ARMY MIL-D-20505 D-1984 DETONATION SIMULATOR EXPLOSIVE M80 LOADING ASSEMBLING AND PACKING《M80型炸药引爆模拟器的装载 组装和包装》.pdf
《ARMY MIL-D-20505 D-1984 DETONATION SIMULATOR EXPLOSIVE M80 LOADING ASSEMBLING AND PACKING《M80型炸药引爆模拟器的装载 组装和包装》.pdf》由会员分享,可在线阅读,更多相关《ARMY MIL-D-20505 D-1984 DETONATION SIMULATOR EXPLOSIVE M80 LOADING ASSEMBLING AND PACKING《M80型炸药引爆模拟器的装载 组装和包装》.pdf(20页珍藏版)》请在麦多课文档分享上搜索。
1、I a-3 7-1 7 MIL-D-20505D (AR) 15 MAY 1984 _. - il SUPERSE DING MIL-D-20505C (PA) 21 December 1973 MILITARY SPECIFICATION DETONATION, SIMULATOR, EXPLOSIVE, M80 LOADING, ASSEMBLING AND PACKING This specification is approved for use by the U.S. Army Armament, Munitions and Chemical Command, and is avai
2、lable for use by all Departments and Agencies of the Department of Defense. 1. SCOPE 1.1 Scope. This specification contains requirements not covered by the drawings and provides quality assurance provisions for the fabrication of parts, assembly and packing for M80 Explosive Detonation Simulator. 2.
3、 APPLICABLE DOCUMENTS 2.1 Government documents. 2.1.1 Specifications and standards. Unless otherwise specified (see 6.2) , the following specifications and standards of the issue listed in that issue of the Department of Defense Index of Specifications and Standards (DoDISS) specified in the solicit
4、ation, form a part of this specification to the extent specified herein. SPECIFICATIONS MILITARY MIL -A- 4 80 7 8 - Ammunition, Standard Quality Assurance Provisions, General Specification For STANDARDS MILITARY MIL -STD- 105 - Sampling Procedures and Tables for I nspec ti on by At t ri but es FSC 1
5、370 Beneficial comments (recommendations, additions, deletions) and any pertinent data which may be of use in improving this document should be addressed to: Commander, US Arm Armament Research and Development Center, Attn. DRSMC-QA, Dover, New Arsey 07801 by using the self-addressed Standardization
6、 Document Improvement Proposal (DD Form 1426) appearing at the end of this document or by letter. Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-20505D 13 bl 777770b 030LL02 b =; A MIL-D-20505D (AR) MIL-STD-331 - Fuze and Fuze Components, Envi
7、ron- mental and Performance Tests For 2.1.2 Other Government documents, drawings, and publications. The following other Government documents, drawings, and publications form a part of this specification to the extent specified herein. DRAWINGS (See 6.5) U .S. ARMY ARMAMENT RESEARCH AND DEVELOPMENT .
8、CENTER (ARDC) PRODUCT PACKAGING DRAWINGS 9 2 34 991 - Detonation Simulator, Explosive, M80 8853677 - Box, Paperboard, Packing Ammunition for Detonation Simulator , Explosive, M80 8853678 - Box, Packing, Ammunition for Detonation Simulator , Explosi ve, M80 (Copies of specifications, standards, handb
9、ooks, drawings, and publications required by manufacturers in connection with specific acquisition functions should be obtained frm the contracting activity or as directed by the contracting officer .) 2.1.3 Order of precedence. In the event of a conflict between the text of this specification and t
10、he references cited herein, the text of this specification shall take precedence. 3. REQUIREMENTS 3.1 Materials. Materials and parts shall be in accordance with applicable drawings and specifications. 3.2 Assembly. The assembly shall comply with all requirements specified on Drawing (dwg.) 9234991 a
11、nd with all requirements specified on applicable specifications. 3.3 Moisture content. 3.3.1 Charge composition. The moisture content of the charge . composition at the loading station at the time of loading the assembly shall not be more than 0.50 percent when tested in accordance with paragraph 4.
