ARMY MIL-DTL-60426 B (1)-2006 BURSTER PROJECTILE-M54A1《M54A1型起爆弹》.pdf
《ARMY MIL-DTL-60426 B (1)-2006 BURSTER PROJECTILE-M54A1《M54A1型起爆弹》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-60426 B (1)-2006 BURSTER PROJECTILE-M54A1《M54A1型起爆弹》.pdf(22页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-DTL-60426B (AR) W/AMENDMENT 120 September 2006 SUPERSEDING MIL-DTL-60426B (AR) 21 June 2006 DETAILED SPECIFICATION BURSTER, PROJECTILE - M54A1 This specification is approved for use by the U.S. Army Armament Research, Development and Engineering Center (ARDEC), and is available for use by all D
2、epartments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers components, loading, assembling and packing of the M54A1 projectile burster. 2. APPLICABLE DOCUMENTS. 2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specif
3、ication. This section does not include documents in other sections of this specification or recommended for additional information or as examples. While every effort has been made to assure the completeness of this list, document users are cautioned that they must meet all requirements documents cit
4、ed in sections 3 and 4 of this specification, whether or not they are listed. AMSC N/A FSC:1320 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. Comments, suggestions, or questions on this document should be addressed to the Commander, U.S. Army ARDEC, ATTN: AMSRD-AA
5、R-QES-E, Picatinny, NJ 07806-5000 or emailed to ardec-stdznpica.army.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST Online database at http:/assist.daps.dla.mil. INCH-POUND Provided by IHSNot for ResaleNo reproduction or ne
6、tworking permitted without license from IHS-,-,-MIL-DTL-60426B (AR) W/AMENDMENT 1 2 2.2 Government documents. 2.2.1 Specification, standards and handbooks. The following specifications, standards, and handbooks form a part of this specification to the extent specified herein. Unless otherwise specif
7、ied, the issues of these documents are those cited in the solicitation or contract. DEPARTMENT OF DEFENSE STANDARDS MIL-STD-1168 - Ammunition Lot Numbering and Ammunition Data Card MIL-STD-1916 - DOD Preferred Method of Acceptance of Product (Copies of these documents are available online at http:/a
8、ssist.daps.dla.mil/quicksearch/ or http:/assist.daps.dla.mil or from the Standardization Documents Order Desk, 700 Robbins Avenue, Building 4D, Philadelphia, PA 19111-5094.) 2.2.2 Other Government documents, drawings and publications. The following other Government documents, drawings and publicatio
9、ns below form a part of this document to the extent specified herein. Unless otherwise specified, the issues are those cited in the solicitation. U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT, AND ENGINEERING CENTER (ARDEC) DRAWINGS 9238839 - PROJECTILE BURSTER M54A1 ASSEMBLY 9238840 - DISC 9238841 - CLO
10、SURE 9238842 - BURSTER TUBE 9238843 - BASE PLUG 9241806 - COMPOSITION B-5 (Copies of these drawings may be requested online at Drawing-Requestpica.army.mil or from US Army ARDEC, ATTN: AMSRD-AAR-AIS-T, Picatinny, NJ 07806-5000.) 2.3 Non-Government publications. The following documents form a part of
11、 this document to the extent specified herein. Unless otherwise specified, the issues of the documents are those cited in the solicitation or contract. ASTM INTERNATIONAL ASTM E 1742 - Standard Practice for Radiographic Examination (Copies of ASTM standards are available online from http:/www.astm.o
12、rg/ and from American Society for Testing and Materials, 100 Barr Harbor Drive, West Conshohocken, PA 19428-2959.) Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-60426B (AR) W/AMENDMENT 1 3 2.4 Order of precedence. In the event of a conflict
13、 between the text of this specification and the references cited herein, the text of this specification takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (se
14、e 6.2), a sample shall be subject to first article inspection in accordance with 4.2. 3.2 Materials, components and assemblies 3.2.1 Disc. Materials components and assemblies shall comply with all requirements specified on drawing 9238840. 3.2.2 Closure. Materials components and assemblies shall com
15、ply with all requirements specified on drawing 9238841. 3.2.3 Burster tube. Materials components and assemblies shall comply with all requirements specified on drawing 9238842. 3.2.4 Base plug. Materials components and assemblies shall comply with all requirements specified on drawing 9238843. 3.2.5
16、 Projectile burster M54A1 assembly. Materials components and assemblies shall comply with all requirements specified on drawing 9238839 and this specification. 3.3 Ammunition lot numbering. Ammunition lot numbering shall be assigned in accordance with MIL-STD-1168. 3.4 Burster tube loading. The inte
17、rior surface of the burster tube shall be dry when the high explosive is poured into the burster tube. Solid explosives shall not be present in the burster tube before loading or be added to the burster tube during pouring or cooling. No explosive scrap, clean or otherwise, shall be remelted or reus
18、ed. Riser scrap, scrap from floor sweepings, ventilation and suction apparatus, or scrap from drilling operations shall not be reused or remelted. 3.5 Explosive composition. The explosive composition shall be prepared in accordance with drawing 9241806. Composition B-5 shall conform to the requireme
19、nts specified in Table I, when tested in accordance with paragraph 4.4.2. Composition B-5 is prepared by the addition of TNT to molten Cyclotol, Type I (75/25). The elastomer and an excess of the Glyceride of 12-hydroxystearic acid are added separately and the mixture is stirred until uniform. Provi
20、ded by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-60426B (AR) W/AMENDMENT 1 4 TABLE I. Composition B-5 properties and requirements Property Requirement RDX% 67.0 +/- 10.0% TNT% 30.5 +/- 9.5% Resin% 0.7 to 4.0 3.6 Explosive loading radiographic requi
21、rements. 3.6.1 Cavitation (base). There shall be no single cavity having a projected length of more than 1/8 inch or sum total of cavities of more than 1/64 square inch in the area from the top of the base plug to one inch above the top of the plug. There shall be no cracks or annular rings in the c
22、harge in this area except that cracks less than 1/32 inch wide shall be disregarded. 3.6.2 Cavitation (top) There shall be no single cavity having a projected length of more than 3/8 inch or a sum total of cavities of more than 3/8 square inch and there shall be no more than three transverse cracks
23、over 1/32 inch wide in the area from the top of charge to one inch from the top of the base plug. Cracks less than 1/32 inches wide in this area shall be disregarded. 3.6.3 Porosity. From the top of the base plug to one inch above the top of the plug, porous areas shall not exceed a projected length
24、 of 0.47 inches or a projected area of 0.16 square inch. From one inch above the top of the base plug to the top of the charge, porous areas shall not exceed a projected length of 9.5 inches or a projected total area of 4.75 square inches. 3.6.4 Void between charge and base plug. There shall be no v
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL60426B12006BURSTERPROJECTILEM54A1M54A1 起爆 PDF

链接地址:http://www.mydoc123.com/p-444385.html