ARMY MIL-DTL-44475 A-1996 RELEASE PARACHUTIST'S INDIVIDUAL EQUIPMENT《降伞的工业设备的释放》.pdf
《ARMY MIL-DTL-44475 A-1996 RELEASE PARACHUTIST'S INDIVIDUAL EQUIPMENT《降伞的工业设备的释放》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-DTL-44475 A-1996 RELEASE PARACHUTIST'S INDIVIDUAL EQUIPMENT《降伞的工业设备的释放》.pdf(8页珍藏版)》请在麦多课文档分享上搜索。
1、NIL-DTL-44475A 999990b 202b305 09 9 MIL-DTL-44475A (GL) 9 September 1996 SUPERSEDING 8 November 1993 MIL-R-44475 (GL) DETAIL SPECIFICATION RELEASE, PARACHUTISTS INDIVIDUAL EQUIPMENT This specification is approved for use by the Natick Research, Development, and Engineering Center, Department of the
2、Army, and is available for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification covers one type of a fabric release assembly. 2. APPLICABLE DOCUMENTS 2.1 General. The documents listed in this section are specified in sections 3 and 4 of this specif
3、ication. This section does not include documents cited in other sections of this specification or recommended for additional information or as examples. While every effort has been made to ensure the completeness of this list, document users are cautioned that they must meet all specified requiremen
4、ts documents cited in sections 3 and 4 of this specification, whether or not they are listed. 2.2 Government documents. 2.2.1 Drawing. The following Government drawing forms a part of this document to the extent specified herein. Unless otherwise specified, the issue is that cited in the solicitatio
5、n. Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, U.S. Army Natick Research, Development, and Engineering Center, Attn: SSCNC-UTE Natick, MA O1 760-501 7 by using the self-addressed
6、Standardization Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. AMSC NIA FSC 1670 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-DRAWING U.S. ARMY NATICK RESEARCH, DEVELOPMENT AND ENGINEERING CENTER 1
7、 1 - 1-6860 - Release, Parachutists Individual Equipment (Copies of drawings are available from the U.S. Army Natick Research, Development and Engineering Center, ATTN: AMSSC-S-IMI, Natick, MA 01760-501 7). 2.3 Order of precedence. In the event of a conflict between the text of this document and the
8、 references cited herein, the text of this document takes precedence. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained. 3. REQUIREMENTS 3.1 First article. When specified (see 6.2), a sample shall be subjected to first article
9、 inspection in accordance with 4.2. 3.2 Materials and components. Materials and components shall conform to the requirements on the applicable drawings, to subsidiary specifications and standards applicable thereto, and as specified herein. 3.2.1 Recycled. recovered. or environmentally preferable ma
10、terials. Recycled, recovered, or environmentally preferable materiais should be used to the maximum extent possible provided the material meets or exceeds the operational requirements, and promotes economically advantageous life cycle costs. 3.3 Construction. The construction shall conform in all re
11、spects to the drawing listed in Section 2 and all subsidiary drawings pertaining thereto, and as specified herein. 3.3.1 Stitching. machine. All machine stitching shall be as specified on the applicable drawings and as specified herein. 3.3.1.1 Tvpes 301 and 308 stitching. Ends of all type 301 stitc
12、hing shall be backstitched or overstitched not less than 1/2 inch in accordance with the required stitch pattern. Ends oftype 308 stitching shall be secured by crowding a minimum of three stitches (accomplished by not allowing the materials to move) at the beginning and end of the stitching. Thread
13、tension shall be maintained so that there will be no loose stitching resulting in the puckering of the material sewn. The lock shall be embedded in the materials sewn. 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I IlIL-DTL-44475A 999990b 202b30
14、7 b8L MIL-DTL-44475A (GL) 3.3.1.1.1 Repairs of type 301 stitching. Repairs of type 301 stitching shall be as follows: a. When thread breaks or bobbin run-outs occur during the stitching, the stitching shall be repaired by restarting the stitching a minimum of 1 inch (1/2 inch for box-x and W-W stitc
15、hing) fiom the end of the stitching. L/ b. Thread breaks or two or more consecutive skipped or run-off stitches noted during inspection of the item (in-process or end item) shall be repaired by overstitching. The stitching shall start a minimum of 1 inch from the defective area, (U2 inch for box-x a
16、nd W-W stitching), continue over the defective area, and continue a minimum of 1 inch (1/2 inch for box-x and W-W stitching) beyond the defective area onto the existing stitching. Loose or excessively tight stitching shall be repaired by removing the defective stitching, without damaging the materia
17、ls, and restitching in the required manner. L/ - 1 / When making the above repairs, the ends of the stitching are not required to be backstitched. 3.3.1.1.2 Repairs of type 308 stitching. Repairs of type 308 stitching shall be in accordance with 3.3.1.1.1 a and 3.3.1.1.1 b, except that the stitching
18、 shall overstitch the defective area a minimum of three stitches onto the existing stitches. 3.3.1.2 Automatic stitching. Automatic stitching machines may be used to perform any of the required stitch patterns provided the requirements for the stitch pattern, stitches per inch, and size and type of
19、thread are met, and at least three or more tying, overlapping, or back stitches are used to secure the ends of stitching. 3.3.2 Thread ends. All thread ends shall be trimmed to a maximum length of 1/4 inch. 3.3.3 Setting of grommets. Holes shall be prepunched to receive the grommets. Holes prepunche
20、d to receive the grommets shall be smaller than the outside diameter of the grommet barrel so that the barrel must be forced through the hole. The grommet shall be securely clinched without cutting the adjacent material. 3.3.4 Finishing of the iacketed wire rope ends. All *re rope ends shall be fini
21、shed by either the melt method specified in 3.3.4.1 or by the dip method specified in 3.3.4.2 such that the ends are completely enclosed with the melted coating flush with the unmelted nylon jacket. 3.3.4.1 Melt method. Heat the wire rope end nylon jacket with a suitable electrical heating element s
22、o as to melt the nylon over the end to form a smooth round surface. Remove any melted residue on the jacket surface with a fine abrasive material such that the surface is not damaged and is finished smooth. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I
23、HS-,-,-MIL-DTL-44475A m qmwob 2026308 518 m I 1 MIL-DTL-44475A (GL) 3.3.4.2 Dip method. Coat the wire rope end with a nylon II or nylon 6/6 powder. Heat the coated end for 10 seconds at 405 & 15F using either an induction coil (2 to 4-inch) with an automatic timer control or an electric melting pot
24、with an automatic temperature control (see 6.3). 3.4 Replacement of defective components. During the spreading, cutting and manufacturing process, components having material defects or damages that are classified as defects in table I shall be removed from production and replaced with nondefective a
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILDTL44475A1996RELEASEPARACHUTIST SINDIVIDUALEQUIPMENT 工业 设备 释放 PDF

链接地址:http://www.mydoc123.com/p-444289.html