ARMY MIL-DTL-62567 D-2010 TORSION BAR SUSPENSION《扭力杆式悬架》.pdf
《ARMY MIL-DTL-62567 D-2010 TORSION BAR SUSPENSION《扭力杆式悬架》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-62567 D-2010 TORSION BAR SUSPENSION《扭力杆式悬架》.pdf(14页珍藏版)》请在麦多课文档分享上搜索。
1、 Comments, suggestions, or questions on this document should be addressed to U.S. Army RDECOM, Tank Automotive Research, Development and Engineering Center, ATTN: RDTA-EN/STND/TRANS MS #268, 6501 E. 11 Mile Road, Warren, MI 48397-5000 or emailed to DAMI_STANDARDIZATIONconus.army.mil. Since contact i
2、nformation can change, you may want to verify the currency of this address information using the ASSIST Online database at https:/assist.daps.dla.mil. AMSC N/A FSC 2530 INCH-POUND MIL-DTL-62567D(AT) 8 April 2010 SUPERSEDING MIL-DTL-62567C(AT) 16 September 1998 DETAIL SPECIFICATION TORSION BAR, SUSPE
3、NSION This specification is approved for use by the U.S. Army Tank Automotive Research, Development and Engineering Center (TARDEC), Research, Development and Engineering Command (RDECOM), Department of the Army, and is available for use by all Departments and Agencies of the Department of Defense.
4、1. SCOPE 1.1 Scope. This specification covers a military combat vehicle suspension torsion bar. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3, 4 or 5 of this specification. This section does not include documents cited in other sections of this
5、 specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requirements of documents cited in sections 3, 4 or 5 of this specification, whether or no
6、t they are listed. 2.2 Government documents. 2.2.1 Government documents, drawings, and publications. The following Government documents, drawings, and publications form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation
7、or contract (see 6.2). Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-62567D(AT) 2 U.S. ARMY TACOM DRAWINGS 12369003 - Steel Ext. Surfaces, Green 383 12292010 - Torsion Bar, Suspension 10929033 - Gage, Special Involute Go Composite Ring 1092
8、9035 - Gage, Involute Not Go Sector Ring (Copies of these documents are available from DAMI_STANDARDIZATIONconus.army.mil or U.S. Army RDECOM, Tank Automotive Research, Development and Engineering Center, ATTN: RDTA-EN/STND/TRANS MS #268, 6501 E. 11 Mile Road, Warren, MI 48397-5000.) 2.3 Non-Governm
9、ent publications. The following documents form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract (see 6.2). ASTM INTERNATIONAL ASTM A604 - Method for Macroetch Testing of Consumable Electr
10、ode Remelted Steel Bars and Billets (DoD Adopted) ASTM E1444 - Standard Practice for Magnetic Particle Examination (Copies of these documents are available from www.astm.org or ASTM International, P.O. Box C700, West Conshohocken, PA 19428-2959.) SAE INTERNATIONAL SAE AMS 2300 - Steel Cleanliness, P
11、remium Aircraft - Quality Magnetic Particle Inspection Procedure (DoD Adopted) SAE AMS 6257 - Steel Bars, Forgings, and Tubings (DoD Adopted) SAE AMS-STD-2154 - Inspection, Ultrasonic, Wrought Metals, Process for (Copies of these documents are available from www.sae.org or SAE Customer Service, 400
12、Commonwealth Drive, Warrendale, PA 15096-0001.) 2.4 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between the text of this document and the references cited herein, the text of this document takes precedence. Nothing in this document, however, supe
13、rsedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection in accordance with 4.4 (see 6.3). Provided by IHSNot for ResaleNo reproduction or networking perm
14、itted without license from IHS-,-,-MIL-DTL-62567D(AT) 3 3.2 Design and construction. 3.2.1 Materials. The contractor shall select the material, but the material shall be capable of meeting the operational requirements specified herein. It is recommended, but not mandatory, that steel alloy 300M, cla
15、ss 3, condition optional, as specified in SAE AMS 6257 be used. 3.2.1.1 Billet material. The billet material shall meet both of the following requirements: a. The billet material shall have a sufficient internal cleanliness as determined by testing in accordance with 4.2a. b. The billet material sha
16、ll have a sufficient surface cleanliness as determined by testing in accordance with 4.2b. 3.2.1.2 Bar stock. The bar stock shall meet both of the following requirements: a. The finished bar stock (before hot upsetting) shall have a sufficient internal cleanliness as determined by testing in accorda
17、nce with 4.2c. b. The finished bar stock shall be as follows: 1. The finished bar stock (before hot upsetting) shall have a sufficient surface cleanliness as determined by testing in accordance with 4.2d. No laps or seams shall be permitted, or, 2. The finished bar stock shall have a sufficient inte
18、rnal cleanliness as determined by testing in accordance with 4.2e. 3.2.2 Processing. 3.2.2.1 Heat treatment. The torsion bar shall be quenched and double tempered to a through hardness of Rockwell C51 minimum. This hardness is required for the bar to be compatible with the design requirements of int
19、erfacing components (see 4.6.1). 3.2.2.1.1 Decarburization and retained austenite. Microscopic examination of a prepared cross section of the torsion bar following final heat treatment at a magnification of 250 diameters shall show no evidence of retained austenite or partial decarburization beyond
20、a depth of 0.003 inches from the surface. Partial decarburization between the surface and a depth of 0.003 inches shall not result in a hardness reduction of more than 3 points Rockwell C as determined by microhardness traverse comparison between that area and the core hardness (see 4.6.1). 3.2.2.2
21、Surface indications. Magnetic particle inspection of the finished torsion bar (after final heat treatment) shall disclose no indications in excess of the requirements of SAE AMS 2300 and SAE AMS 6257. Laps, inclusions, and seams shall not be permitted. Nicks and scratches less than four inches long
22、shall be removed by blending the surface to a depth of not greater than 0.010 inch. After removal of scratches, the torsion bar shall still meet dimensional requirements of Drawing 12292010 (see 4.6.2 and 4.6.3). Provided by IHSNot for ResaleNo reproduction or networking permitted without license fr
23、om IHS-,-,-MIL-DTL-62567D(AT) 4 3.2.2.3 Surface finish. The surface texture of a torsion bar shall be as specified on Drawing 12292010 (see 4.6.3). 3.2.2.4 Preset. The torsion bar shall be preset to the requirements of Drawing 12292010 by twisting one end of the bar in the direction indicated a mini
24、mum of three times while restraining the opposite end. The bar shall be held stationary at full windup for not less than 10 seconds during each preset cycle. The last twist shall result in a change of set angle of not greater than 1.0 degree from the preceding twist. The degrees of permanent set sha
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL62567D2010TORSIONBARSUSPENSION 扭力 悬架 PDF

链接地址:http://www.mydoc123.com/p-444423.html