mount shall withstand a total of 270 5 minutes of sweep-cycle vibration. The vibration shall be applied for 90 2 minutes along each of the three m
21、utually perpendicular major axes shown in Figure 1. A complete sweep-cycle shall consist of vibration from origin (5 Hz at 1 inch double amplitude) to mid-point (5 0.5 gs at 500 Hz) to origin, and shall have a duration of 15 1 minutes. Double amplitude shall be constant at 1 inch between 5 Hz and 10
22、 Hz, and varied with frequency to maintain a constant 5 0.5 gs acceleration between 10 Hz and 500 Hz. Upon completion of vibration, the mount shall exhibit no evidence of damage or physical failure and shall meet the requirements of 3.5 through 3.11 inclusive. 3.4.5 Vibration “B”. The mount shall be
23、 vibrated in the vertical plane shown in Figure 1 for a total of 15 1 minutes of sweep cycle vibration. A complete sweep-cycle shall consist of vibration from origin (5 Hz at 1 inch double amplitude) to mid-point (5 0.5 gs at 500 Hz) to origin, and shall have a duration of 15 1 minutes. Double ampli
24、tude shall be constant at 1 inch between 5 Hz and 10 Hz and varied with frequency to maintain a constant 5 0.5 gs acceleration between 10 Hz and 500 Hz. Upon completion of vibration, the mount shall exhibit no evidence of damage or physical failure and shall meet the requirements of 3.5 through 3.11
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL70742A2013MOUNTTELESCOPEANDQUADRANTM187A1PDF

链接地址:http://www.mydoc123.com/p-444446.html