12、4.3.1. paper and paper products at the loading station at the time of loading shall be not more than 6.0 percent. 3.3.2 Paper and paper products. The moisture content of the 2 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-20505D 13 7777906 03
13、0LL03 MIL-D-20505D (AR) 3.4 Functioninq. The assembly shall function and comply with 3.4.1 Premature. The assembly shall not function in less than the following requirements. three (3) seconds after initiation of the fuse. 3.4.2 Sound level intensity. The assembly shall produce a peak sound level in
14、tensity of 105 decibels minimum (min.). 3.5 Sensitivity. The assembly shall show no evidence of ignition or detonation when subjected to a weight of not less than five (5) pounds dropped from a height of two (2) feet, min. when tested as specified in 4.5.3. 3.6 Jumble test. The assembly shall show n
15、o evidence of loose powder and shall comply with the requirements of MIL-STD-331, Test 102. 3.7 Quick leak test. The packed box sealed in the barrier bag shall show no evidence of air or water leakage when tested as specified in 4.5.6. 3.8 First article inspection. This specification makes provision
16、s for first article inspection. Requirements for the submission of first article samples by the contractor shall be as specified in the contract. 3.9 Workmanship. All parts and assemblies shall be fabricated and loaded in a thorough, workmanlike manner. They shall be free of tears, fractures and for
17、eign matter. All required markings shall be neat and sharply defined. All parts shall be dry. 4. QUALITY ASSURANCE PROVISIONS 4.1 Responsibility for inspection and standard qualit assurance provisions. Unless otherwise specified herein o: in the contract, the provisions of MIL-A-48078 shall apply an
18、d are hereby made a part of this detail specification. 4.2 Classification of inspections. The following types of inspection shall be conducted on this item: a. First Article Inspection b. Quality Conformance Inspection 3 Provided by IHSNot for ResaleNo reproduction or networking permitted without li
19、cense from IHS-,-,-NIL-D-20505D 13 H 779770b 03OLlOLI T 4.3 First article inspection 4.3.1 Submission. The contractor shall submit a first article sample as designated by the Contracting Officer for evaluation in accordance with provisions of 4.3.2. consist of the sample quantities as indicated in T
20、able I The first article sample shall 4.3.2 Inspections to -_I- be performed. See MIL-A-48078 and Table I - specified herein. 4.3.3 Rejection. See MIL-A-48078. 4 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-8 . k F .rl 01 8 t ri w MIL-D-20505D 13
21、m 7777706 0301105 1 m I rl (u m dmdm (u (u (u (ummm dddd d d d d d d dddd . . . II .e (u fi (u (umU)d m m m mmmm . I. (u I O m O O O O m VI Ln VI mmmd 5 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-P c U C U C c I r: . i 5 c r E cn 8 ni t5 t ni ln
22、 o b ni ni cv d d d d e d ni ni u m cr) m I . 61 ri a, CQ v1 ci U al % Q, c 6 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-MIL-D-20505D 13 9999906 0301107 5 MIL-D-205 O5 D ( AR) 4. Quality conformance inspection. 4.4.1 Inspection Lot formation. In
23、spection lots shall comply with the lot formation provisions of MIL-A-48078. * 4.4.2 Examination. See MIL-A-48078. a. Sampling plans. Unless otherwise specified in the Classification of Defects and Test tables, sampling plans and procegures for major and minor defects shall be in accordance with MIL
24、-STD-105, Inspection Level II. 7 Provided by IHSNot for ResaleNo reproduction or networking permitted without license from IHS-,-,-I-! b t I-! ri I al E k a, c c 9 w i (u Id- . ni nini0 m mmm . v) .A Id a e a Provided by IHSNot for ResaleNo reproduction or networking permitted without license from I
- 1.请仔细阅读文档,确保文档完整性,对于不预览、不比对内容而直接下载带来的问题本站不予受理。
- 2.下载的文档,不会出现我们的网址水印。
- 3、该文档所得收入(下载+内容+预览)归上传者、原创作者;如果您是本文档原作者,请点此认领!既往收益都归您。
下载文档到电脑,查找使用更方便
10000 积分 0人已下载
下载 | 加入VIP,交流精品资源 |
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- ARMYMILD20505D1984DETONATIONSIMULATOREXPLOSIVEM80LOADINGASSEMBLINGANDPACKINGM80 炸药 引爆 模拟器 装载 组装 包装 PDF

链接地址:http://www.mydoc123.com/p-442343.html