ARMY MIL-D-50476-1971 DETONATOR ELECTRIC M78E1 PARTS AND LOADING ASSEMBLING AND PACKING《M78E1电雷管零件及其装载 组装和包装》.pdf
《ARMY MIL-D-50476-1971 DETONATOR ELECTRIC M78E1 PARTS AND LOADING ASSEMBLING AND PACKING《M78E1电雷管零件及其装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-50476-1971 DETONATOR ELECTRIC M78E1 PARTS AND LOADING ASSEMBLING AND PACKING《M78E1电雷管零件及其装载 组装和包装》.pdf(26页珍藏版)》请在麦多课文档分享上搜索。
1、 . I NIL-D-50476 13 W 797790b 0327632 5 = !. . . . .i. .: ?- .-L. . . MI L- D - 5 O 4 7 ( XU ) 24 June 1971 (See 6.7) MILITARY SPECIFICATION . I b I . DETONATOR, ELECTRIC, N78Ei PARTS AND LOADING, ASSEMBLING AND PACKIIIIG 1. SCOPE 1.1 Tds specification covers the inspection of the parts . and the lo
2、ading, assembling and packing of one type or electric detonator esignated as Detonator, Electric, i478E1. 2. APPLICABLE DOCUME“ 2.1 The following documents of theissue in effect on date of invitation for bids form a part of this specification to the extent specified herein. SPECIFICATONS . MILITARY
3、MIL-P-116 MIL-B- i1 7 MIL-A-1 4 8 MIL.-A-2550 - - / ._. . -6TAMDARDS . .MILITARY - Preservation Method of - Bag, Interior Packaging - Aluminum Foil - Armunition and Special Weapons; General Specification for MIL-STD- 1 O 5 - MIL-STD-109 - MIL-STD-331 .- MIL-STD-1168 - 4IL-STD-1235 - I -_ i t I Sampl
4、ing Procedures and Tables For Quality Assurance Terms and Definitions Fuze and Fuze Components, Environmental and Performance Test for Lot Humbering of Ammunition Single and Multilevel Continuous Sampling Proceaures and Tables for Inspection by Attributes Inspection by Attributes (ABC-STD-105) , FSC
5、: 1375 P THIS DOCUMENT CONTAINS -The detonator assembly shall comply with 3.4.1 Time.-The detonator assembly shall fire on tne first attempt within one hundred and twenty (120) microseconds when tested as specified in 4.4.7.1. . 3.4.2 Output.-The detonator assembly shall fire on the first attempt an
6、d shall make a 3/16 inch minimum (min.) diameter perforation in a .131i5 inch thick lead disc when tested as specified in 4.4.7.2. 3.4.3 Detonator that fails to fire on the first attempt (Duds).-The detonator assembly shall not fail to fire on the first attempt when tested as specified in 4.4.7.3. 3
7、.5 Waterproofness.-The detonator assembly shall comply with the requirements of 3.4.2 and 3.4.3 when tested as specified in 4.4.7.2. 3.6 Environmental 3.6.1 3.6.2 Temperature and humidity.-The detonators shall comply Lead circuit resistance, thermal shock, and vibration.- with 3.4.1 when tested as s
8、pecified in 4.4.10.1. The detonators shall comply with the lead circuit resistance requirement of dwg. 924.8640 and with 3.4.1 when tested as specified in 4.4.10.2. 3.6.3 Cold temperature.-The detonator assembly shall comply with 3.4.3 when tested as specified in 4.4.10.3. . 3.6.4 Hot tmperature.-Th
9、e detonator assembly shall comply with 3.4.3 when tested as specified in 4.4.10.4. 3.6.5 Jolt test.-The detonator assembly shall not function during the test, and shall be safe to handle after the test specified in 4.4.10.5. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted with
10、out license from IHS-,-,-MIL-D-50LI76 13 7779706 0327635 O MIL-D-50476 (MU) 3.7 Workmanship.-All parts shall be fabricated and loaaed in a thorough, workmanlike manner. They shall be free of burrs, sharp edges, cracks, dirt, rust and other foreign matter. The cleaning me.thod used shall not be injur
11、ious to any part nor shall the parts be contaminated by the cleaning agent. Exterior surface coatings, shall be continuous except for a few light scratches not exposing base material. All required markings shall be neat and sharply defined. 3.8 First article inspection.-This specification makes prov
12、isions for first article inspection. Requirements for the submission of first article sample by the contractor shall be as specified in the contract. 4. QUALITY ASSURANCE PROVISIONS - . -. .- 4.1 Responsibility for inspection.-Unless otherwise specified in the contract or purchase order, the supplie
13、r is responsible for the performance of all inspection require- ments as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any ather facilities suitable for the performance of the inspection requirements specified herein, unless disapproved by
14、the Government. The Government reserves the right to perform any of the inspe.ctions set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to prescribed requirements. Reference shall be made to MIL-STD-109 to define terms used herein. The
15、provisions of MIL-A-2550 shall apply. lot of items deliverable under the contract is submitted to the Government for acceptance, the contractor shall supply the following information acc,ompanied by a certificate which attest that the information provided is correct and applicable to the product bei
16、ng submitted: a, A statement that the lot complies with all of the quality assurance provisions specified in this specification. b. Drawing and specification number and date, together with identification and date of changes thereto. C. A statement that all material purchased by the contractor meets
17、requirements, when such material is controlled by Government or commercial specifications referenced in any of the contractual documents, and that certificates of conformance are on file and available for review. I 4.1.1 Submission of product.-At the time each completed d. Number of items in the lot
18、. e. Date submitted. I. _. . t. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-5047b 13 I 799990b 0327636 2 I MIL-D-5047 (KiJ) The certificatelshall be signed by a responsible agent of the certifying organization. The initial certificate submi
19、tted shall be substantiated by evidence of the agents authority to bind his principal. Substantiation of the agents authority will not be required with subsequent certificates unless, during the course of the contract, this authority is vested in another agent of the certifying organization. . 4.2 F
20、irst article inspection 4.2.1 Submission.-Prior to the start of regular production, the contractor shall submit a frist article sample (see 6.1) $0 a Government approved facility as designated by the con- tracting officer for evaluation as specified herein. The first article sample shall consist of
21、inert parts and sub- assemblies (see 4.2.4) and loaded detonators (see 4.2.5) , which have been produced by the contractor or furnished by a supplier and which have been manufactured using the same pro- duction processes, procedures and equipment which will be used in fulfilling the contract. All pa
22、rts and materials, including packaging and packing, shall be obtained from the same source of supply as will be used in regular production. Prior to submission, the contractor shall inspect the sample to the degree necessary to assure that it conforms to the require- ments of the contract and submit
23、 a record of this inspection with the sample, including certificates of conformance for materials. A sample containing known defects will not be submittea unless specifically authorized by the contracting officer. A first article sample, or portion thereof, as directed by the contracting officer, sh
24、all also be submitted whenever there is a lapse in production for a period in excess of 90 days or whenever a change occurs in manufacturing process, material used,.drawing or specification such as to significantly affect product uniformity as determined by the Government. . 4.2.2 1nert.parts.-A sam
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD504761971DETONATORELECTRICM78E1PARTSANDLOADINGASSEMBLINGANDPACKINGM78E1 雷管 零件 及其 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442455.html