ARMY MIL-DTL-70507 A-2010 PROJECTILE 155MM HE - M864E2 LOADING ASSEMBLING AND PACKING《M864E2型155 mm高爆榴弹的装药 组装和包装》.pdf
《ARMY MIL-DTL-70507 A-2010 PROJECTILE 155MM HE - M864E2 LOADING ASSEMBLING AND PACKING《M864E2型155 mm高爆榴弹的装药 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-70507 A-2010 PROJECTILE 155MM HE - M864E2 LOADING ASSEMBLING AND PACKING《M864E2型155 mm高爆榴弹的装药 组装和包装》.pdf(40页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-DTL-70507A (AR) 16 March 2010 SUPERSEDING MIL-P-70507 (AR) 28 December 1984 MILITARY SPECIFICATION PROJECTILE, 155MM, HE - M864E2 LOADING, ASSEMBLING AND PACKING Reactivated 16 March 2010 and may be used for new and existing designs and acquisitions. This specification is approved for use by th
2、e U.S. Army Armament Research, Development and Engineering Center (ARDEC), and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers the loading, assembling and packing for the projectile, 155MM, HE: M864E2. The M864E2 cargo
3、is the M1162 Pyrotechnic Self-Destruct Fuze (p-SDF) designed to minimize battlefield duds by adding self-destruct capability to the current Dual Purpose Improved Conventional Munitions (DPICM) M42/M46 grenade. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are needed to me
4、et the requirements specified in sections 3 and 4 of this specification. This section does not include documents in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users
5、are cautioned that they must meet all requirements documents cited in sections 3 and 4 of this specification, whether or not they are listed. Comments, suggestions, or questions on this document should be addressed to the commander, U.S. Army ARDEC, ATTN: RDAR-QES-E, Picatinny Arsenal, NJ 07806-5000
6、 or e-mailed to ardec-stdznpica.army.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST online database at https:/assist.daps.dla.mil . AMSC N/A FSC 1320 DISTRIBUTION STATEMENT A. Approved for public release; distribution is un
7、limited. INCH POUND Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-70507A (AR) 2 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standards, and handbooks form a part of this specificati
8、on to the extent specified herein. Unless otherwise specified the issues of these documents are those cited in the solicitation or contract. DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-W-5625 - Webbing, Textile, Nylon, Tubular MIL-A-70625 - Automated Acceptance Inspection Equipment Design, Testing and
9、Approval, of DEPARTMENT OF DEFENSE STANDARDS MIL-STD-286 - Propellants, Solid: Sampling, Examination and Testing MIL-STD-331 - Fuze and Fuze Components, Environmental and Performance Tests for MIL-STD-810 - Environmental Engineering Considerations and Laboratory Tests MIL-STD-1168 - Ammunition Lot N
10、umbering and Ammunition Data Card MIL-STD-1916 - DoD Preferred Methods for Acceptance of Product MIL-STD-3010 - Test Procedures for Packaging Materials (Copies of these documents are available online at https:/assist.daps.dla.mil/quicksearch/ or from the Standardization Document Order Desk, 700 Robb
11、ins Avenue, Bldg. 4D Philadelphia, PA 19111-5094.) US ARMY DEVELOPMENTAL TEST COMMAND (DTC) INTERNATIONAL TEST OPERATING PROCEDURES ITOP 1-2-601 - Laboratory Vibration Schedule (These documents may be ordered from the US Army Developmental Test Command, ATTN: Publications, 314 Longs Corner Road, Abe
12、rdeen Proving Ground, MD 21005-5005, or online at http:/www.dtc.army.mil/publications/topsindex.aspx ) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-70507A (AR) 3 2.2.2 Other Government documents, drawings, and publications. The following o
13、ther Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation contract. DRAWINGS 8841732 - Leak test fixture 9202990 - Operating instructions for leak te
14、st 9215397 - Steel shim 9381113 - Rubber pad 9381111 - Forward plate 9381117-1 - Body and ogive assembly for projectile, 155mm, M864 9381130 - Base burner assembly 9391057 - Expulsion cup 12934962 - Charge bag assembly 12934963 - Charge loading assembly 12944315 - Expulsion charge assembly 13001888
15、- Extended range obturator 13001895 - Body loading assembly, type PH 13001896 - Body loading Assembly, type CA 13001900 - Body fuze assembly, type PH 13001902 - Body fuze assembly, type CA 13001904 - Grenade, M46 13001906 - Grenade, M42 13001907 - Projectile, 155mm, extended range, DP, M864E2 130019
16、09 - Tape loop for self destruct fuze 13016773 - Slider lock for self destruct fuze (Copies of these drawings may be requested online at pica.drawing.requestconus.army.mil or from US Army ARDEC, RDAR-EIS-PE, Picatinny Arsenal, NJ 07806-5000.) 2.3 Non-Government publications. The following other Gove
17、rnment documents, drawings and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation or contract. CODE OF FEDERAL REGULATIONS TITLE 49 - Transportation, Parts 100-199 (The Code of Federal Regulations is av
18、ailable from the Superintendent of Documents, U.S. Government Printing Office, Washington, D.C. 20402. Orders should specify, “49 CFR 100-199 (latest revision)”.) AMERICAN SOCIETY FOR TESTING AND MATERIALS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-
19、,-,-MIL-DTL-70507A (AR) 4 ASTM E 18 - Standard Test Methods for Rockwell Hardness and Rockwell Superficial Hardness of Metallic Materials ASTME E 1742 - Standard Practice for Radiographic Examination (Copies of these documents are available from www.astm.org or ASTM International 100 Barr Harbor Dri
20、ve, West Conshohocken, PA 19428-2959.) 2.4 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and the references cited herein the text of this document takes precedence. Nothing in this document, however, supersedes app
21、licable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified, a sample shall be subjected to first article inspection in accordance with 4.2. 3.2 Conformance inspection. A sample shall be subjected to conformance testing in accordance
22、with 4.3. 3.3 Components and assemblies. Materials, parts and assemblies shall comply with drawings cited in 4.3.2.1 through 4.3.2.18. 3.4 Projectile. The projectile assembly and all components thereof shall comply with all requirements specified on drawing 13001907. 3.5 Ballistic functioning. 3.5.1
23、 Functioning (not including safety phase). All the projectile hardware shall remain intact until the initiation of the time fuze at a predetermined time after firing. The delivery of the cargo to the target area shall also include the successful expulsion of the entire cargo of grenades. 3.5.2 Funct
24、ioning. There shall be no premature burst or evidence thereof and there shall be no separation of metal parts either in the bore of the weapon or in flight (prior to initiation of the time fuze) in any of the ballistic functioning tests. This requirement shall also apply to those rounds to be fired
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL70507A2010PROJECTILE155MMHEM864E2LOADINGASSEMBLINGANDPACKINGM864E2 155 MM 榴弹 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-444443.html