ARMY MIL-D-2087 C-1971 DEMOLITION KIT TORPEDO BANGALORE M1A2 HE LOADING ASSEMBLING AND PACKING《M1A2型高爆炸药鱼雷炸药桶拆卸工具包的装载 组装及包装》.pdf
《ARMY MIL-D-2087 C-1971 DEMOLITION KIT TORPEDO BANGALORE M1A2 HE LOADING ASSEMBLING AND PACKING《M1A2型高爆炸药鱼雷炸药桶拆卸工具包的装载 组装及包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-2087 C-1971 DEMOLITION KIT TORPEDO BANGALORE M1A2 HE LOADING ASSEMBLING AND PACKING《M1A2型高爆炸药鱼雷炸药桶拆卸工具包的装载 组装及包装》.pdf(10页珍藏版)》请在麦多课文档分享上搜索。
1、SUPERSEDIKG -x.- _ - - MIL-D-2087B (!PU) 27 August i968 . -. NILITARY SPECIFIC AT ION -_=_3/ DENOLITION KIT, TORPEDO BANGALORE, M1A2, HE LOADING, ASSEMBLING AND PACKING .:;I 1. SCOPE 1.1 This specification covers the loading, assembling and packing for one type of demolition kit designated as Demoli
2、tion Kit, Bangalore Torpedo, M1A2, HE. 2. APPLICABLE DOCUMENTS Ii - 51 2.1 The following documents of the issue in effect on date of invitation for bids or request for proposals, form a part of. this specification to the extent specified herein, SPECIFICATIONS MILITARY t MIL-A-2550 - Ammunition and
3、Special Weapons: . -. General Specification For. t - .- STANDARDS MILITARY PIIL-STD-105 - Sampling Procedures and Tables for Ins ection by Attributes (ABC-STD- MIL-STD-109 - Quality Assurance Terms and Definitions MIL-STD-650 7 Explosive:c Sampling, Inspection and MIL-STD-1168 - MIL-STD-1235 - Singl
4、e and Multilevel Continuous r. 105 P Testing Lot Numbering of Ammunition Sampling Procedures and Tables for Inspection by Attributes DRAWINGS Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-.- I - . flIL-D-2087C 13 M 999990b 0293720 23 MIL-D-SO87C (M
5、U) . 8863370 - Loading Assembly 9216100 - Box, Packing, Ammunition for Kit, Demolition, Bangalore Torpedo, M1A2 PUBLICATIONS U. S. ARNY MUNITIONS CObINAND ET - 8863369 - Equipment Tabulation .(Copies of specification, standards, drawings and publications required by suppliers in connection with spec
6、ific procurement functions should be obtained from the procuring activity or as directed by the contracting officer.) 3 . REQUIREPENTS 3. 3.2 Material.-Materials shall be in accordance with Assembly.-The Demolition Kit, Bangalore Torpedo, M1A2 Assembly shall comply with all requirements specified on
7、 Drawings (dwgs.) 8863369, 8863370 and with all requirements specified in . applicable drawings and specifications. . - applicable specifications. . .3.3 3.4 Functioning.-The loaded bangalore torpedo shall. detonate Workmanship.-All parts and assemblies shall be fabricated high order when tested as
8、specified in 4.3.2. . and loaded in a thorough, workmanlike manner. They shall be free of explosive on exterior, chips, cracks, dirt, grease, ruse, corrosion products and other foreign material. The cleaning method used shall not be inJurious to any part nor shall the parts be contaminated by the cl
9、eaning agent. coatngs shall be continuous except for a few light scratches not exposing the base material. A11 required markings shall be neat and sharply define. Exterior surface 4 i QUALITY ASSURANCE PROVISIONS :4.1 Responsibility for inspection.-Unless otherwise -specified in the contract OP purc
10、hase order, the supplier is responsible for the performance of all inspection require- ments as specified herein. Except as otherwise specified in the contract or order, the supplier may use his own or any other facilities suitable for the performance of the inspection requirements specifled herein,
11、 unless disapproved by the Government. form any of the inspections set forth in the specification where such inspections are deemed necessary to assure supplies and services conform to ppescribed requirements. Reference shall be made to MIL-STD-109 to define terms used herein. The provisions of MIL-
12、A-2550 shall apply. 2 I The Government reserves the right to per- Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-4.1.i Subrnission of product.-At the tirne the completed lot of items delivepable under the contract issubmitted to the Government fop a
13、cceptance, the contractor shall supnly the following information accompanied by a certificate which ,attests that the information provided is correct and applic- able to the product being submitted: a. A statement that the lot complies with all of the . quality assurance provisions specified Ln this
14、 specification. b. Drawing and specification number and date, together with an identification and date of changes thereto. c. A statement that all material purchased by the contractor meets requirements, when such material is controlled by Government or corniercial specifications referenced in any o
15、f the contractual documents, and that certificate of conformance ,are on file an6 available for review. The certificate shall be signed by a responsible agent of the certifying organization. be substantiated by evldence of the agents authority to bind his-principal. be required with subsequent certi
16、ficates unless, during the course of the contract, this authority is vested in another d. Number of items in te lot. .e. Date submitted. The initial qertificate submitted shall Substantiation of the agents authority will not .- agent of the certifying organization. 4.2 Inspection Provisions 4.2.1 Lo
17、t formation.-The term “inspection lot“ as used in this specification is defined as an essentially homogen- eous collection of units of product from which a representa-. tive sample is drawn and inspected to determine conformance with applicable requirementis. The sample selected shall represent only
18、 that quantity of units from which the sample was drawn and shall not be construed to represent any prior or subsequent quantities presented for inspection. Homogene- ity shall be considered to exist provided the inspection lot has been produced by one manufacturer in one unchanged process Using the
19、 same materials and methods in accordance with the same drawings, same drawing revisions, sane specifications and same specification-revisions and complies with the pro- visions far submission of product as specified in MIL-STD-105. Changes to the process, specificatLons, or drawings not affect- ing
20、 safety, performance, interchangeability, or storage, as determined by the Gave-rnment, shall not be deemed to alter the homogeneity of an inspection lot. All material submitted for inspection in accordance with this specification shall t comply with the homogeneity criteria specified herein regard-
21、 less of the type of saiap1in.g procedure which ia being applied to determine conforniance with requiremenks. Lot numbering, as required, shall be in accordance with MIL-STD-1168. 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-2087C (MU) Eac
22、h lot of bangalore torpedo demolition kits shall contain: a. Parts from not mope than one lot interfix limber b. c. from one manufacturer. thn two lots from one manufacturer. than one lot interfix number from one fianufacturer which con- tains TNT from not more than one lot intr*fix number from one
23、manufacturer. 4.2.2. .Exminutlon.-Thc examinations llsted in the following subperagraphs shall be performed on inspection lots (see 4.2.1) of the cornpoiieiits or assemblies designated in the applicable paragraph headings. Inspection for critical defects (and major defects, when so specified) shall
24、be 100 percent. Sampliiig plans for major and minor defects shall be in accordance with MIL-STD-105 except that continuou plans in accordance with MIL-STD-1235 may be used if by the Government, Instead of applying the AQLs designatedx he.rein to the groups of major and minor defects listed, the cont
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD2087C1971DEMOLITIONKITTORPEDOBANGALOREM1A2HELOADINGASSEMBLINGANDPACKINGM1A2 爆炸 鱼雷 炸药 拆卸 工具包 装载

链接地址:http://www.mydoc123.com/p-442346.html