ARMY MIL-DTL-48555 B-2012 QUADRANT FIRE CONTROL - M17A1.pdf
《ARMY MIL-DTL-48555 B-2012 QUADRANT FIRE CONTROL - M17A1.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-48555 B-2012 QUADRANT FIRE CONTROL - M17A1.pdf(16页珍藏版)》请在麦多课文档分享上搜索。
1、 MIL-DTL-48555B 16 August 2012_ SUPERSEDING MIL-Q-48555A(AR) 26 November 1989 DETAIL SPECIFICATION QUADRANT, FIRE CONTROL - M17A1 This specification is approved for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers Quadrant, Fire Control:
2、 M17A1, which provides a measure of elevation angles for 155mm towed howitzers. It is equipped with numerical counters which indicate elevation settings and corrections. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specification.
3、 This section does not include documents in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all requirements of documents cited in
4、 sections 3 and 4 of this specification, whether or not documents are listed in this section. Comments, suggestions, or questions on this document should be addressed to: Commander, US Army ARDEC, ATTN: RDAR-QES-E, Picatinny Arsenal, New Jersey 07806-5000 or emailed to picaardecstdznbranchconus.army
5、.mil. Since contact information can change, you may want to verify the currency of this address information using the ASSIST online database at https:/assist.dla.mil. AMSC N/A FSC 1290 DISTRIBUTION STATEMENT A. Approved for public release; distribution is unlimited. INCH-POUND Reactivated after 16 A
6、ugust 2012 and may be used for new and existing designs and acquisitions Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-48555B 2 2.2 Government documents. 2.2.1 Specifications, standards, and handbooks. The following specifications, standard
7、s, and handbooks form a part of this document to the extent specified herein. Unless otherwise specified, the issues of these documents are those cited in the solicitation or contract. DEPARTMENT OF DEFENSE SPECIFICATIONS MIL-F-13926 - Fire Control Materiel, Manufacture, and Inspection, General Spec
8、ification for DEPARTMENT OF DEFENSE STANDARDS MIL-STD-1916 - DOD Preferred Methods for Acceptance of Product (Copies of federal and military specifications, standards, and handbooks are available online at https:/assist.dla.mil/quicksearch/ or from the Standardization Document Order Desk, 700 Robbin
9、s Avenue, Building 4D, Philadelphia, PA 19111-5094.) 2.2.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this specification to the extent specified herein. Unless otherwise specified, the issues of these do
10、cuments are those cited in the solicitation or contract. U.S. ARMY ARMAMENT RESEARCH, DEVELOPMENT AND ENGINEERING CENTER (ARDEC) DRAWINGS 11747195 - Vibration and/or Shock Fixture for Quadrant Fire Control XM17 and/or XM18 11747969 - Gage, Interchangeability Max 13005101 - M17A1 Quadrant 13010954 -
11、Plate, Identification (Copies of these drawings may be requested online at pica.drawing.requestconus.army.mil or from U.S. Army ARDEC, ATTN: RDAR-EIS-PE, Picatinny Arsenal, NJ 07806-5000) 2.3 Order of precedence. Unless otherwise noted herein or in the contract, in the event of a conflict between th
12、e text of this document and the references cited herein, the text of this document shall take precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. Provided by IHSNot for ResaleNo reproduction or networking permitted
13、without license from IHS-,-,-MIL-DTL-48555B 3 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to first article inspection in accordance with 4.2. 3.2 Conformance. A sample shall be subject to conformance inspection in accordance with 4.3. 3.3 Quadrant. The qu
14、adrant shall conform to drawing 13005101. 3.4 Environmental. 3.4.1 Storage temperature. The quadrant shall be thermally stabilized at temperatures of +160 5F and -60 5F for a period of not less than 4 hours at each temperature. While thermally stabilized at these temperatures, the quadrant shall be
15、inspected and shall not exhibit any signs of physical failure or damage. Upon return to and stabilization at standard ambient temperature, +60F to +90F, the quadrant shall meet the requirements of 3.5 through 3.14 inclusive. 3.4.2 Operating temperature. The quadrant shall meet the requirements of 3.
16、8 through 3.14 inclusive while exposed to and thermally stabilized at temperatures of +145 5F and -50 5F for a period of not less than 4 hours at each temperature. Upon return to and stabilization at standard ambient temperature, +60F to +90F, the quadrant shall meet the requirements of 3.5 through
17、3.14 inclusive. 3.4.3 Shock. The quadrant shall withstand a total of 75 shock impulses along 3 mutually perpendicular axes as defined in Figure 1. Each shock impulse shall be a half sine wave with a time duration of .010 .001 seconds and peak amplitude for each shock impulse as shown in Table I. Sub
18、sequent to shock, the quadrant shall show no evidence of damage or physical failure and shall meet the requirements of 3.5 through 3.14 inclusive. TABLE I. Shock orientation and impulse. Orientation Shock impulse and direction Number of impulses Longitudinal -90 gs, +90 gs 15 each direction Vertical
19、 -80 gs, +80 gs 15 each direction Transverse +80 gs 15 total Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-DTL-48555B 4 FIGURE 1. Orientation of shock loads. 3.4.4 Vibration “A”. The quadrant shall withstand a total of 270 minutes of sweep-cycl
20、e vibration. The vibration shall be applied for 90 minutes along each of the three mutually perpendicular major axes shown in Figure 1. A complete sweep-cycle shall consist of vibration from origin (5 Hz at 1 inch double amplitude) to mid-point (5 0.5 gs at 500 Hz) to origin, and shall have a durati
21、on of 15 1 minutes. Double amplitude shall be constant at 1 inch between 5 Hz and 10 Hz, and varied with frequency to maintain a constant 5 0.5 gs acceleration between 10 Hz and 500 Hz. Upon completion of vibration, the quadrant shall exhibit no evidence of damage or physical failure and shall meet
22、the requirements of 3.5 through 3.14 inclusive. 3.4.5 Vibration “B”. The quadrant shall be vibrated in the vertical plane shown in Figure 1 for a total of 15 1 minutes of sweep cycle vibration. A complete sweep-cycle shall consist of vibration from origin (5 Hz at 1 inch double amplitude) to mid-poi
23、nt (5 0.5 gs at 500 Hz) to origin, and shall have a duration of 15 1 minutes. Double amplitude shall be constant at 1 inch between 5 Hz and 10 Hz and varied with frequency to maintain a constant 5 0.5 gs acceleration between 10 Hz and 500 Hz. Upon completion of vibration, the quadrant shall exhibit
24、no evidence of damage or physical failure and shall meet the requirements of 3.5 through 3.14 inclusive. 3.5 Sealing. The quadrant shall be capable of sustaining an internal pressure of 5.0 0.10 pounds per square inch gage (psig) for a minimum of one hour with no evidence of leakage. 3.6 Purging. Th
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL48555B2012QUADRANTFIRECONTROLM17A1PDF

链接地址:http://www.mydoc123.com/p-444343.html