ARMY MIL-DTL-70526 B-2009 PROJECTILE 105 MILLIMETER HE RA- M913 M927 DELAY ASSEMBLY FOR《M913 M927型105毫米火箭助推榴弹延迟组件》.pdf
《ARMY MIL-DTL-70526 B-2009 PROJECTILE 105 MILLIMETER HE RA- M913 M927 DELAY ASSEMBLY FOR《M913 M927型105毫米火箭助推榴弹延迟组件》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-70526 B-2009 PROJECTILE 105 MILLIMETER HE RA- M913 M927 DELAY ASSEMBLY FOR《M913 M927型105毫米火箭助推榴弹延迟组件》.pdf(26页珍藏版)》请在麦多课文档分享上搜索。
1、 INCH-POUND MIL-DTL-70526B(AR) 6 April 2009 SUPERSEDING MIL-P-70526A(AR) 6 July 1994 DETAIL SPECIFICATION PROJECTILE, 105 MILLIMETER, HE, RA- M913/M927, DELAY ASSEMBLY FOR This specification is approved for use by the U.S. Army Armament Research Development and Engineering Center (ARDEC), and is ava
2、ilable for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification contains requirements and quality assurance provisions for the fabrication and packaging of parts and assembly of the delay assembly for the 105MM, High Explosive, Rocket Assisted, M91
3、3 / M927 Projectiles. AMSC N/A FSC 1315 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Comments, suggestions, or questions on this document should be addressed to the Commander, U.S. Army ARDEC, ATTN: RDAR-QES-E, Picatinny Arsenal, NJ 07806-5000 or emailed to ardec
4、stdznconus.army.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online database at http:/assist.daps.dla.mil. Inactive for new design after 21 August 1998 Provided by IHSNot for ResaleNo reproduction or networking permitted
5、without license from IHS-,-,-MIL-DTL-70526B 22. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specification. This section does not include documents sited in other sections of this specification or recommended for additional informat
6、ion or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all requirements documents cited in sections 3 and 4 of this specification, whether or not they are listed. 2.2 Government documents. 2.2.1 Specifications, s
7、tandards and handbooks. The following specifications, standards and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-P-217 - Potas
8、sium Perchlorate (for pyrotechnics) MIL-T-48140 - Tungsten Powder (for pyrotechnics) MIL-V-50433 - Vinyl Alcohol Acetate Resin Solution (VAAR) (For Use Ammunition) DEPARTMENT OF DEFENSE STANDARDS MIL-STD-1168 - Ammunition lot numbering and ammunition data cards MIL-STD-1234 - Pyrotechnics; Sampling,
9、 Inspection and Testing MIL-STD-1916 - DoD preferred methods for acceptance of product (Copies of these documents are available online at http:/assist.daps.dla.mil/quicksearch/ or from the Standardization Document Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094.) 2.2.2 Other
10、 Government documents, drawings and publications. The following other Government documents, drawings and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation Provided by IHSNot for ResaleNo reproduction o
11、r networking permitted without license from IHS-,-,-MIL-DTL-70526B (AR) 3US ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) DRAWINGS 12926809 - Delay Assembly 13023959 - Radiographic Inspection Method for Artillery Projectiles and Components (Copies of these drawings may be reques
12、ted online at Drawing.Requestconus.army.mil or from U.S. Army ARDEC, ATTN: RDAR-AIS-TD, Picatinny, NJ 07806-5000.) 2.3 Non-Government publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those
13、 cited in the solicitation or contract. ASTM INTERNATIONAL (ASTM) ASTM B430 - Standard Test Method for Particle Size Distribution of Refractory Metal Powders and Related Compounds by Turbidimetry (Copies of ASTM standards are available online at http:/www.astm.org or from American Society for Testin
14、g and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959) 2.4 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in th
15、is document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 Required inspections. 3.1.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection in accordance with 4.2. 3.1.2 Conformance.
16、A sample shall be subjected to conformance inspection in accordance with 4.3. 3.2 Components and assemblies. The components and assemblies shall comply with all requirements specified on drawing (dwg.) 12926809. Provided by IHSNot for ResaleNo reproduction or networking permitted without license fro
17、m IHS-,-,-MIL-DTL-70526B (AR) 43.3 Ammunition lot numbering. Ammunition lot numbers shall be assigned in accordance with MIL-STD-1168. 3.4 Pyrotechnic composition, total volatiles. The total volatiles of the flash, delay and igniter composition at the time of loading shall not exceed 0.10 percent. T
18、he flash, delay and igniter compositions shall comply with dwg. 12926809. 3.5 Crimp strength. The washer crimp shall be capable of withstanding a 500 pound minimum load. 3.6 Pyrotechnic porosity test. The pressure recorded at the exit end of the delay assembly; 80 seconds after application of the ni
19、trogen gas shall not exceed 9 PSIG above the zero reference. The pressure recorded at the exit end of the delay assembly 110 seconds after application of the nitrogen gas shall be no greater than 19 PSIG above the zero reference. 3.7 Radiographic inspection. The delay column shall not be missing or
20、be short in length. There shall be no voids or low density areas in the area of individual increments in the delay column. There shall be no evidence of aluminum slivers in the delay column. The flash or igniter composition shall not be missing. The boron potassium nitrate pellets shall not be missi
21、ng, contain voids greater than 1/64th square inch, or have a gap between the top of the closure greater than 1/8th inch. The delay washer shall not be missing. 3.8 Performance. (See 6.22 for definitions). 3.8.1 Pilot composition. The pilot composition shall be acceptable when the ballistic delay bur
22、n times of the pilot composition batches show that the required burn time of 15.25 + .75 seconds at 70 degrees F is met by at least one batch or is bracketed by at least one batch on the high and low ends so that an optimal burn time fuel ratio may be determined. The standard deviation of the batch(
23、es) meeting the requirement shall not exceed .62 seconds when ballistically tested at 70 degrees F in accordance with 4.4.7. When ballistically tested at -50 degrees F, the delay shall function to the extent that it ignites the rocket motor. During static spin testing, the samples shall not contain
24、any long burn time statistical outliers. The results shall be used to set the fuel level for production. (See 6.17) 3.8.2 Delay composition. Each lot of delay composition shall be ballistically tested at 70 degrees F and -50 degrees F. The production batch shall have a mean time of 15.25 + .75 secon
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL70526B2009PROJECTILE105MILLIMETERHERAM913M927DELAYASSEMBLYFORM913M927 105 毫米 火箭 助推 榴弹 延迟 组件

链接地址:http://www.mydoc123.com/p-444444.html